Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 15401-15410 of 17447 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
2084 | Project ID: 2084 DEA: 042707A4 | 04-ALA-13-10.3/13.3 | HIGHWAY PLANTING AND INSTALL IRRIGATION SYSTEM | IN ALAMEDA COUNTY IN OAKLAND FROM JOAQUIN MILLER ROAD OVERCROSSING TO MORAGA AVENUE UNDERCROSSING | 08/31/2012 | 1 (08/31/2012) | Details CEM-3701 Report |
2083 | Project ID: 2083 DEA: 04270524 | 04-SCL-280-0 | UPGRADE METAL BEAM MEDIAN BARRIER | IN SANTA CLARA COUNTY AT VARIOUSLOCATIONS | 04/20/2011 | 1 (04/20/2011) | Details CEM-3701 Report |
2082 | Project ID: 2082 DEA: 04270514 | 04-SCL-680-M | REPLACE EXISTING MEDIAN BARRIER | IN SANTA CLARA COUNTY IN SAN JOSE AND MILPITAS FROM THE ROUTE 280 AND 101 JUNCTION TO CALAVERAS ROAD | 04/20/2011 | 1 (04/20/2011) | Details CEM-3701 Report |
2081 | Project ID: 2081 DEA: 04269604 | 04-CC-24-0.2/13.3 | HWY 24 REHAB PROJECT- REPLACE CONCRETE PAVEMENT (RAPID STRENGTH CONCRETE); STRUCTURAL CONCRETE (APPROACH SLAB); PAVING NOTCH EXTENSIONS | IN CONTRA COSTA COUNTY IN LAFAYETTE AND ORINDA FROM THE CALDECOTT TUNNEL TO EL CURTOLA ROAD OVERCROSSING | 04/20/2011 | NOT VERIFIED | Details CEM-3701 Report |
2080 | Project ID: 2080 DEA: 04268704 | 04-CC-4-R17.2/R17.6 | REPLACE CONCRETE PAVEMENT. | CONTRA COSTA COUNTY NEAR CONCORD FROM 0.3 MILE TO 0.7 MILE EAST OF WILLOW PASS ROAD UNDERCROSSING. | 11/02/2011 | 1 (09/12/2011) | Details CEM-3701 Report |
2079 | Project ID: 2079 DEA: 04265504 | 04-ALA,CC-24-R0.0/R0.4,R5.9/R6.2 | UPGRADE EXISTING AM/FM REBROADCAST SYSTEM | IN ALAMEDA AND CONTRA COSTS COUNTIES IN AND NEAR THE CITY OF OAKLAND AT THE CALDECOTT TUNNEL. | 04/20/2011 | 1 (04/20/2011) | Details CEM-3701 Report |
2078 | Project ID: 2078 DEA: 04264904 EFIS: 0400000741 | 04-SCL-17-0.0/2.8 | DRAINAGE SYSTEM TO BE REPLACED AND IMPROVED. | SANTA CLARA COUNTY ON ROUTE 17 FROM 0.1 MILE SOUTH OF SUMMIT ROAD SEPARATION TO 2.8 MILES NORTH OF SUMMIT ROAD | 08/21/2018 | 1 (04/26/2012) | Details CEM-3701 Report |
2077 | Project ID: 2077 DEA: 042642A4 EFIS: 0400020483 | 04-SM-101-13.5/17.7 | ESTABLISH EXISTING HIGHWAY PLANTING AND IRRIGATION SYSTEMS | SAN MATEO COUNTY IN SAN MATEO AND BURLINGAME ON ROUTE 101 FROM 0.2 MILE SOUTH OF MILLBRAE AVENUE OVERCROSSING IN MILLBRAE TO 3RD AVENUE OVERCROSSING IN SAN MATEO | 08/22/2018 | 1 (09/19/2011) | Details CEM-3701 Report |
2076 | Project ID: 2076 DEA: 04264204 | 04-SM-101-13.5/17.9 | 101 AUX LANE- HWY MODIFICATION FROM MILBRAE AVE. TO 3RD AVE. NORTHBOUND AND SOUTHBOUND RAMPS | 11/01/2011 | 1 (04/26/2011) | Details CEM-3701 Report | |
2075 | Project ID: 2075 DEA: 04264084 EFIS: 0400000734 | 04-SON-101-2.9 - 0.4 | MAJOR WIDENING, CONSTRUCT INTERCHANGE AT PETALUMA BLVD - Replace Petaluma River Bridge - Precast Super Girders | Petaluma Blvd. | 06/08/2020 | 1 (01/13/2012) | Details CEM-3701 Report |