Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 13381-13390 of 17447 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
214402 | Project ID: 214402 DEA: 010E7704 EFIS: 0115000009 | 01-HUM-101-R17.9/87.8 | STRENGTHEN 2 BRIDGES. | HUMBOLDT COUNTY AT SOUTH FORK EEL RIVER AND SEPARATION AND AT ARCATA OVERHEAD | 07/21/2023 | 1 (09/16/2019) | Details CEM-3701 Report |
214403 | Project ID: 214403 DEA: 010F6904 EFIS: 0116000045 | 01-HUM-299-14.7/15.7 | HMA -OPEN GRADED ( TYPE A ), WITH A CLASS 2 AGGREGATE BASE. | HUMBOLDT COUNTY NEAR BLUE LAKE FROM 2.2 MILES EAST OF SIMPSON RD TO 3.2 MILES EAST OF SIMPSON RD | 08/20/2020 | 1 (09/12/2019) | Details CEM-3701 Report |
214404 | Project ID: 214404 DEA: 040J6804 EFIS: 0414000025 | 04-MRN,SON-12,101,116-Var | PAVE GORES AND ROADSIDE AREAS, CONSTRUCT MAINTENANCE VEHICLE PULLOUTS. | MARIN AND SONOMA COUNTIES AT VARIOUS LOCATIONS | 04/02/2021 | 1 (10/07/2019) | Details CEM-3701 Report |
214405 | Project ID: 214405 DEA: 040K4704 EFIS: 0416000091 | 04-ALA-580-R35 | Bridge rehabilitation | 07/23/2020 | 1 (12/09/2019) | Details CEM-3701 Report | |
214406 | Project ID: 214406 DEA: 041J6004 EFIS: 0414000287 | 04-ALA-112,185- | Pedestrian Hybrid Beacons (X-Walk Safety Improvements) | Rte 112 in San Leandro from 61 to 185 | 11/09/2021 | 1 (02/13/2020) | Details CEM-3701 Report |
214407 | Project ID: 214407 DEA: 042G7304 EFIS: 0400021202 | 04-ALA,SCL-80,85,580-Varies | REPLACE HMA & MINOR CONCRETE, & MODIFY ELECTRICAL SYSTEM. | ALAMEDA AND SANTA CLARA COUNTIES AT VARIOUS LOCATIONS | 01/13/2023 | 1 (09/16/2019) | Details CEM-3701 Report |
214408 | Project ID: 214408 DEA: 043J1104 EFIS: 0415000088 | 04-ALA-13,24,61,80,84,etc.-Var | INSTALL ACCESSIBLE PEDESTRIAN SIGNALS, RESTRIPE CROSSWALKS. | ALAMEDA COUNTY AT VARIOUS LOCATIONS | 11/17/2021 | 1 (09/16/2019) | Details CEM-3701 Report |
214409 | Project ID: 214409 DEA: 043J3004 | 04-SF-1-6.3/6.6 | Remove and replace lights with LED, and upgrade lighting system. | MACARTHUR TUNNEL | 12/16/2021 | 1 (10/07/2019) | Details CEM-3701 Report |
214410 | Project ID: 214410 DEA: 07304004 EFIS: 0714000056 | 07-LA-60,605-11.0-12.0, 17.0-19.5 | IN LOS ANGELES COUNTY IN CITY OF INDUSTRY AND BALDWIN PARK ON ROUTE60 FROM 0.2MILE EAST OF PECK ROAD UNDERCROSSING TO WORKMAN MILL ROAD AND ON ROUTE605 FROM 0.5MILE NORTH OF PECK ROAD OVERCROSSING TO 0.8MILE SOUTH OF ROUTE10 In District 07 on Route60, 605 | 05/26/2022 | 1 (12/09/2019) | Details CEM-3701 Report | |
214411 | Project ID: 214411 DEA: 08384234 EFIS: 0815000168 | 08-SBD,RIV-10-29.4/39.2 | INSTALL FIBER OPTIC CABLE SYSTEM. | SAN BERNARDINO AND RIVERSIDE COUNTIES IN AND NEAR REDLANDS AND YUCAIPA FROM 0.1 MILE WEST OF ALABAMA STREET TO 0.2 MILE EAST OF COUNTY LINE ROAD | 11/01/2023 | 1 (03/30/2020) | Details CEM-3701 Report |