Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 15581-15590 of 17715 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
994098 | Project ID: 994098 DEA: 021J8404 EFIS: 0221000001 | 02-SHA-44-12.0/22.78 | Dersch Road Culverts | 08/14/2023 | 1 (07/11/2022) | Details CEM-3701 Report | |
994099 | Project ID: 994099 DEA: 041Y0304 EFIS: 0422000418 | 04-SCL-101-44.79 | 1 (09/13/2022) | Details CEM-3701 Report | |||
994100 | Project ID: 994100 DEA: 070Q8804 EFIS: 0721000106 MINOR: 07A5307 | 07-LA-164-3.6 | 1 (07/06/2022) | Details CEM-3701 Report | |||
994101 | Project ID: 994101 Permit Numbers: 1121NUJ0319 11226DP0462 | 11---12.17/12.74 | 1. POSTMILE: SD 12.17INTERSECTION OF CAMINO DEL REY AND SR-76OPEN CUT PIT AT BEND NEAR THOROUGHBRED ROAD AND CIPP THE EXISTING 12-INCH VITRIFIED CLAY PIPE A TOTAL940 FT DOWNSTREAM WITHIN CALTRANS ROW AND INSTALL 12-INCH PRIMUS LINE INSIDE OF CIPP LINED PIPE.2. POSTMILE: SD 12.36SR-76/OLD MISSION RO | ROUTE 76, BONSALL | 1 (09/14/2022) | Details CEM-3701 Report | |
994102 | Project ID: 994102 DEA: 11430644 EFIS: 1119000045 | 11-SD-905-12.0 | CONSTRUCT WEIGH-IN-MOTION FACILITY, CRCP, HMA, AND RETAINING WALL. | SAN DIEGO COUNTY NEAR SAN DIEGO AT OTAY MESA COMMERCIAL VEHICLE ENFORCEMENT FACILITY | 1 (08/24/2022) | Details CEM-3701 Report | |
994103 | Project ID: 994103 DEA: 114C0014 EFIS: 1122000095 | 11-IMP-7-0.1/0.5 | INSTALL ARTWORK MONUMENT AND PLACE GRAVEL MULCH. | IMPERIAL COUNTY EAST OF CALEXICO FROM 0.2 MILE SOUTH TO 0.2 MILE NORTH OF VEHICLE SEPARATION / ROUTE 7 SPUR | 1 (08/23/2022) | Details CEM-3701 Report | |
994104 | Project ID: 994104 DEA: 120T3104 EFIS: 1222000034 | 12-ORA-5,91-34.5/44.3,R0.0/5.9 | PLACE ROCK BLANKET, LANDSCAPE AND IRRIGATION FACILITIES. | ORANGE COUNTY ON ROUTE 5 FROM SANTA ANA RIVER TO ARTESIA BOULEVARD AND ON ROUTE 91 FROM LOS ANGELES COUNTY LINE TO MIRALOMA AVENUE | 1 (10/31/2022) | Details CEM-3701 Report | |
994105 | Project ID: 994105 DEA: 120T3304 EFIS: 1222000036 | 12-ORA-5,55-29.6/32.2,R9.1/10.5 | INSTALL IRON FENCE AND MODIFY LANDSCAPE & IRRIGATION FACILITIES. | ORANGE COUNTY IN TUSTIN AND SANTA ANA ON ROUTE 5 FROM NEWPORT AVENUE TO 17TH STREET AND ON ROUTE 55 FROM 0.2 MILE SOUTH OF EDINGER AVENUE TO MAIN STREET | 1 (12/14/2022) | Details CEM-3701 Report | |
994106 | Project ID: 994106 DEA: 043Q8404 EFIS: 0419000271 COOP: 042768 | 04-ALA-980-1.8/1.9 | BART'S NEW HIGH VOLTAGE TRACTION POWER SUBSTATION | UNDER THE RAMP FROM EASTBOUND I-580 TO SOUTHBOUND I-980 RAMP STRUCTURE SOUTH OF 34TH STREET IN OAKLAND | 2 (09/20/2022) | Details CEM-3701 Report | |
994107 | Project ID: 994107 EFIS: 1220000015 MINOR: 12A1896 | 12--22-R5.8 | 07/03/2024 | 1 (07/07/2023) | Details CEM-3701 Report |