Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 15541-15550 of 17201 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
3384Project ID: 3384
EFIS: 0000001155
Permit Numbers: 0610NSN0234
06-FRE-41-23.07/23.07Enter upon the State Highway Right-of-way on State Route 41 (SR-41) in Fresno County in Fresno at Post Mile 23.07 to set up, maintain, and remove temporary traffic control necessary to construct the City's SR 41 SB Off-Ramp Interchange Reconstruction Projectoff ramp from sb SR41, Fresno07/30/20182 (12/05/2014)Details CEM-3701 Report
3385Project ID: 3385
EFIS: 0000001155
Permit Numbers: 0610NUT0022
06-TUL-190-10.91/10.91The Project consists of the construction of two parallel reinforced concrete box culverts across State Route 190 that will have a combined design flow of 150 CFS. The contractor will USA construction area and pothole all existing utilities, provide trafficSR180, Porterville07/30/20182 (12/05/2014)Details CEM-3701 Report
3386Project ID: 3386
EFIS: 0000001155
Permit Numbers: 06116DP0248
06-TUL-201-7.95/7.95Enter upon the State Highway Right-of-way on State Route 201 (SR-201) in Tulare County at and near the SR-201 (Ave 400)/Road 80 Intersection (Post Mile 7.95) to set up, maintain, and remove temporary traffic control necessary in order to widen the roadwayN/A, N/A07/30/20182 (12/29/2014)Details CEM-3701 Report
3388Project ID: 3388
EFIS: 0000001155
Permit Numbers: 0611NDP0486
06-KER-178-9/9Enter upon the State Highway Right-of-way on State Route 178 (SR-178) in Kern County at and near the SR-178/Bedford Green Drive (Canteria Drive) Intersection (Post Mile T9.0) to set up, maintain, and remove temporary traffic control necessary to modBedford Green Drive (Canteria), Bakersfield07/30/20182 (12/05/2014)Details CEM-3701 Report
3389Project ID: 3389
EFIS: 0000001155
Permit Numbers: 0611NDP0645
06-MAD-99-13.15/13.15Enter upon the State Highway Right-of-way on State Route 99 (SR-99) in Madera at and near Post Mile 13.15 to set up, maintain, and remove temporary traffic control necessary in order to construct the new bridge for the Ellis Street/Avenue 16 OvercrossingSR99, Madera07/30/20182 (12/05/2014)Details CEM-3701 Report
3390Project ID: 3390
EFIS: 0000001155
Permit Numbers: 0611NMC0518 06126DP0017
06-TUL-198-4.2/5Enter upon the State Highway Right-of-way on State Route 198 (SR-198) in Visalia at and near Post Mile R4.8 to set up, maintain, and remove temporary traffic control necessary in order to modify and widen the existing Plaza Drive Bridge No. 46-237/SR-198Plaza Drive, Visalia07/30/20182 (12/29/2014)Details CEM-3701 Report
3391Project ID: 3391
EFIS: 0000001155
Permit Numbers: 0611NRW0748
06-TUL-198-4.2/5Enter upon the State Highway Right-of-way on State Route 198 (SR-198) in Visalia at and near Post Mile R4.8 to set up, maintain, and remove temporary traffic control necessary in order to modify and widen the existing Plaza Drive Bridge No. 46-237/SR-198Plaza Drive, Visalia07/30/20182 (12/05/2014)Details CEM-3701 Report
3392Project ID: 3392
DEA: 06293304
06-MAD-99-19.6/22.6CONVERT TO DIVIDED FWYIN MADERA CTY NR FAIRMEAD AVE12/30/2009NOT VERIFIEDDetails CEM-3701 Report
3399Project ID: 3399
DEA: 06342334
EFIS: 0600000374
COOP: 061012
Permit Numbers: 0607NDP0260 0607NMC0960
06-FRE-180-R86/R90RTE 180 WEST -SEGMENT 2 05/24/2011NOT VERIFIEDDetails CEM-3701 Report
3415Project ID: 3415
DEA: 06395204
Permit Numbers: 0607NSN0359
06-KER-178-R9.4/R12.1SR 178 and Fairfax Road Interchange Project 05/24/2011NOT VERIFIEDDetails CEM-3701 Report