Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 14231-14240 of 16094 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
1900Project ID: 1900
DEA: 041E1404
04-SOL-80-30.6/38.2REPLACE FAILED PCC PAVEMENT 07/29/20111 (07/29/2011)Details Personnel CEM-3701 Report
1899Project ID: 1899
DEA: 041E1304
04-SF-35-0.0/2.0REPLACE ASPHALT CONCRETE SURFACING 04/20/20111 (04/20/2011)Details Personnel CEM-3701 Report
1898Project ID: 1898
DEA: 041E1204
04-SCl-9-6.9/11.5RESURFACE ROADWAY W/MICROSURFACINGIn Santa Clara County in Saratoga, Monte Sereno and Los Gatos from 0.2 mile north of Saratoga Creek Bridge to Route 1704/20/20111 (04/20/2011)Details Personnel CEM-3701 Report
1897Project ID: 1897
DEA: 041E1104
04-SOL-113-0.0/12.5COLD PLANE ASPHALT CONCRETE PAVEMENT AND HOT MIX ASPHALT SURFACING 07/29/20111 (07/29/2011)Details Personnel CEM-3701 Report
1896Project ID: 1896
DEA: 041E1004
04-ALA-580-46.5/46.9METHACRYLATE BRIDGE DECK 04/19/20211 (06/04/2007)Details Personnel CEM-3701 Report
1895Project ID: 1895
DEA: 041E0904
04-SCL-17-6.9/9.1PLACE ASPHALT CONCRETE SURFACING AND REPLACE PCC PAVEMENT.SANTA CLARA COUNTY IN LOS GATOS FROM 0.4 MILE NORTH OF LOS GATOS SCHOOL PEDESTRIAN OVERCROSSING TO 0.1 MILE SOUTH OF ROUTE 17/85 CONNECTOR03/05/20121 (08/27/2012)Details Personnel CEM-3701 Report
1894Project ID: 1894
DEA: 041E0804
04-CC-4-R40.8/48.4REPLACE ASPHALT CONCRET SURFACING 04/20/20111 (04/20/2011)Details Personnel CEM-3701 Report
1893Project ID: 1893
DEA: 041E0704
04-SM-101-6.6/11.9HOT MIXED ASPHLAT SURFACING 04/20/20111 (04/20/2011)Details Personnel CEM-3701 Report
1892Project ID: 1892
DEA: 041E0604
04-SOL-12,128-20.6/25.1Replace Asphalt Concrete Surfacing 07/29/20111 (07/29/2011)Details Personnel CEM-3701 Report
1891Project ID: 1891
DEA: 041E0404
04-SM-1-47.8/48.4REPAIR CONCRETE SPALLS AND PLACE POLYESTER CONCRETE 04/20/20111 (04/20/2011)Details Personnel CEM-3701 Report