Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 16091-16100 of 16311 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
211567Project ID: 211567
DEA: 030C9314
EFIS: 0315000138
COOP: 0607,1520
03-PLA-28-9.2/10.3Kings Beach Commerical Core Improvement - Gateway to the Core- Construct sidewalks, Class II bike lanes, roundabouts, public transit facilities, vehicular parking facilities, bicycle locking facilities, trash receptacles, benches, and street lampsIn Kings Beach on SR 28 in the vicinity of SR 267 and Chipmunk Avenue.10/01/20212 (07/13/2016)Details Personnel CEM-3701 Report
211647Project ID: 211647
DEA: 11415604
EFIS: 1113000007
11-SD-8-46.2PPNO 1077 [W8 USBP Checkpoint Buckman Springs - Canopy ] -installation of inspection booths, cameras, concrete barriers with end treatments, and signing and striping is to be upgraded to current standardin San Diego County08/17/20212 (07/29/2021)Details Personnel CEM-3701 Report
211683Project ID: 211683
Permit Numbers: 1214NRM0700
12--133-0.898Driveway entrance and sidewalk improvements at Laguna Canyon Rd. & Milligan Dr. in support of a bridge replacement over the Laguna Canyon Channel. All performed work shall be in accordance with current Caltrans Standard Specs and Plans 2010.Route 133 NB on right hand side, Milligan Dr. bridge replacement at PM 0.898.09/08/20162 (08/23/2016)Details Personnel CEM-3701 Report
211699Project ID: 211699
DEA: 05000004
05-SLO-101-Upgrade Signals - Five Cities Drive Traffic Signals at 101 SB Off-Ramp TRAFFIC SIGNAL AND. LIGHTING WORKPismo Beach. FIVE CITIES DRIVE AT SB 101 OFFRAMP IN PISMO BEACH, CA09/06/2019NOT VERIFIEDDetails Personnel CEM-3701 Report
211720Project ID: 211720
Permit Numbers: 0616AOP0442
06--41-2.9/3.4  09/24/20182 (09/14/2016)Details Personnel CEM-3701 Report
213017Project ID: 213017
DEA: 041K9904
EFIS: 0416000339
COOP: TBD
04-SF-101,92,84-(Alternative Delivery)CALTRAIN PENINSULA CORRIDOR ELECTRIFICATION PROJECT, a Design Build Project. Install bridge screening and OCS attachments on approximately 40 Caltrans structures that cross the rail line in the San Francisco peninsula.San Francisco peninsula at various structures along rail line, to include 101, 280, 380, 92, 85, 237, and 880. 2 (02/06/2018)Details Personnel CEM-3701 Report
211830Project ID: 211830
DEA: 081G3804
EFIS: 0815000227
COOP: 081613
08-SBD-215-0.4Install Traffic Signal 08/19/20212 (10/12/2016)Details Personnel CEM-3701 Report
211891Project ID: 211891
DEA: 042J6804
EFIS: 0414000552
COOP: 042633
04-CC-580-4.98/7.79, 0.0/3.29  07/12/20192 (11/07/2016)Details Personnel CEM-3701 Report
211899Project ID: 211899
MINOR: 01A1635
01-DN-101-Install High Canopy for Crescent City Highway Maintenance StationIn Del Norte County01/11/20212 (10/03/2017)Details Personnel CEM-3701 Report
211907Project ID: 211907
DEA: 060F3604
EFIS: 0600000076
COOP: 061583
Permit Numbers: 0614AOP0912 0615ADP0141 0616AOP1000 0616ADP1001 0617ART0088
06-KER-58-50.6/51.7Enter upon the State Highway Right-of-way on State Route 58 (SR 58) from Mohawk Street (PM 50.6) to State Route 99 (PM 51.7) in the City of Bakersfield, Kern County, to set up, maintain, and remove temporary traffic control necessary to construct, portion within State Right-of-way, the City?s RosedRosedale Hwy, Bakersfield04/27/20182 (04/14/2014)Details Personnel CEM-3701 Report