Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 14831-14840 of 14911 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
213917Project ID: 213917
DEA: 030E9604
EFIS: 0300000061
COOP: 030525
03-ED-49-11.78/12.4Realignment / widening SR 49, includes HMA paving, concrete curb, gutter, and sidewalk, signing and striping, permanent and temporary fence removal and construction, drainage improvements, signal and lighting modifications, retaining wall, and utilitiesLocal Agency: El Dorado County. El Dorado County along Highway 49 in the community of Diamond Springs, approximately 3 miles south of the City of Placerville02/03/20212 (02/04/2019)Details
Personnel
213918Project ID: 213918
DEA: 063HT014
EFIS: 0615000116
06---(Alternative Delivery)  2 (02/04/2019)Details
Personnel
213919Project ID: 213919
DEA: 100P2004
EFIS: 1000000182
COOP: 100487
Permit Numbers: 1019NMC0209
10-SJ-120-R3.4 to PM R5.2SR 120 / Union Road Interchange. Construction of 4 new bridges and widening 47 feet of the overcrossing, reconstruction of all the ramps, auxiliary lanes on both sides of SR 120, Overhead sign and new traffic signals and lighting.SR 120 from Airport Way to Union Road and from Union Road to Main Street08/04/20212 (07/31/2019)Details
Personnel
213956Project ID: 213956
DEA: 03425504
EFIS: 0300000617
COOP: 030635
03-SAC-5-31.1/31.9Piles, CIP P/S Concrete Box Girder, Overhead sign structures; est const start: June 2019, Est comp: July 2020.Local Agency: County of Sacramento; On Interstate 5, from Route 5/70 /99 Separation to Powerline Road Overcrossing.07/30/20212 (02/20/2019)Details
Personnel
213959Project ID: 213959
DEA: 100T9104
EFIS: 1000000306
COOP: 10345,10446
10-STA-99-R4.1/F4.9Roadway reconstruction, including roadway and ramp widening and new traffic signals. The work also include retaining walls, ground anchor walls, detention basins, HMA paving, storm drain, and drainage basins. First day: 4/29/19, Completion: 6/2/20State Highway 99 in Stanislaus County In the City of Turlock from 0.4 mile south to 0.4 mile north of Fulkerth Road Undercrossing.07/23/20212 (02/21/2019)Details
Personnel
213986Project ID: 213986
Permit Numbers: 04166UT0590 04176RT1690
04---6.9/6.9Underground joint trench with power poles at intersection of highway 152 (Hecker Pass Road)and Autumn Road.2370 Hecker pass, Gilroy11/30/00-12 (08/19/2019)Details
Personnel
213988Project ID: 213988
DEA: 081E7104
EFIS: 0814000079
08--10-31.62/31.92I-10 University Street Improvement ProjectPost Mile 31.62/31.92 on Interstate 10 in teh City if Redlands,Ca 2 (03/08/2019)Details
Personnel
214038Project ID: 214038
DEA: 07315404
EFIS: 0715000185
Permit Numbers: 0718AOP2643 0719ART0238 0719ART1716
07---3.4/3.8Roadway widening of northbound (NB) State Route 213 from 200' south of Avenida Aprenda to 500' north of Green Hills Drive (PM 3.4/3.8). Widening will accommodate the addition of one NB through lane and shoulder, two new bus turnouts, two new driveway approaches to the new development, and moWestern Avenue (SR-213), Los Angeles/Rancho Palos Verdes06/17/20212 (03/28/2019)Details
Personnel
214019Project ID: 214019
DEA: 07309203
EFIS: 0714000267
Permit Numbers: 0716AMC1295 0718ART2606
07-LA-605-23.3I-605 Ramp Widening & Live Oak Avenue IntersectionThe reconstruction of the I-605 Northbound off-ramp at Live Oak Avenue will improve both directions of acce ss to Live Oak Avenue. The direct ramp to eastbound Live Oak Avenue will be widened to provide dual right lanes at Live Oak Avenue,06/17/20212 (03/05/2019)Details
Personnel
214101Project ID: 214101
Permit Numbers: 0417NMC1910
04-SM-82-9.35-10.07The Peninsula Corridor Joint Powers Board (JPB), which operates the San Francisco Bay Area's Caltrain passenger rail intends to extend 28th Avenue and 31st Avenue west of El Camino Real (SR 82) in the same location as existing driveway access points... 08/13/20212 (08/28/2019)Details
Personnel