Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 13551-13560 of 16094 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
2587 | Project ID: 2587 DEA: 050J3204 EFIS: 0500000093 | 05-SB-101-R15.8 | UPGRADE PUMPING PLANT BY REPLACING EQUIPMENT AND ADDING CONTROL ROOM. | SANTA BARBARA COUNTY IN SANTA BARBARA AT MISSION STREET UNDERCROSSING | 01/17/2014 | 1 (05/22/2012) | Details Personnel CEM-3701 Report |
2586 | Project ID: 2586 DEA: 050J3004 | 05-SBT-156-14.7 | SEISMIC RETROFIT AND DECK SEAL | 04/20/2011 | 1 (04/20/2011) | Details Personnel CEM-3701 Report | |
2585 | Project ID: 2585 DEA: 050J2804 | 05-SB-101-90.8/90.9 | Construct MBGR | 07/20/2007 | NOT VERIFIED | Details Personnel CEM-3701 Report | |
2584 | Project ID: 2584 DEA: 050J2414 MINOR: 05A0980 | 05--- | 03/19/2020 | 1 (11/04/2019) | Details Personnel CEM-3701 Report | ||
2583 | Project ID: 2583 DEA: 050J1904 | 05-SCr-1-34.3,34.5 | REPLACE CULVERTS | In Santa Cruz County near Davenport at 2.0 and 1.8 miles south of Waddell Creek. | 04/20/2011 | 1 (04/20/2011) | Details Personnel CEM-3701 Report |
2582 | Project ID: 2582 DEA: 050J0604 | 05-SB-217-.9 | MEDIAN BARRIER | IN SANTA BARBARA COUNTY IN GOLETA FROM 0.3 KM NORTH OF GOLETA SLOUGHBRIDGE TO HOLLISTER AVENUEUNDERCROSSING | 08/10/2010 | 1 (08/10/2010) | Details Personnel CEM-3701 Report |
2581 | Project ID: 2581 DEA: 050J0304 MINOR: 05A1101 | 05-SCR-17-6.86 | REPALCE CULVERT IN SCr CO. | 03/20/2020 | 1 (11/04/2019) | Details Personnel CEM-3701 Report | |
2580 | Project ID: 2580 DEA: 050J0204 MINOR: 05A1103 | 05-SCR-17-8.89 | CURED IN PLACE CULVERT LINING | 1 (11/04/2019) | Details Personnel CEM-3701 Report | ||
2579 | Project ID: 2579 DEA: 050H9204 | 05-SB-166-41.6 | PLACE ROACK SLOPE PROTECTION | 08/10/2010 | 1 (08/10/2010) | Details Personnel CEM-3701 Report | |
2578 | Project ID: 2578 DEA: 050H8904 EFIS: 0500000088 MINOR: 05A1120 | 05-SLO-101-128.72,29.6 | CONSTRUCT CCTV SYSTEMS | 03/23/2020 | 1 (11/04/2019) | Details Personnel CEM-3701 Report |