Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 14791-14800 of 17277 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
993299Project ID: 993299
DEA: 022J3904
EFIS: 0221000073
02-SHA-44-45.5/51.6HMA OVERLAY, REPLACE AC SURFACING AND SHOULDER BACKING.SHASTA COUNTY NEAR VIOLA FROM 3.0 MILES EAST OF DEER FLAT ROAD TO 0.5 MILE EAST OF BRIDGE CREEK ROAD11/23/20221 (10/18/2021)Details CEM-3701 Report
993300Project ID: 993300
DEA: 044J3004
EFIS: 0415000320
04-NAP-29-29.3/36.9COLD PLANE AC, PLACE HMA (TYPE A) AND RHMA-G.NAPA COUNTY IN AND NEAR SAINT HELENA AND CALISTOGA FROM YORK CREEK BRIDGE TO ROUTE 12805/31/20231 (10/22/2021)Details CEM-3701 Report
993301Project ID: 993301
DEA: 060U2804
EFIS: 0615000293
06-TUL-245-1.4,4.2PRECAST PRESTRESSED CONCRETE BOX GIRDER AND SLAB, BRIDGE REMOVAL.TULARE COUNTY NEAR WOODLAKE AT YOKOHL CREEK BRIDGE AND AT KAWEAH RIVER BRIDGE 1 (10/11/2021)Details CEM-3701 Report
993302Project ID: 993302
DEA: 081J2104
EFIS: 0817000240
08-SBD-60-R1.4PLACE LCB RAPID SETTING AND JOINTED PLAIN CONCRETE PAVEMENT.SAN BERNARDINO COUNTY IN CHINO AT RAMONA AVENUE OVERCROSSING 1 (10/27/2021)Details CEM-3701 Report
993303Project ID: 993303
DEA: 09381504
EFIS: 0919000063
09-INY-168-32.7/36.5PLACE GABIONS, ROADWAY EXCAVATION, AND MINOR CONCRETE.INYO COUNTY NEAR BIG PINE FROM 1.3 MILES EAST OF WHITE MOUNTAIN ROAD TO 5.1 MILES EAST OF WHITE MOUNTAIN ROAD.07/27/20221 (10/27/2021)Details CEM-3701 Report
993304Project ID: 993304
DEA: 041Q2204
EFIS: 0418000220
COOP: 042833
04-ALA-262-R0.0/R1.07Mission Blvd Cross ConnectorOn State Route 262 (Mission Boulevard) Cross Connector from I-880 to I-680 in the City of Fremont w 2 (05/09/2023)Details CEM-3701 Report
993305Project ID: 993305
Permit Numbers: 04216US0226
04-SCL-880-7.4/7.5PG&E has a project coming up where we will be retiring in place a gas transmission pipeline under state highway 880. This pipeline needs to be retired in place rather than removed due to trenching across the highway would leave a big patch as well as causing severe traffic disruptions. InsteadHighway 880, Milpitas06/22/20221 (10/07/2021)Details CEM-3701 Report
993306Project ID: 993306
DEA: 100V7004
EFIS: 1000020357
MINOR: 10A2244
10-AMA-88-27.4/29.8Culvert ReplacementClosed. Only 35 working days. No activity since October 2021. This project has no bid items that require METS source inspection.09/01/20231 (10/08/2021)Details CEM-3701 Report
993307Project ID: 993307
Permit Numbers: 0421NDP2901
04---40.4/41US-101/ De La Cruz Boulevard interchange improvement.Re-construct the US 10 I /De La Cruz Boulevard/ Trimble Road Interchange to improve traffic operations and connectivity for pedestrians and bicyclists. Work includes:i) Replacement of the existing De La Cruz Boulevard bridge overcrossing with anUS 101/ De La Cruz , San Jose NOT VERIFIEDDetails CEM-3701 Report
993308Project ID: 993308
Permit Numbers: 0421NOP2843
04---40.4/41US-101/ De La Cruz Boulevard interchange improvement.US 101/ De La Cruz , San Jose NOT VERIFIEDDetails CEM-3701 Report