Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 13461-13470 of 17277 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
214520Project ID: 214520
DEA: 051H9804
EFIS: 0517000043
05-SB-101-78.4/79.0ROADWAY EXCAVATION, PLACE AGGREGATE BASE, HMA AND RHMA-G.SANTA BARBARA COUNTY NEAR SANTA MARIA FROM 0.3 MILE SOUTH TO 0.3 MILE NORTH OF SOLOMON SUMMIT UNDERCROSSING09/25/20201 (02/20/2020)Details CEM-3701 Report
214509Project ID: 214509
DEA: 060S4104
EFIS: 0614000140
MINOR: 06A2562
06--99-44.0/49.4Install shoulder rumble stripKern County from 0.4 mile south of Junction 46/99 Seperation to Sherwood Avenue Overcrossing11/29/20221 (01/31/2020)Details CEM-3701 Report
214510Project ID: 214510
DEA: 010C9704
EFIS: 0113000094
01-HUM-101-79.9/86.3ROADWAY EXCAVATION, PLACE HMA & HIGH TENSION CABLE BARRIER.HUMBOLDT COUNTY IN AND NEAR EUREKA AND ARCATA AT VARIOUS LOCATIONS FROM EUREKA SLOUGH BRIDGE TO 11TH STREET OVERCROSSING03/24/20211 (11/13/2019)Details CEM-3701 Report
214511Project ID: 214511
DEA: 010E0004
EFIS: 0113000091
01-HUM-101-84.4/84.8BRIDGE RAIL REPLACEMENT.HUMBOLDT COUNTY NEAR ARCATA FROM JACOBY CREEK BRIDGE TO GANNON SLOUGH BRIDGE11/22/20231 (11/13/2019)Details CEM-3701 Report
214512Project ID: 214512
DEA: 010F2204
EFIS: 0115000092
01-HUM-101-80.1/84.3ROADWAY EXCAVATION, PLACE HMA AND AB.HUMBOLDT COUNTY NEAR EUREKA AT VARIOUS LOCATIONS FROM 0.3 MILE SOUTH OF COLE AVENUE TO 0.4 MILE NORTH OF BAYSIDE CUTOFF03/09/20221 (11/13/2019)Details CEM-3701 Report
214513Project ID: 214513
DEA: 021H3904
EFIS: 0216000041
02-SHA-5-R32.0/R32.3O'BRIEN DECK AND RAIL REHAB: WEATHER INFO SYSTEM, STRUCTURAL CONCRETE, HMA, REMOVE BRIDGE BARRIER.SHASTA COUNTY ABOUT 10 MILES SOUTH OF LAKEHEAD FROM 0.1 MILE SOUTH TO 0.3 MILE NORTH OF O'BRIEN UNDERCROSSING09/28/20211 (01/22/2020)Details CEM-3701 Report
214514Project ID: 214514
DEA: 022H9704
EFIS: 0217000043
02-SHA-273-4.4,11.8/12.3INSTALL CMS, CCTVSHASTA COUNTY AT VARIOUS LOCATIONS FROM BARNEY ROAD TO 0.2 MILE NORTH OF CLEAR CREEK ROAD08/24/20221 (01/22/2020)Details CEM-3701 Report
214515Project ID: 214515
DEA: 024F6004
EFIS: 0213000012
02-SIS,TRI-36,96,299-VARBRIDGE DECK REPAIR, POLYESTER OVERLAY AND RAIL REPLACEMENT.SISKIYOU AND TRINITY COUNTIES AT VARIOUS LOCATIONS08/24/20221 (01/22/2020)Details CEM-3701 Report
214516Project ID: 214516
DEA: 024H2404
EFIS: 0218000098
02-TRI-3-32.0/38.0,53.7/63.8PLACE HMA (TYPE A) OVERLAY, SHOULDER BACKING, AND TRAFFIC STRIPE.TRINITY COUNTY NEAR WEAVERVILLE FROM 0.4 MILE NORTH OF BROWNS RANCH ROAD TO 0.1 MILE NORTH OF RUSH CREEK ROAD AND FROM EAST FORK STUART BRIDGE TO 2.4 MILES NORTH OF EL DORADO WAY02/18/20211 (01/22/2020)Details CEM-3701 Report
214517Project ID: 214517
DEA: 034F1004
EFIS: 0314000024
03-SAC-5,80,99-29.9,M9.2,R32.1INSTALL COLUMN CASINGS AND PLACE STRUCTURAL CONCRETE.SACRAMENTO COUNTY IN SACRAMENTO AT ROUTE 5 AND 99 AT S99-S5 CONNECTOR OVERCROSSING AND ON ROUTE 80 AT LONGVIEW DRIVE ON RAMP OVERCROSSING09/28/20211 (11/22/2019)Details CEM-3701 Report