Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 16931-16940 of 17447 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
7606 | Project ID: 7606 DEA: 08448114 EFIS: 0800020451 | 08-SBD-10-25.3/26.3 | I-10/Tippecanoe Interchange Improvements-Phase 1. | In the cities of Loma Linda and San Bernardino, from 1 mile west of Tippecanoe Avenue to Tippecanoe Avenue. Construct eastbound auxiliary lane, eastbound off ramp, retaining walls, reinforced concrete box culvert, and widen San Timoteo Bridge. | 08/25/2021 | 2 (02/14/2013) | Details CEM-3701 Report |
7614 | Project ID: 7614 EFIS: 0000001155 Permit Numbers: 0412NRD1251 | 04-MRN-1-0.65-0.9 | 01/21/2019 | NOT VERIFIED | Details CEM-3701 Report | ||
7621 | Project ID: 7621 DEA: 02347604 EFIS: 0200000251 | 02-SHA-5-R4.2/R4.6 | Interchange reconstruction, including construction of a new off ramp, roundabout intersection, and widening of Deschutes Road/Factory Outlets Drive. | FOR CONSTRUCTION ON STATE HIGHWAY IN SHASTA COUNTY IN AND NEAR ANDERSON FROM 0.3 MILES SOUTH TO 0.1 MILES NORTH OF DESCHUTES ROAD UNDERCROSSING | 03/26/2021 | 2 (06/01/2012) | Details CEM-3701 Report |
7622 | Project ID: 7622 EFIS: 0000001155 Permit Numbers: 12126SN0201 | 12-ORA-405-16.5/16.5 | move and replace two existing luminaries (#3908 & #3909) along the NB I-405 and Beach Blvd. (SR-39) loop off-ramp with two luminaries at new locations as shown on the attached Permit Plan stamp-dated April 11, 2012. The new luminaries will consist of | i-405, Huntington beach | 09/08/2016 | NOT VERIFIED | Details CEM-3701 Report |
7624 | Project ID: 7624 DEA: 09343904 EFIS: 0912000014 MINOR: 09A0522 | 09-INY-168-R19.4/54.4 | Furnish and Install Roadside Signs | 1.2 mile east of Rte 395 , near Big Pine | 2 (06/24/2021) | Details CEM-3701 Report | |
7626 | Project ID: 7626 DEA: 051A8504 EFIS: 0512000032 | 05-SB-1,101,154-var | Install flashing beacons | 08/27/2019 | NOT VERIFIED | Details CEM-3701 Report | |
7628 | Project ID: 7628 DEA: 120K5604 EFIS: 1200000357 Permit Numbers: 1212NMC0130 12126DP0172 12126DP0172 | 12-ORA-90-7.27 | Perform street improvements on Imperial Highway (SR-90) and Valencia Avenue (SR-142) in the city of Brea. Work will include pavement construction, traffic signal installation, signing & striping and median landscape improvements | Imperial Hwy, Brea | 09/09/2016 | NOT VERIFIED | Details CEM-3701 Report |
7633 | Project ID: 7633 DEA: 120C5104 EFIS: 1200000076 Permit Numbers: 1211NDP0360 1210NMC0465 | 12-ORA-5-35.9/36 | construct the extension of Gene Autry Way (West Phase 2 portion) from the existing abutment of the right bridge at the I-5 HOV Interchange to approximately 750 feet westerly right of way of Manchester Avenue in Anaheim. Work will consist of the constructi | gene autry way, Anaheim | 07/01/2014 | NOT VERIFIED | Details CEM-3701 Report |
7635 | Project ID: 7635 DEA: 080N6604 EFIS: 0800020403 MINOR: 08A2086 | 08-SBD-210-13.42/14.14 | MODIFY SIGNAL AND LIGHTING (INSTALL VIDEO DETECTION SYSTEM), MODIFY STRIPING AND SIGNS AT STATE ROUTE 210 AND CITRUS AVENUE EASTBOUND OFF-RAMP. | 2 (06/24/2021) | Details CEM-3701 Report | ||
7636 | Project ID: 7636 DEA: 060M1604 EFIS: 0600000948 MINOR: 06A1784 | 06-KER-- | Cold Plane Ramp and Reconstruct with Hot Mix Asphalt (Type A) and Jointed Plain Concrete Pavement | In Kern County near Wheeler Ridge at Northbound Off Ramp to Wheeler Ridge Road | 10/16/2020 | 2 (12/05/2014) | Details CEM-3701 Report |