Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 14721-14730 of 17622 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
2950Project ID: 2950
DEA: 05330724
EFIS: 0500000499
05-SLO-46-36.6/41.2CONVERT 2-LANE HIGHWAY TO 4-LANE EXPRESSWAY.SAN LUIS OBISPO COUNTY IN AND NEAR PASO ROBLES FROM 0.5 MILE WEST OF GENESEO ROAD TO 0.6 MILE EAST OF ALMOND DRIVE08/22/20181 (09/26/2012)Details CEM-3701 Report
2949Project ID: 2949
DEA: 05330714
05-SLO-46-51.7/59.8CONVERT 2 LANE HIGHWAY TO 4 LANE EXPRESSWAY 08/29/20121 (09/19/2012)Details CEM-3701 Report
2948Project ID: 2948
DEA: 05315924
EFIS: 0500000496
05-MON-1-160.7/163.3New Interchange To Be Constructed 05/19/20141 (09/26/2012)Details CEM-3701 Report
2947Project ID: 2947
DEA: 05314304
05-SB-101-R6.4CONSTRUCT AND RETROFIT SOUND WALLIN SANTA BARBARA COUNTY NEARSUMMERLAND FROM 0.2 KM NORTHOF GARRAPATA CREEK TO PADAROLANE OVERCROSSING08/10/20101 (08/10/2010)Details CEM-3701 Report
2946Project ID: 2946
DEA: 05300184
Permit Numbers: 0507NMC0436
05-SLO-1-CAMBRIA FLOOD MITIGATION PROJECT/ EA 05-0G7604Enter the work location.07/19/2019NOT VERIFIEDDetails CEM-3701 Report
2945Project ID: 2945
DEA: 05300164
05-SLO-1-naCONSTRUCT A REINFORCED CONCRETE BR OVER LEFFINGWELL CREEK MOONSTONE BEACH DRCambria, CA09/06/2019NOT VERIFIEDDetails CEM-3701 Report
2944Project ID: 2944
DEA: 05300134
05-SLO-101-50.64VINEYARD DRIVE INTERCHANGE IMPROVEMENTS EA 05-0H8404Enter the work location.09/06/2019NOT VERIFIEDDetails CEM-3701 Report
2943Project ID: 2943
DEA: 05282814
05-SB-150-1PLANTING AND IRRIGATIONIN SANTA BARBARA AND VENTURACOUNTIES NEAR CARPENTERIA FROM 1.6KM EAST TO 2.7 KM EAST OF ROUTE 150 AND 101 SEPARATION08/10/20101 (08/10/2010)Details CEM-3701 Report
2942Project ID: 2942
DEA: 051L2904
05-SM-101-6.62Wipple Ave and Northbound Route 101 Off-ramp in Redwood City (05A1521) 03/18/20201 (08/08/2007)Details CEM-3701 Report
2941Project ID: 2941
DEA: 051A5704
EFIS: 0500020407
05-MON-1-21.5/21.6Construct Soilder Pile Tie Back Retaining Wall and Reconstruct lane and shoulder 05/20/20141 (06/20/2011)Details CEM-3701 Report