Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 14121-14130 of 17201 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
995059 | Project ID: 995059 DEA: 081G6404 EFIS: 0816000046 | 08-SBD-395-R4.0/49.0 | REPLACE ASPHALT CONCRETE SURFACING, COLD PLANE AC PVMT AND RHMA. | SAN BERNARDINO COUNTY AT VARIOUS LOCATIONS FROM ROUTE 15/395 SEPARATION TO 3.1 MILES NORTH OF ROUTE 58/395 SEPARATION | 1 (08/15/2023) | Details CEM-3701 Report | |
995060 | Project ID: 995060 DEA: 081J2604 EFIS: 0818000012 | 08-RIV-215-R13.5/R19.5 | RHMA, REPLACE AC SURFACING, ROCK BLANKET, AND COMPOST. | RIVERSIDE COUNTY IN MURRIETA AND MENIFEE FROM 1.0 MILE NORTH OF CLINTON KEITH ROAD TO 1.0 MILE NORTH OF NEWPORT ROAD | 1 (08/15/2023) | Details CEM-3701 Report | |
995062 | Project ID: 995062 DEA: 081N1214 | 08-SBD-15-180.9/185.5 | LANE CONTROL SIGN SYSTEMS. | SAN BERNARDINO COUNTY ABOUT 43 MILES NORTH OF BAKER AT VARIOUS LOCATIONS FROM 0.5 MILE SOUTH OF YATES WELL ROAD OVERCROSSING TO 0.7 MILE SOUTH OF NEVADA STATE LINE | 1 (08/15/2023) | Details CEM-3701 Report | |
995064 | Project ID: 995064 DEA: 112N1424 EFIS: 1121000265 | 11-SD-52,125-13.8,13.8 | GRIND, CLEAN AND REPAIR BRIDGE DECK, OVERLAY WITH POLYESTER CONCRETE. | SAN DIEGO COUNTY IN SANTEE ON ROUTE 52 AT SAN DIEGO RIVER-HOLLINS LAKE BRIDGE AND IN LA MESA ON ROUTE 125 AT PANORAMA DRIVE UNDERCROSSING. | 1 (01/02/2024) | Details CEM-3701 Report | |
995066 | Project ID: 995066 DEA: 11430304 EFIS: 1118000099 | 11-IMP-78,111-Var | INSTALL RUMBLE STRIPS, UPGRADE GUARDRAIL AND FACILITIES. | IMPERIAL COUNTY AT VARIOUS LOCATIONS | 1 (12/21/2023) | Details CEM-3701 Report | |
995067 | Project ID: 995067 DEA: 11430394 EFIS: 1118000115 | 11-SD-805-23.9/25.1 | WIDEN FREEWAY, STRUCTURES, CONSTRUCT SIGNS, LANDSCAPE AND ELECTRICAL. | SAN DIEGO COUNTY IN SAN DIEGO FROM 0.2 MILE NORTH OF ROUTE 805/52 SEPARATION TO 0.3 MILE SOUTH OF NOBEL DRIVE OVERCROSSING | 1 (12/19/2023) | Details CEM-3701 Report | |
995069 | Project ID: 995069 DEA: 072XH804 EFIS: 0723000294 | 07-LA-10-R2.25 | 1 (08/07/2023) | Details CEM-3701 Report | |||
995070 | Project ID: 995070 DEA: 051Q7104 EFIS: 0523000066 MINOR: 05A2637 | 05-SLO-1-17.11 | 1 (08/16/2023) | Details CEM-3701 Report | |||
995071 | Project ID: 995071 DEA: 060W8004 EFIS: 0617000306 | 06-FRE-99-21.2/24.4 | 1 (08/08/2023) | Details CEM-3701 Report | |||
995072 | Project ID: 995072 DEA: 051P7004 EFIS: 0522000097 | 05-SLO-58-45.0/51.0 | Partial depth recycling with RHMA-G overlay. | ON STATE HIGHWAY IN SAN LUIS OBISPO COUNTY ABOUT 22 MILES WEST OF MCKITTRICK FROM 0.2 MILE WEST OF SODA LAKE ROAD TO 0.3 MILE EAST OF BOULDER CREEK ROAD. | 09/12/2023 | 1 (08/08/2023) | Details CEM-3701 Report |