Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 16621-16630 of 17829 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
4779 | Project ID: 4779 EFIS: 0000001155 Permit Numbers: 08096MC0339 | 08-RIV-60-14.425 | Existing Block Wall built along State & prime; existing Chain link Fence. The wall is located within private property. | 23090 Sunnymead Blvd. | 12/04/2009 | 2 (12/04/2009) | Details CEM-3701 Report |
4780 | Project ID: 4780 EFIS: 0000001155 Permit Numbers: 08096MC0441 | 08-RIV-74-29.8/29.8 | Enter onto SR 74 Right of Way at Menifee road to set up temporary traffic controls to perform street improvements within County of Riverside right of way, and to install traffic signal interconnect between the new county traffic signal at Menifee Road and | 28664 Matthews Rd (SR 74), Perris Valley | 12/09/2009 | 2 (12/09/2009) | Details CEM-3701 Report |
4781 | Project ID: 4781 EFIS: 0000001155 Permit Numbers: 08096SN0208 | 08-SBD-210-16/16 | Entering State Right of Way at SR-210 and Casmelia Avenue to do street improvement, utilities, traffic signal, and all appurtenances, grading on Casmelia Avenue, Alder Street and a portion of vacated Casmelia, as per plans date stamped April 22, 2010 by t | Casmelia Avenue, Rialto | 06/08/2012 | NOT VERIFIED | Details CEM-3701 Report |
4784 | Project ID: 4784 EFIS: 0000001155 Permit Numbers: 0809NDP0851 | 08-SBD-259-0/1.49 | Enter Interstate 215 right of way between Mills Street and Massachusetts Avenue and State Route 259 right of way between Highland Avenue and I-215 to construct Operational improvements including one High Occupancy Lane and one Mixed Flow Lane in each dire | I-215 segment 1 & 2, San Bernardino | 11/05/2009 | 2 (11/05/2009) | Details CEM-3701 Report |
4785 | Project ID: 4785 Permit Numbers: 0809NDP1006 0809NMC0034 | 08-RIV--19.8/20.6 | Enter onto Interstate 215 right-of-way at Clinton Keith Road, in the City of Murrieta, to reconstruct the interchange which includes a new bridge, signal, drainage and appurtenant work as per Parent Permit 08-09-N-MC-0034 issued by the Department of Trans | Interstate 215, Murrieta | 07/31/2018 | NOT VERIFIED | Details CEM-3701 Report |
4786 | Project ID: 4786 EFIS: 0000001155 Permit Numbers: 0809NMC0015 0809NRW0478 | 08-SBd-83-2.017/2.636 | TRAFFIC SIGNAL MODIFICATION | 05/25/2011 | NOT VERIFIED | Details CEM-3701 Report | |
4788 | Project ID: 4788 Permit Numbers: 0809NMC0022 0809NRW0844 0809NRW0436 0809NRT0456 0809NRW0828 | 08-SBD-395-R12.31/12.634 | CONSTRUCT STREET IMPROVEMENT AND TRAFFIC SIGNAL MODIFICATION EA# 08-0L0304 | EA# 08-0L0304 | 08/01/2011 | NOT VERIFIED | Details CEM-3701 Report |
4789 | Project ID: 4789 DEA: 08467704 EFIS: 0000001155 Permit Numbers: 0809NMC0033 0809NDP0103 | 08-SBD-10-15.73/15.73 | Enter onto Interstate 10 (I-10) right-of-way at Cypress Avenue from Slover Avenue to Valley Boulevard to construct a new over-crossing as per plans and Notice to Contractors Inviting Bids date stamped January 14, 2009 by District 8 Encroachment Permits Of | Cypress Avenue, Fontana | 03/25/2011 | 2 (06/17/2009) | Details CEM-3701 Report |
4791 | Project ID: 4791 EFIS: 0000001155 Permit Numbers: 0809NMC0225 | 08-RIV-79-7.6/8 | Enter onto State Route 79 (Winchester Road) right-of-way at Clinton Keith Road/Benton Road, in the City of Murrieta, to widen the southbound State highway and to add the fourth leg of the street intersection (Clinton Keith Road) which include but not limit | State Route 79 (Winchester Road), Murrieta | 08/30/2012 | 2 (08/30/2012) | Details CEM-3701 Report |
4792 | Project ID: 4792 EFIS: 0000001155 Permit Numbers: 0809NMC0458 | 08-SBD-62,247-VAR | Median island Improvements IN City of Yucca Valley | 03/17/2011 | 2 (03/17/2011) | Details CEM-3701 Report |