Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 17291-17300 of 17703 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
209399Project ID: 209399
DEA: 101C2304
EFIS: 1014000091
10-MER-5,99-VarReplace Existing irrigation system with RICSIn Merced and SJ Counties07/28/20212 (09/23/2015)Details CEM-3701 Report
209458Project ID: 209458
DEA: 043G9804
EFIS: 0413000203
COOP: 042521
04-SCL-82-9.9/25.9make transit and other improvements along a 17.6-mile segment of the El Camino Real corridor in Santa Clara County extending from the Arena in San José to the Palo Alto Transit Center in Palo AltoRoute 82 El Camino Real Bus Rapid Transit (BRT 2 (08/22/2019)Details CEM-3701 Report
209514Project ID: 209514
DEA: 06484614
EFIS: 0614000064
COOP: 061576
06-KER-58-R52.3/R55.4Operational ImprovementsOn SR 58 from SR 99 separation to Cottonwood Road , and On SR 99 from Ming Ave to SR 58 in the City of Bakersfield08/17/20212 (09/23/2014)Details CEM-3701 Report
209513Project ID: 209513
DEA: 033E9804
EFIS: 0300000532
COOP: 030473
Permit Numbers: 0313AOP0738 0314NDP0033
03-ED-49-10.7/10.7Roadway widening including excavation, embankment, AB installation, CGS, drainage, and signalizationHW 49 at Pleaseant Valley Road, Diamond Springs02/06/20152 (04/04/2014)Details CEM-3701 Report
209518Project ID: 209518
DEA: 08497104
EFIS: 0800000789
Permit Numbers: 0813NMC0590 0814ARW0215 0814ADP0759 0814ART1126 0816ART0015
08-SBD-15-6.3/7.1Enter onto Interstate 15 (I-15) right-of-way at Baseline Road and East Ave in the City of Rancho Cucamonga, San Bernardino County, to perform interchange improvement, and street improvement, as per plans and specifications date stamped July 30, 2013 by Caltrans District 8 Encroachment Permits OfficI-15, Rancho Cucamonga12/29/20162 (04/01/2014)Details CEM-3701 Report
209558Project ID: 209558
DEA: 080H3804
EFIS: 0800000250
08-RIV-15-I-15/ Los Alamos Road Overcrossing Improvement Project 07/31/20182 (07/16/2013)Details CEM-3701 Report
209565Project ID: 209565
DEA: 060P6704
EFIS: 0612000201
COOP: 061589
06-TUL-245-7.1/7.24Construction of roundaboutAt the intersection of State Rte. 245 and 216 , in the City of Woodlake08/06/20152 (12/26/2014)Details CEM-3701 Report
209566Project ID: 209566
DEA: 07278604
EFIS: 0700021278
COOP: 074977
07-LA-210-19.3,21.0/21.4Sound wall construction on 210 Freeway, Phase 1 06/18/20152 (04/23/2014)Details CEM-3701 Report
209578Project ID: 209578
DEA: 042285G4
EFIS: 0400021065
COOP: 042519
04-CC-680-R4.2/R6.6Landscaping ImprovementArea of the I-680 Auxiliary Lanes (between Crow Canyon Rd in San Ramon and Sycamore Valley Rd in Danville) 2 (05/20/2014)Details CEM-3701 Report
209621Project ID: 209621
DEA: 041J0304
EFIS: 0414000129
COOP: 042520
04-CC-4-varAdd Mixed Flow Lanes and Operational ImprovementsFrom SR-4/SR-242 Interchange in Concord to SR-4/San Marcos Interchange in Pittsburg/Baypoint Area 2 (09/09/2019)Details CEM-3701 Report