Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 14131-14140 of 14230 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActionsSample
      
212928Project ID: 212928
DEA: 07306904
EFIS: 0714000188
07-LA-Sierra Hwy-LA 29.24-29.64Sierra Highway Pedestrian Bridge & Street ImprovementsSierra Highway in the City of Santa Clarity 2 (01/31/2018)DetailsPersonnelView Sample
212941Project ID: 212941
DEA: 040Q2804
EFIS: 0418000067
COOP: 042669
04--880-13.0/14.2Modify 880 InterchangeWhipple Road and Industrial Parkway 2 (11/04/2019)DetailsPersonnelView Sample
212977Project ID: 212977
DEA: 040K2204
EFIS: 0416000067
04--80-   2 (11/04/2019)DetailsPersonnelView Sample
213041Project ID: 213041
DEA: 07310301
Permit Numbers: 0716AOP1299
07---  08/06/20182 (01/09/2018)DetailsPersonnelView Sample
213132Project ID: 213132
DEA: 03372814
EFIS: 0314000301
Permit Numbers: 0317AOP0994 0318ADP0096
03-ED-50-16/16.6Western Placerville Interchanges Project Phase 2. Construction of EB auxiliary lane Forni Road, EB off ramp at Ray Lawyer Drive, a storm water detention basin and a signalized intersection at Ray Lawyer Drive.US 50, Placerville 2 (02/16/2018)DetailsPersonnelView Sample
213149Project ID: 213149
DEA: 043K9704
EFIS: 0417000227
Permit Numbers: 0418NOP2127
04-SM-101-6.2Construct a joint-use path (Pedestrian under-crossing) under US 101 from Bair Island Road to Convention Way. The Bair Island Road US 101 Undercrossing Project (Project), will connect Bair Island Road east of US 101Redwood City, Bair Island Rd connect with Convention Way under 101 2 (02/21/2018)DetailsPersonnelView Sample
213176Project ID: 213176
DEA: 044G6044
EFIS: 0416000117
COOP: 042684
04-SM-82-20.9/21.6Grand Boulevard Initiative Complete Streets Program, construct median landscaping and other sustainable green features in SSFState Route 82 (El Camino Real) from approximately 250' south of Kaiser Way to the McLellan Drive intersection 2 (11/04/2019)DetailsPersonnelView Sample
213177Project ID: 213177
DEA: 11425704
EFIS: 1116000118
Permit Numbers: 1118NOP0060 1118NRD0366
11---33.9/34.4enter upon State Highway right of way in San Diego County, City of San Diego, on Route 5, post mile R33.9 to R34.4 to perform highway improvements, as shown on the attached plans, pursuant to the requirements and conditions contained in the Highway Improvement Agreement listed above, pursuant to thI-5, SAN DIEGO NOT VERIFIEDDetailsPersonnelView Sample
213207Project ID: 213207
DEA: 11403114
EFIS: 1114000077
Permit Numbers: 1117NOP0633 1118NDP0022 1118NRD0057 1118NRW1003
11---3.95/3.95enter upon State Highway right of way in San Diego County, City of San Diego, on Route 163, post mile 3.95, to construct and extend Hazard Center Drive westerly under highway State Route 163, as shown on the attached plans, pursuant to the requirements and conditions contained in the Highway ImprovSTATE ROUTE 163, SAN DIEGO 2 (05/01/2018)DetailsPersonnelView Sample
213241Project ID: 213241
DEA: 042K5904
EFIS: 0416000455
Permit Numbers: 0418NOP0565 04186DP0589
04-SM-SR-84-26.4 / 27.6Construct a Pedestrian Overcrossing Bridge that is part of the Facebook Campus Expansion Project Bayfront Expressway Improvements project located in the City of Menlo Park. This bridge will crossover the Bayfront Expressway (State Route 84) and will linkCity of Menlo Park 2 (01/04/2019)DetailsPersonnelView Sample