Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 14761-14770 of 17602 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
2889 | Project ID: 2889 DEA: 050S6904 EFIS: 0500000453 MINOR: 05A1408 | 05-SLO-1-59.4/70.9 | Replace four culverts in San Luis Obispo County | Near San Simeon from 0.6 mile south of Arroyo Laguna Creek Bridge to 0.4 mile south of San Carpoforo Creek Bridge. | 03/20/2020 | 1 (11/08/2019) | Details CEM-3701 Report |
2888 | Project ID: 2888 DEA: 050S6804 EFIS: 0500000452 MINOR: 05A1424 | 05-SLO-58-3.8/20.4 | Repair four culverts near Santa Margarita | 0.7 mile east of Pozo Road to 0.5 mile west of Shell Creek Road. | 03/20/2020 | 1 (11/08/2019) | Details CEM-3701 Report |
2887 | Project ID: 2887 DEA: 050S6804 EFIS: 0500000452 MINOR: 05A1445 | 05-SLO-58-3.8/20.4 | Repair four culverts | Near Santa Margarita from 0.7 mile east of Pozo Road to 0.5 milewest of Shell Creek Road. | 03/20/2020 | 1 (11/08/2019) | Details CEM-3701 Report |
2886 | Project ID: 2886 DEA: 050S6204 | 05-SLO-46-29.9/31.1,31.4/32.0 | OVERLAY ROADWAY WITH RUBBERIZED HOT MIX ASPHALT (GAP GRADED). | SAN LUIS OBISPO COUNTY IN PASO ROBLES FROM SALINAS RIVER BRIDGE TO 0.2 MILE WEST OF GOLDEN HILL ROAD AND FROM 0.2 MILE EAST OF GOLDEN HILL ROAD TO HUER HUERO CREEK BRIDGE | 04/20/2011 | 1 (04/20/2011) | Details CEM-3701 Report |
2885 | Project ID: 2885 DEA: 050S6104 | 05-SB-101-12.7/21.0 | Place hot mix asphalt (Bonded Wearing Course - Gap Graded). | SANTA BARBARA COUNTY IN AND NEAR SANTA BARBARA FROM MILPAS STREET UNDERCROSSING TO MARIA YGNACIO CREEK BRIDGE | 07/14/2011 | 1 (09/23/2010) | Details CEM-3701 Report |
2884 | Project ID: 2884 DEA: 050S5804 EFIS: 0500000444 | 05-MON-101-62.7/62.75 | REPLACE BRIDGE RAILING, GUARDRAILING APPROACH TAPERS,PLACE POLYESTER OVERLAY | 03/18/2020 | 1 (05/04/2009) | Details CEM-3701 Report | |
2883 | Project ID: 2883 DEA: 050S5104 | 05-MON-1-21.1/21.4 | REPAIR ROACK FALL DRAPERY SYSTEM | 04/20/2011 | 1 (04/20/2011) | Details CEM-3701 Report | |
2882 | Project ID: 2882 DEA: 050S4404 EFIS: 0500000431 | 05-SB-166-R25.5/R31.7 | CONSTRUCT CENTERLINE RUMBLE STRIPS. | SANTA BARBARA COUNTY FROM ALISO CREEK BRIDGE TO 1 MILE EAST OF CUYAMA RIVER BRIDGE | 01/17/2014 | 1 (09/27/2010) | Details CEM-3701 Report |
2881 | Project ID: 2881 DEA: 050S4104 | 05-SB-154-R8.1/R32.1 | PLACE CENTERLINE RUMBLE STRIP | SANTA BARBARA COUNTY IN AND NEAR SANTA BARBARA FROM 0.2 MILE EAST OF JUNCTION ROUTE 246 WEST TO 0.1 MILE WEST OF ROUTE 154/101 SEPARATION | 01/14/2011 | 1 (09/23/2010) | Details CEM-3701 Report |
2880 | Project ID: 2880 DEA: 050S4004 | 05-SB-246-9.6/R21.0 | PLACE HOT MIX ASPHALT OVERLAY, SHOULDER AND CENTERLINE RUMBLE STRIP. | SANTA BARBARA COUNTY IN AND NEAR LOMPOC FROM EAST JUNCTION ROUTE 1 TO 0.8 MILE EAST OF DRUM CANYON ROAD | 01/26/2011 | 1 (09/23/2010) | Details CEM-3701 Report |