Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 17291-17300 of 17703 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
209399 | Project ID: 209399 DEA: 101C2304 EFIS: 1014000091 | 10-MER-5,99-Var | Replace Existing irrigation system with RICS | In Merced and SJ Counties | 07/28/2021 | 2 (09/23/2015) | Details CEM-3701 Report |
209458 | Project ID: 209458 DEA: 043G9804 EFIS: 0413000203 COOP: 042521 | 04-SCL-82-9.9/25.9 | make transit and other improvements along a 17.6-mile segment of the El Camino Real corridor in Santa Clara County extending from the Arena in San José to the Palo Alto Transit Center in Palo Alto | Route 82 El Camino Real Bus Rapid Transit (BRT | 2 (08/22/2019) | Details CEM-3701 Report | |
209514 | Project ID: 209514 DEA: 06484614 EFIS: 0614000064 COOP: 061576 | 06-KER-58-R52.3/R55.4 | Operational Improvements | On SR 58 from SR 99 separation to Cottonwood Road , and On SR 99 from Ming Ave to SR 58 in the City of Bakersfield | 08/17/2021 | 2 (09/23/2014) | Details CEM-3701 Report |
209513 | Project ID: 209513 DEA: 033E9804 EFIS: 0300000532 COOP: 030473 Permit Numbers: 0313AOP0738 0314NDP0033 | 03-ED-49-10.7/10.7 | Roadway widening including excavation, embankment, AB installation, CGS, drainage, and signalization | HW 49 at Pleaseant Valley Road, Diamond Springs | 02/06/2015 | 2 (04/04/2014) | Details CEM-3701 Report |
209518 | Project ID: 209518 DEA: 08497104 EFIS: 0800000789 Permit Numbers: 0813NMC0590 0814ARW0215 0814ADP0759 0814ART1126 0816ART0015 | 08-SBD-15-6.3/7.1 | Enter onto Interstate 15 (I-15) right-of-way at Baseline Road and East Ave in the City of Rancho Cucamonga, San Bernardino County, to perform interchange improvement, and street improvement, as per plans and specifications date stamped July 30, 2013 by Caltrans District 8 Encroachment Permits Offic | I-15, Rancho Cucamonga | 12/29/2016 | 2 (04/01/2014) | Details CEM-3701 Report |
209558 | Project ID: 209558 DEA: 080H3804 EFIS: 0800000250 | 08-RIV-15- | I-15/ Los Alamos Road Overcrossing Improvement Project | 07/31/2018 | 2 (07/16/2013) | Details CEM-3701 Report | |
209565 | Project ID: 209565 DEA: 060P6704 EFIS: 0612000201 COOP: 061589 | 06-TUL-245-7.1/7.24 | Construction of roundabout | At the intersection of State Rte. 245 and 216 , in the City of Woodlake | 08/06/2015 | 2 (12/26/2014) | Details CEM-3701 Report |
209566 | Project ID: 209566 DEA: 07278604 EFIS: 0700021278 COOP: 074977 | 07-LA-210-19.3,21.0/21.4 | Sound wall construction on 210 Freeway, Phase 1 | 06/18/2015 | 2 (04/23/2014) | Details CEM-3701 Report | |
209578 | Project ID: 209578 DEA: 042285G4 EFIS: 0400021065 COOP: 042519 | 04-CC-680-R4.2/R6.6 | Landscaping Improvement | Area of the I-680 Auxiliary Lanes (between Crow Canyon Rd in San Ramon and Sycamore Valley Rd in Danville) | 2 (05/20/2014) | Details CEM-3701 Report | |
209621 | Project ID: 209621 DEA: 041J0304 EFIS: 0414000129 COOP: 042520 | 04-CC-4-var | Add Mixed Flow Lanes and Operational Improvements | From SR-4/SR-242 Interchange in Concord to SR-4/San Marcos Interchange in Pittsburg/Baypoint Area | 2 (09/09/2019) | Details CEM-3701 Report |