Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 14681-14690 of 17757 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
993181 | Project ID: 993181 DEA: 031H5904 EFIS: 0316000187 | 03-BUT-99- | Eaton Rd I/C Roundabout | 1 (08/20/2021) | Details CEM-3701 Report | ||
993182 | Project ID: 993182 DEA: 024F5204 EFIS: 0213000002 | 02-SIS-5-R9.9/R68.1 | ROADWAY EX, HYDRAULIC BIOTIC GROWTH MED. AND MIDWEST GUARDRAIL SYSTEM. | SISKIYOU COUNTY AT VARIOUS LOCATIONS FROM 0.2 MILE NORTH OF REAM AVENUE OVERCROSSING TO 0.2 MILE SOUTH OF HILT ROAD OVERCROSSING | 10/06/2022 | 1 (08/23/2021) | Details CEM-3701 Report |
993183 | Project ID: 993183 DEA: 031H2704 EFIS: 0316000082 | 03-YUB-70-R11.2/13.5 | UPGRADE BRIDGE RAILS & CONSTRUCT CONCRETE MEDIAN BARRIER. | YUBA COUNTY NEAR LINDA AND MARYSVILLE FROM 2.4 MILES SOUTH OF FEATHER RIVER BOULEVARD UNDERCROSSING TO THE YUBA RIVER BRIDGE AND OVERHEAD | 1 (08/16/2021) | Details CEM-3701 Report | |
993184 | Project ID: 993184 DEA: 040A7724 EFIS: 0420000288 COOP: 0422825 | 04-ALA-80-6.4/6.8 | Excavation, HMA, structural concrete, minor concrete and drainage. | IN BERKELEY AND ALBANY FROM 0.6 MILE NORTH OF UNIVERSITY AVENUE OVERCROSSING TO 0.3 MILE SOUTH OF EL CERRITO SEPARATION AND OVERHEAD | 1 (04/08/2022) | Details CEM-3701 Report | |
993185 | Project ID: 993185 DEA: 043W3904 EFIS: 0421000352 | 04-MRN,MARIN-101-3.54/4.7 | 03/13/2023 | 1 (08/09/2021) | Details CEM-3701 Report | ||
993186 | Project ID: 993186 DEA: 04264704 EFIS: 0400000740 | 04-SCL-101-40.0/41.5 | Reconstruction of the existing three-quadrant cloverleaf interchange to a Type L-9 partial cloverleaf interchange | The Project limits are on Route US 101 at De La Cruz Blvd/Trimble Road Interchange in San Jose at Santa Clara County | 2 (08/09/2021) | Details CEM-3701 Report | |
993187 | Project ID: 993187 DEA: 024H9004 EFIS: 0219000022 MINOR: 02A1950 | 02-PLU-70-80.4/80.8 | Light Poles | 05/14/2024 | 1 (08/23/2021) | Details CEM-3701 Report | |
993188 | Project ID: 993188 DEA: 040W9904 EFIS: 0420000321 MINOR: 04A6110 | 04-MRN-131-2.7 | Install Pedestrian Hybrid Beacons | Marin County | 1 (08/11/2021) | Details CEM-3701 Report | |
993190 | Project ID: 993190 DEA: 081C0834 EFIS: 0816000090 | 08-RIV-10-R134.0/R156.5 | Riv 10 Blythe Pavement Rehab: mainline, shoulders, ramps | 1 (08/31/2021) | Details CEM-3701 Report | ||
993191 | Project ID: 993191 Permit Numbers: 0620NMC0847 | 06---23.66 | Removal and re-installation of traffic signal system, replacement of traffic signal pull boxes, removal and re-installation of conduits and cables to incorporate a left turn indication on Tulare Street. Replacement of traffic signal loop detectors, conduits and cables. Installation of pedestrian pu | Tulare Street, Fresno | 1 (08/23/2021) | Details CEM-3701 Report |