Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 14401-14410 of 17755 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
995356Project ID: 995356
DEA: 043Y4204
EFIS: 0423000235
04-SON/SON-128-0/2Traffic control system, tree removal, and replace roadside signs 03/11/2024NOT VERIFIEDDetails CEM-3701 Report
995357Project ID: 995357
DEA: 051Q9104
EFIS: 0523000097
05-SB-1-16/16Construct RSP revetment and rockery to restore slope, shoulder and lane structural section, reconstruct barrier and alternative crash cushion, reset MGS, replace failed culvert and install inlet 10/28/20241 (11/16/2023)Details CEM-3701 Report
995358Project ID: 995358
DEA: 043Y1304
EFIS: 0423000200
04-ALA-580-43.15/43.15Perform the application of Polyurethane Foam injection in lane #3, #4 and outside shoulder, clean drainage system and investigate for damage/blockage, install Slope Inclinometer to monitor slope movement, install RSP at the outfall  1 (01/08/2024)Details CEM-3701 Report
995359Project ID: 995359
DEA: 043Y4304
EFIS: 0423000236
04-NAP/NAP-29-39.5/42Traffic control system, tree removal, replace roadside signs  NOT VERIFIEDDetails CEM-3701 Report
995360Project ID: 995360
DEA: 051Q9304
EFIS: 0523000103
05-SCR/SCR-9-17/19Clear downed or hazardous trees, remove brush, and stabilize slopes 10/28/20241 (10/10/2024)Details CEM-3701 Report
995361Project ID: 995361
DEA: 072XF604
EFIS: 0723000126
07-VEN-33-24.25/27.3Rebuild the eroded side slopes, rebuild the damaged shoulders, reconstruct the dike, repair the sinkhole on the shoulder, repair the eroded areas next to EP, behind guardrail, and around the flumes, reinstall guardrail, rebuild RSP, clean the drainage systems, construct a SPW  1 (11/27/2023)Details CEM-3701 Report
995362Project ID: 995362
DEA: 043Y1604
EFIS: 0423000203
04-SON-128-15.98/16.55Repair slope embankment damage to roadway due to slide, restore drainage function, and install rock slope protection, soldier pile, and rock stabilization (DTWM - Anchored) to stabilize adjacent slope. Construct 120 foot long segmented soldier pile wall with pile cap. Max height of the wall is 7 fee  1 (04/12/2024)Details CEM-3701 Report
995363Project ID: 995363
DEA: 11431834
EFIS: 1123000171
11-SD-52-8.300000000000001/8.300000000000001Provide traffic control, clean, inspect, and prepare culverts, CIPP line culverts, import borrow and repair embankment, install rock slope protection, install 24\" RCP, invert pave existing culverts, landscape embankment, install erosion  1 (06/11/2024)Details CEM-3701 Report
995364Project ID: 995364
DEA: 051Q9404
EFIS: 0523000104
05-SCR-1-33/33Restore slope  1 (11/16/2023)Details CEM-3701 Report
995365Project ID: 995365
DEA: 034J5804
EFIS: 0323000209
03-YOL--2.2/2.7Site preparation, reset guardrail, debris removal, backfill, HMA Dike, concrete vegetation control, erosion control, traffic control, and incidental work  1 (11/13/2023)Details CEM-3701 Report