Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 13461-13470 of 17277 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
214520 | Project ID: 214520 DEA: 051H9804 EFIS: 0517000043 | 05-SB-101-78.4/79.0 | ROADWAY EXCAVATION, PLACE AGGREGATE BASE, HMA AND RHMA-G. | SANTA BARBARA COUNTY NEAR SANTA MARIA FROM 0.3 MILE SOUTH TO 0.3 MILE NORTH OF SOLOMON SUMMIT UNDERCROSSING | 09/25/2020 | 1 (02/20/2020) | Details CEM-3701 Report |
214509 | Project ID: 214509 DEA: 060S4104 EFIS: 0614000140 MINOR: 06A2562 | 06--99-44.0/49.4 | Install shoulder rumble strip | Kern County from 0.4 mile south of Junction 46/99 Seperation to Sherwood Avenue Overcrossing | 11/29/2022 | 1 (01/31/2020) | Details CEM-3701 Report |
214510 | Project ID: 214510 DEA: 010C9704 EFIS: 0113000094 | 01-HUM-101-79.9/86.3 | ROADWAY EXCAVATION, PLACE HMA & HIGH TENSION CABLE BARRIER. | HUMBOLDT COUNTY IN AND NEAR EUREKA AND ARCATA AT VARIOUS LOCATIONS FROM EUREKA SLOUGH BRIDGE TO 11TH STREET OVERCROSSING | 03/24/2021 | 1 (11/13/2019) | Details CEM-3701 Report |
214511 | Project ID: 214511 DEA: 010E0004 EFIS: 0113000091 | 01-HUM-101-84.4/84.8 | BRIDGE RAIL REPLACEMENT. | HUMBOLDT COUNTY NEAR ARCATA FROM JACOBY CREEK BRIDGE TO GANNON SLOUGH BRIDGE | 11/22/2023 | 1 (11/13/2019) | Details CEM-3701 Report |
214512 | Project ID: 214512 DEA: 010F2204 EFIS: 0115000092 | 01-HUM-101-80.1/84.3 | ROADWAY EXCAVATION, PLACE HMA AND AB. | HUMBOLDT COUNTY NEAR EUREKA AT VARIOUS LOCATIONS FROM 0.3 MILE SOUTH OF COLE AVENUE TO 0.4 MILE NORTH OF BAYSIDE CUTOFF | 03/09/2022 | 1 (11/13/2019) | Details CEM-3701 Report |
214513 | Project ID: 214513 DEA: 021H3904 EFIS: 0216000041 | 02-SHA-5-R32.0/R32.3 | O'BRIEN DECK AND RAIL REHAB: WEATHER INFO SYSTEM, STRUCTURAL CONCRETE, HMA, REMOVE BRIDGE BARRIER. | SHASTA COUNTY ABOUT 10 MILES SOUTH OF LAKEHEAD FROM 0.1 MILE SOUTH TO 0.3 MILE NORTH OF O'BRIEN UNDERCROSSING | 09/28/2021 | 1 (01/22/2020) | Details CEM-3701 Report |
214514 | Project ID: 214514 DEA: 022H9704 EFIS: 0217000043 | 02-SHA-273-4.4,11.8/12.3 | INSTALL CMS, CCTV | SHASTA COUNTY AT VARIOUS LOCATIONS FROM BARNEY ROAD TO 0.2 MILE NORTH OF CLEAR CREEK ROAD | 08/24/2022 | 1 (01/22/2020) | Details CEM-3701 Report |
214515 | Project ID: 214515 DEA: 024F6004 EFIS: 0213000012 | 02-SIS,TRI-36,96,299-VAR | BRIDGE DECK REPAIR, POLYESTER OVERLAY AND RAIL REPLACEMENT. | SISKIYOU AND TRINITY COUNTIES AT VARIOUS LOCATIONS | 08/24/2022 | 1 (01/22/2020) | Details CEM-3701 Report |
214516 | Project ID: 214516 DEA: 024H2404 EFIS: 0218000098 | 02-TRI-3-32.0/38.0,53.7/63.8 | PLACE HMA (TYPE A) OVERLAY, SHOULDER BACKING, AND TRAFFIC STRIPE. | TRINITY COUNTY NEAR WEAVERVILLE FROM 0.4 MILE NORTH OF BROWNS RANCH ROAD TO 0.1 MILE NORTH OF RUSH CREEK ROAD AND FROM EAST FORK STUART BRIDGE TO 2.4 MILES NORTH OF EL DORADO WAY | 02/18/2021 | 1 (01/22/2020) | Details CEM-3701 Report |
214517 | Project ID: 214517 DEA: 034F1004 EFIS: 0314000024 | 03-SAC-5,80,99-29.9,M9.2,R32.1 | INSTALL COLUMN CASINGS AND PLACE STRUCTURAL CONCRETE. | SACRAMENTO COUNTY IN SACRAMENTO AT ROUTE 5 AND 99 AT S99-S5 CONNECTOR OVERCROSSING AND ON ROUTE 80 AT LONGVIEW DRIVE ON RAMP OVERCROSSING | 09/28/2021 | 1 (11/22/2019) | Details CEM-3701 Report |