Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
995356 | Project ID: 995356 DEA: 043Y4204 EFIS: 0423000235 | 04-SON/SON-128-0/2 | Traffic control system, tree removal, and replace roadside signs | 03/11/2024 | NOT VERIFIED | Details CEM-3701 Report | |
995357 | Project ID: 995357 DEA: 051Q9104 EFIS: 0523000097 | 05-SB-1-16/16 | Construct RSP revetment and rockery to restore slope, shoulder and lane structural section, reconstruct barrier and alternative crash cushion, reset MGS, replace failed culvert and install inlet | 10/28/2024 | 1 (11/16/2023) | Details CEM-3701 Report | |
995358 | Project ID: 995358 DEA: 043Y1304 EFIS: 0423000200 | 04-ALA-580-43.15/43.15 | Perform the application of Polyurethane Foam injection in lane #3, #4 and outside shoulder, clean drainage system and investigate for damage/blockage, install Slope Inclinometer to monitor slope movement, install RSP at the outfall | 1 (01/08/2024) | Details CEM-3701 Report | ||
995359 | Project ID: 995359 DEA: 043Y4304 EFIS: 0423000236 | 04-NAP/NAP-29-39.5/42 | Traffic control system, tree removal, replace roadside signs | NOT VERIFIED | Details CEM-3701 Report | ||
995360 | Project ID: 995360 DEA: 051Q9304 EFIS: 0523000103 | 05-SCR/SCR-9-17/19 | Clear downed or hazardous trees, remove brush, and stabilize slopes | 10/28/2024 | 1 (10/10/2024) | Details CEM-3701 Report | |
995361 | Project ID: 995361 DEA: 072XF604 EFIS: 0723000126 | 07-VEN-33-24.25/27.3 | Rebuild the eroded side slopes, rebuild the damaged shoulders, reconstruct the dike, repair the sinkhole on the shoulder, repair the eroded areas next to EP, behind guardrail, and around the flumes, reinstall guardrail, rebuild RSP, clean the drainage systems, construct a SPW | 1 (11/27/2023) | Details CEM-3701 Report | ||
995362 | Project ID: 995362 DEA: 043Y1604 EFIS: 0423000203 | 04-SON-128-15.98/16.55 | Repair slope embankment damage to roadway due to slide, restore drainage function, and install rock slope protection, soldier pile, and rock stabilization (DTWM - Anchored) to stabilize adjacent slope. Construct 120 foot long segmented soldier pile wall with pile cap. Max height of the wall is 7 fee | 1 (04/12/2024) | Details CEM-3701 Report | ||
995363 | Project ID: 995363 DEA: 11431834 EFIS: 1123000171 | 11-SD-52-8.300000000000001/8.300000000000001 | Provide traffic control, clean, inspect, and prepare culverts, CIPP line culverts, import borrow and repair embankment, install rock slope protection, install 24\" RCP, invert pave existing culverts, landscape embankment, install erosion | 1 (06/11/2024) | Details CEM-3701 Report | ||
995364 | Project ID: 995364 DEA: 051Q9404 EFIS: 0523000104 | 05-SCR-1-33/33 | Restore slope | 1 (11/16/2023) | Details CEM-3701 Report | ||
995365 | Project ID: 995365 DEA: 034J5804 EFIS: 0323000209 | 03-YOL--2.2/2.7 | Site preparation, reset guardrail, debris removal, backfill, HMA Dike, concrete vegetation control, erosion control, traffic control, and incidental work | 1 (11/13/2023) | Details CEM-3701 Report |