Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 13851-13860 of 14772 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
215018Project ID: 215018
DEA: 051J4804
EFIS: 0517000185
05-SBT-25,156-54.048SAN BENITO HIGHWAY 25 AT 156 ROUNDABOUT - SAFETY IMPROVEMENTSSAN BENITO COUNTY NEAR HOLLISTER ON ROUTE 25 FROM 0.4 MILE EAST TO 0.3 MILE WEST OF ROUTE 156 AND ON ROUTE 156 FROM 0.4 MILE SOUTH TO 0.3 MILE NORTH OF ROUTE 25 1 (09/03/2020)Details
Personnel
215019Project ID: 215019
DEA: 032H3804
EFIS: 0317000103
03-GLE-162-65.5/65.5OC Freeway Structure Lighting  1 (07/20/2020)Details
Personnel
215021Project ID: 215021
DEA: 051E0004
EFIS: 0513000023
05-SB-101-R56.2/58.0PAVE GORE AREA, UPGRADE GUARDRAILING, AND MODIFY DRAINAGESANTA BARBARA COUNTY IN AND NEAR BUELLTON FROM 0.2 MILE SOUTH OF SANTA ROSA ROAD OVERCROSSING TO 0.3 MILE NORTH OF NORTH BUELLTON OVERCROSSING 1 (09/03/2020)Details
Personnel
215022Project ID: 215022
DEA: 060U1704
EFIS: 0616000206
06-MAD-99-9.7BRIDGE DECK RESURFACE.MADERA COUNTY IN MADERA AT SOUTH GATEWAY DRIVE OVERCROSSING BRIDGE04/16/20211 (06/17/2020)Details
Personnel
215023Project ID: 215023
DEA: 060U4704
EFIS: 0615000301
06-KER,KIN-5-81.7/87.0,0.0/0.3CONSTRUCT CRCP, JPCP AND INSTALL TRAFFIC MONITORING STATIONS.KERN AND KINGS COUNTIES NEAR KETTELMAN CITY FROM 0.6 MILE SOUTH OF TWISSELMAN ROAD OVERCROSSING TO 0.3 MILE NORTH OF KERN/KINGS COUNTY LINE 1 (06/17/2020)Details
Personnel
215024Project ID: 215024
DEA: 07311604
EFIS: 0715000011
07-LA-134-2.6/4.8PLACE ROCK BLANKET, MINOR CONCRETE AND MODIFY IRRIGATION SYSTEM.LOS ANGELES COUNTY IN BURBANK AND LOS ANGELES FROM BOB HOPE DRIVE UNDERCROSSING TO RIVERSIDE DRIVE OVERCROSSING 1 (09/02/2020)Details
Personnel
215025Project ID: 215025
DEA: 09363404
EFIS: 0915000002
09-INY-178-43.4CONSTRUCT BOX CULVERTS.INYO COUNTY NEAR SHOSHONE AT 0.5 MILE EAST OF SOUTH JUNCTION ROUTE 17804/27/20211 (10/30/2020)Details
Personnel
215026Project ID: 215026
DEA: 100X6704
EFIS: 1016000027
10-STA-99-R13.9/R17.5INSTALL SLOPE PAVING, MINOR CONCRETE AND PLACE HOT MIX ASPHALT.STANISLAUS COUNTY IN AND NEAR MODESTO AT VARIOUS LOCATIONS FROM SOUTH MODESTO UNDERCROSSING TO WOODLAND AVENUE OVERCROSSING09/23/20211 (06/15/2020)Details
Personnel
215027Project ID: 215027
DEA: 101H3424
EFIS: 1018000078
10-SJ-5-10.6BRIDGE RAIL REPLACEMENT.SAN JOAQUIN COUNTY NEAR LATHROP AT DEUEL OVERHEAD 1 (06/15/2020)Details
Personnel
215028Project ID: 215028
DEA: 120Q6904
EFIS: 1217000088
12-ORA-5,22,55,57,73,etc-varRECONSTRUCT INDUCTIVE, VEHICLE DETECTION, AND RAMP METERING SYSTEMS.ORANGE COUNTY AT VARIOUS LOCATIONS 1 (11/12/2020)Details
Personnel