Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 17161-17170 of 17605 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
208873 | Project ID: 208873 DEA: 060C9404 EFIS: 0600000041 COOP: 061527 Permit Numbers: 0613NMC0448 | 06-KER-178-7/9.1 | Enter upon the State Highway Right-of-way on State Route 178 (SR-178) in Bakersfield at and near the SR-178/Morning Drive intersection (PM R7.0) to set up, maintain, and remove temporary traffic control necessary in order to construct the City of Bakersfi | SR 178, Bakersfield | 12/31/2015 | 2 (07/24/2013) | Details CEM-3701 Report |
208893 | Project ID: 208893 DEA: 07264804 EFIS: 0700000494 COOP: 4782&4782A1 Permit Numbers: 0713NMC0655 | 07-LA-110-2.5/3.0 | Replace existing interchange and intersections. | IN LOS ANGELES COUNTY, N/B I-110 ON /OFF-RAMPS AT C-STREET AND TWO ADJACENT INTERSECTIONS WITH A NEW N/B FLYOVER OFF-RAMP AND A NEW INTERSECTION | 11/02/2016 | 2 (05/23/2013) | Details CEM-3701 Report |
208911 | Project ID: 208911 DEA: 06493904 EFIS: 0600000495 COOP: 061541 | 06-KER-178,58,99- | Widening 23rd and 24th Street on Rte 178 | From State Route 99 to East of M Street and intersection improvement at Oak Street in the City of Bakersfield | 08/17/2021 | 2 (07/24/2013) | Details CEM-3701 Report |
208913 | Project ID: 208913 DEA: 060J3204 EFIS: 0600000169 COOP: 061505 Permit Numbers: 0612NMC0061 0613NDP0456 | 06-MAD--11/11 | Enter upon the State Highway Right-of-way on State Route 99 (SR-99) in Madera at the SR-99/4th Street Overcrossing Bridge (PM 11.0) to set up, maintain, and remove temporary traffic control necessary in order to construct the City of Madera's SR-99/4th St | 205 W. Fourth St., Madera | 08/27/2018 | 2 (10/07/2013) | Details CEM-3701 Report |
208917 | Project ID: 208917 DEA: 100P7304 EFIS: 1000000194 COOP: 10417 | 10-SJ-99-4.5/5.0 | Interchange Modification | 08/12/2021 | 2 (08/07/2014) | Details CEM-3701 Report | |
208933 | Project ID: 208933 DEA: 042G5104 EFIS: 0412000203 COOP: 042495 | 04-CC-4,160- | Constructor a freeway to freeway connector in each direction | Between State Route (SR) 4 and the SR 160 in Antioch | 05/07/2019 | 2 (08/21/2013) | Details CEM-3701 Report |
208936 | Project ID: 208936 DEA: 043G9604 EFIS: 0413000034 COOP: 042606 | 04-ALA-880,77,112,185,880- | Install Integrated Corridor Management (ICM) system to manage traffic on arterials during incidents, including closed circuit television cameras, arterial dynamic message signs (ADMS), trailblazer signs (TBS), static signs, communications infrastructure, TM | Oakland Transportation Management Center (TMC), the City of San Leandro TMC, and the Caltrans District 4 TMC, and vehicle detection devices in the northbound and southbound directions of Interstate 880 and on State Routes 61, 77, 112 and 185 | 02/01/2022 | 2 (09/17/2015) | Details CEM-3701 Report |
208943 | Project ID: 208943 DEA: 100W6804 EFIS: 1012000026 COOP: 10393 | 10-MER-165-14.9/22.3 | Construct left and right turn deceleration lanes at three intersections | State Hwy 165 in Merced County | 07/12/2019 | 2 (12/09/2013) | Details CEM-3701 Report |
208946 | Project ID: 208946 DEA: 040A0814 EFIS: 0413000365 COOP: 042502 Permit Numbers: 0415NMC0806 | 04-CC--3.8/5.3 | Reconstruct El Portal Drive WB on-ramp, (b) extending auxiliary lanes along I-80 WB between new El Portal Dr. WB on-ramp to San Pablo Dam Rd. WB off-ramp, (c) realigning El Portal, (d) sliver widening on EB 80 mainline and (e) reconstruct median barrier | San Pablo Dam Road | 07/12/2019 | 2 (12/18/2015) | Details CEM-3701 Report |
208968 | Project ID: 208968 DEA: 100T3504 EFIS: 1000000745 COOP: 10333A1 | 10-CAL-49-15.0/18.6 | Construct bike lane and sidewalks | City of Angels on Rte 49 | 07/12/2019 | 2 (07/18/2013) | Details CEM-3701 Report |