Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 13701-13710 of 16653 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
214781 | Project ID: 214781 DEA: 044J3704 EFIS: 0415000334 MINOR: 04A5391 | 04--VAR-VAR | rehabilitation, restoration and replacement services for non-operational electrical systems | The services shall be performed at various locations on Caltrans highways through the following counties: Alameda, Contra Costa, Santa Clara, San Mateo, San Francisco, Sonoma, Marin, Napa, and Solano. | 1 (03/03/2020) | Details CEM-3701 Report | |
214782 | Project ID: 214782 DEA: 071XQ004 EFIS: 0720000180 | 07-LA-105- | LA 105 - Repair damaged roof of the office building | 1 (03/16/2020) | Details CEM-3701 Report | ||
214785 | Project ID: 214785 DEA: 031G5404 EFIS: 0318000316 | 03-COL,GLE-32,45-VAR | REMOVE AND REPLACE CULVERTS AND INSTALL CURED-IN-PLACE PIPELINER. | COLUSA AND GLENN COUNTIES AT VARIOUS LOCATIONS | 03/16/2021 | 1 (03/24/2020) | Details CEM-3701 Report |
214783 | Project ID: 214783 Permit Numbers: 1119NUR0675 1119NRW0703 1119NRW0891 1120NRT0116 | 11-IMP-8-36.5/37.5 | enter upon State Highway right of way in Imperial County, City of El Centro, on Interstate 8, post mile R36.50 to R37.50, to replace existing 18-inch diameter steel water pipeline with new PVC water pipeline and extension of storm drain pipeline to IID structure by Horizontal Directional Drilling | INTERSTATE 8, EL CENTRO | 08/24/2021 | 1 (03/02/2020) | Details CEM-3701 Report |
214784 | Project ID: 214784 DEA: 023H8104 EFIS: 0218000036 | 02-LAS,PLU-36,70,89,395-VAR | PAINT BRIDGE STEEL, SEAL AND OVERLAY DECKS AND REPLACE BEARINGS. | LASSEN AND PLUMAS COUNTIES AT VARIOUS LOCATIONS | 08/04/2022 | 1 (03/20/2020) | Details CEM-3701 Report |
214786 | Project ID: 214786 DEA: 031G6204 EFIS: 0319000048 | 03-COL-16-0.5/6.7 | REPLACE CULVERTS, HEADWALLS AND INSTALL CURED-IN-PLACE PIPELINER. | COLUSA COUNTY AT VARIOUS LOCATIONS FROM 0.5 MILE SOUTH OF ROUTE 20 TO 0.4 MILE NORTH OF O'LEARY STREET | 03/16/2021 | 1 (03/24/2020) | Details CEM-3701 Report |
214787 | Project ID: 214787 DEA: 032H0804 EFIS: 0317000059 | 03-SAC-160-L3.9 | INSTALL CHANGEABLE MESSAGE AND CAMERA SYSTEMS, & PLACE SIGN STRUCTURE. | SACRAMENTO COUNTY NEAR ANTIOCH AT 3.9 MILES NORTH OF CONTRA COSTA COUNTY LINE | 09/30/2021 | 1 (03/24/2020) | Details CEM-3701 Report |
214788 | Project ID: 214788 DEA: 032H4604 EFIS: 0317000114 | 03-YOL-84-13.3/15.7 | PLACE HMA AND ROADWAY EXCAVATION. | YOLO COUNTY NEAR WEST SACRAMENTO FROM 3.7 MILES NORTH OF CLARKSBURG ROAD TO 4.0 MILES NORTH OF BABEL SLOUGH ROAD | 03/16/2021 | 1 (03/24/2020) | Details CEM-3701 Report |
214789 | Project ID: 214789 DEA: 081K0204 EFIS: 0818000157 | 08-SBD-40-R10.0/R154.6 | PLACE THERMOPLASTIC TRAFFIC STRIPE AND TRAFFIC STRIPE TAPE. | SAN BERNARDINO COUNTY NEAR BARSTOW FROM 2.8 MILES EAST OF A STREET TO ARIZONA STATE LINE | 12/04/2020 | 1 (12/04/2020) | Details CEM-3701 Report |
214790 | Project ID: 214790 DEA: 101H3204 EFIS: 1018000021 | 10-STA-5-20.0,26.3 | REALIGN CABLE AND THRIE BEAM MEDIAN BARRIERS AND CONSTRUCT PASSAGEWAYS | STANISLAUS COUNTY NEAR WESTLEY AT 0.7 MILE SOUTH OF KERN CREEK ROAD UNDERCROSSING AND 0.7 MILE NORTH OF KHALSA ROAD UNDERCROSSING | 06/27/2022 | 1 (03/16/2020) | Details CEM-3701 Report |