Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 13261-13270 of 17447 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
214289 | Project ID: 214289 EFIS: 0000001157 Permit Numbers: 0514NMC0478 0519NRT0383 0519NRT0001 0519NRD0572 | 05---6.9 | Reference Permit #0514-NMC-0478 on all correspondence. Note #0519-NRT-0383 is just a time extension for the original permit. Work Desc: Widen Blosser Road to provide a right turn lane for the northbound approach to West Main Street (State Route 166). | W. Main Street (Hwy 166), Santa Maria | 08/23/2021 | 1 (08/07/2019) | Details CEM-3701 Report |
214290 | Project ID: 214290 DEA: 010E8604 EFIS: 0115000038 | 01-MEN-20-16.8/17.2 | PLACE HOT MIX ASPHALT, CLASS 2 BASE AND ROADWAY EXCAVATION. | MENDOCINO COUNTY ABOUT 17 MILES EAST OF FORT BRAGG FROM 0.5 MILE WEST OF ROAD 200A TO 0.1 MILE WEST OF ROAD 200A | 06/27/2022 | 1 (08/06/2019) | Details CEM-3701 Report |
214291 | Project ID: 214291 DEA: 042J3204 EFIS: 0414000488 | 04-ALA-880-14.6 | Replace existing weigh-in-motion with PJCP WIM | 880 in Hayward | 01/13/2023 | 1 (09/16/2019) | Details CEM-3701 Report |
214292 | Project ID: 214292 DEA: 060Q9004 EFIS: 0614000047 | 06-FRE-180-92.2,130.1 | REPLACE BRIDGE RAILS. | FRESNO COUNTY NEAR SQUAW VALLEY AT MILL CREEK BRIDGE AND NEAR BOYDEN CAVE AT SOUTH FORK KINGS RIVER BRIDGE | 10/29/2020 | 1 (08/05/2019) | Details CEM-3701 Report |
214293 | Project ID: 214293 DEA: 060S4604 EFIS: 0615000038 | 06-FRE-99-R0.9/R5.0 | REPLACE CONCRETE AND ASPHALT PAVEMENT. | FRESNO COUNTY IN AND NEAR KINGSBURG AND SELMA FROM ROUTE 99/201 SEPARATION TO 0.3 MILE SOUTH OF SECOND STREET UNDERCROSSING | 05/11/2023 | 1 (08/05/2019) | Details CEM-3701 Report |
214294 | Project ID: 214294 DEA: 07301904 EFIS: 0714000030 | 07-LA-210-R33.1/R44.01 | FOR CONSTRUCTION ON STATE HIGHWAY IN LOS ANGELES COUNTY AT VARIOUS LOCATIONS FROM MONTEREY AVENUE UNDERCROSSING TO ROUTE 57/210 SEPARATION | 01/20/2022 | 1 (01/29/2020) | Details CEM-3701 Report | |
214295 | Project ID: 214295 DEA: 07304204 EFIS: 0714000055 | 07-LA-10-R2.1/R11.1 | PLACE TEXTURE PAVING AND VEGETATION CONTROL. | LOS ANGELES COUNTY IN SANTA MONICA AND LOS ANGELES FROM 0.1 MILE WEST OF ROUTE 1/10 SEPARATION TO 0.1 MILE EAST OF WEST BOULEVARD OVERCROSSING | 1 (12/18/2019) | Details CEM-3701 Report | |
214296 | Project ID: 214296 DEA: 07305104 EFIS: 0714000097 | 07-LA-405-42.9 | PLACE JPCP AND MODIFY ELECTRICAL SYSTEM. | LOS ANGELES COUNTY IN LOS ANGELES AT 0.1 MILE NORTH OF SATICOY STREET UNDERCROSSING | 08/05/2021 | 1 (02/19/2020) | Details CEM-3701 Report |
214297 | Project ID: 214297 DEA: 07311304 EFIS: 0715000009 | 07-VEN-33,101-0/0.1,27.5/31.0 | INSTALL SLOPE PAVING, BIO-SWALES AND PLANTING WITH IRRIGATION. | VENTURA COUNTY IN VENTURA ON ROUTE 101 FROM 0.8 MILE SOUTH OF SEAWARD AVENUE TO 0.4 MILE WEST OF ROUTE 33/101 SEPARATION, AND ON ROUTE 33 FROM ROUTE 33/101 SEPARATION TO 0.1 MILE NORTH OF ROUTE 33/101 SEPARATION. | 07/22/2024 | 1 (01/22/2020) | Details CEM-3701 Report |
214298 | Project ID: 214298 DEA: 07311504 EFIS: 0715000012 | 07-VEN-126-R10.2/R12.7 | FOR CONSTRUCTION ON STATE HIGHWAY IN VENTURA COUNTY IN SANTA PAULA FROM 0.2 MILES WEST OF PECK ROAD OVERCROSSING TO SANTA PAULA CREEK | 03/01/2024 | 1 (03/06/2020) | Details CEM-3701 Report |