Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 15441-15450 of 17549 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
993958 | Project ID: 993958 DEA: 061C8704 EFIS: 0621000209 | 06-FRE-41,99,180-R24.3/R31.0, 19.5/22.4, R56.7/R61.4 | Secure and repair damaged entry points at bridge abutments by remove existing fence & replace with hardened fence & gates, and repair damages to other assets. | 05/16/2024 | 1 (07/07/2022) | Details CEM-3701 Report | |
993959 | Project ID: 993959 DEA: 051P0504 EFIS: 0521000161 | 05-SB-101-33.8/44.8 | Drainage repair, winter drainage preparation, bridge repair, fence repair, repair embankment, install rockfall mitigation, install erosion control, provide traffic control | 1 (06/17/2022) | Details CEM-3701 Report | ||
993960 | Project ID: 993960 DEA: 042W7404 EFIS: 0421000266 | 04-ALA-260-R1.1R/R1.9L | Install permanent fuel cell power systems and modify exiting circuit infrastructure | 1 (08/15/2022) | Details CEM-3701 Report | ||
993961 | Project ID: 993961 DEA: 010L4004 EFIS: 0122000003 | 01-MEN-101-38/40 | Replace Culvert and Restore Roadway | 10/20/2022 | 1 (07/01/2022) | Details CEM-3701 Report | |
993962 | Project ID: 993962 DEA: 051P0304 EFIS: 0521000159 | 05-SLO-1-62.5/62.5 | Line corrugated pipe. Repair sinkhole, restore failed highway enbankment and restore section of trail which will be removed during construction. Provide temp traffic control | 03/28/2023 | 1 (06/17/2022) | Details CEM-3701 Report | |
993963 | Project ID: 993963 DEA: 081M6004 EFIS: 0821000145 | 08-RIV-74-80.5/82 | Repair fire damaged roadway | 12/06/2022 | 1 (12/05/2022) | Details CEM-3701 Report | |
993964 | Project ID: 993964 DEA: 32943034 | 03-ORA- - | Batavia Equipment shop repairs | NOT VERIFIED | Details CEM-3701 Report | ||
993965 | Project ID: 993965 DEA: 042K0504 | 04-CC-80-.2/8.5 | Resurface Bridge Decks. | 08/15/2022 | 1 (08/15/2022) | Details CEM-3701 Report | |
993966 | Project ID: 993966 DEA: 071XE104 EFIS: 0717000255 | 07-VEN-150-1.6/8.5, 1.6-8.5 | Remove unstable slope material, clean shoulder of debris and stabilize the slope | 10/06/2022 | 1 (10/06/2022) | Details CEM-3701 Report | |
993967 | Project ID: 993967 DEA: 023H3504 EFIS: 0217000100 | 02-TRI-36-14.1/14.60 | Replace/repair 2 culverts and Drainage inlets, restore subgrade and pavement | 06/23/2022 | 1 (06/23/2022) | Details CEM-3701 Report |