Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 15931-15940 of 17622 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
3350 | Project ID: 3350 DEA: 060L8604 MINOR: 06A1537 | 06-FRE-99-6.8 | RESTRIPE INTERSECTION AND MODIFY SIGNAL | 04/27/2011 | NOT VERIFIED | Details CEM-3701 Report | |
3351 | Project ID: 3351 DEA: 060L8704 MINOR: 06A1551 | 06-KER-58-75.2 | CONSTRUCT SHOULDER CONCRETE GUARD RAIL BARRIER | 04/27/2011 | NOT VERIFIED | Details CEM-3701 Report | |
3352 | Project ID: 3352 DEA: 060L8804 EFIS: 0600000341 MINOR: 06A1584 | 06-KER-43-23.6 | Install Pipe | In Wasco at Filburn Ave. | 07/28/2020 | 2 (12/19/2014) | Details CEM-3701 Report |
3353 | Project ID: 3353 DEA: 060L9204 EFIS: 0600000937 MINOR: 06A1568 | 06-TUL-190-11.2/11.6 | Install Flashing Beacons | In Tulare County Near Porterville at the Intersection of Route 190 and Road 208 | 07/28/2020 | 2 (12/19/2014) | Details CEM-3701 Report |
3358 | Project ID: 3358 DEA: 060M3504 EFIS: 0600000957 MINOR: 06A1692 | 06-KIN-43-7.9/17.4 | Remove and Replace Fence | IN KINGS COUNTY NEAR HANFORD FROM CROSS CREEK TO HANFORD-ARMONA ROAD | 07/28/2020 | 2 (12/05/2014) | Details CEM-3701 Report |
3371 | Project ID: 3371 DEA: 060M8404 EFIS: 0600020104 MINOR: 06A1669 | 06-TUL-190-4.44 | Install Flashing Beacon | 07/28/2020 | 2 (12/05/2014) | Details CEM-3701 Report | |
3376 | Project ID: 3376 Permit Numbers: 06106DP0087 | 06-FRE-33-61.18 | Reconstruct Bass Avenue intersection at FRE/33/62.506 with new left turn lane in SB FRE/33, new right turn lane in NB FRE/33 and new signal system. Construct a new public road approach at FRE/33/62.705 (Lozano Street). | SR33 | 04/27/2018 | 2 (12/05/2014) | Details CEM-3701 Report |
3377 | Project ID: 3377 EFIS: 0000001155 Permit Numbers: 06106DP0475 | 06-FRE-33-16.34/16.34 | enter and set up traffic control at the intersection of State Route 33 and Cherry Lane in the City of Coalinga, to realign and signalize the intersection. Sidewalk, curb, gutter, valley gutter and pavement will be removed and reconstructed per attached pl | Cherry Lane, Coalinga | 06/11/2018 | 2 (12/05/2014) | Details CEM-3701 Report |
3378 | Project ID: 3378 EFIS: 0000001155 Permit Numbers: 06106SN0353 | 06-KER-178-9/9 | Enter upon the State Highway Right-of-way on State Route 178 (SR-178) in Kern County at and near the SR-178/Bedford Green Drive (Canteria Drive) Intersection (Post Mile T9.0) to set up, maintain, and remove temporary traffic control necessary to modify the | Bedford Green Drive (Canteria), Bakersfield | 06/11/2018 | 2 (12/05/2014) | Details CEM-3701 Report |
3379 | Project ID: 3379 EFIS: 0000001155 Permit Numbers: 0610NDP0541 | 06-TUL-63-5.8/8 | Enter upon the State Highway Right-of-way on State Route 63 (SR-63) in Visalia between Post Mile 5.8 and 8.0 to set up, maintain, and remove temporary traffic control necessary to construct the Citys Whitendale Avenue Street Widening Project (Contract No. | Whitendal Avenue at Mooney Blvd., Visalia | 06/11/2018 | 2 (12/05/2014) | Details CEM-3701 Report |