Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 14201-14210 of 17755 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
215420 | Project ID: 215420 DEA: 060R2104 EFIS: 0614000058 | 06-MAD-41-6.2/9.2 | FOR CONSTRUCTION ON STATE HIGHWAY IN MADERA COUNTY NEAR MADERA FROM 0.1 MILE NORTH OF AVENUE 15 TO 2.2 MILES NORTH OF FRIANT MADERA CANAL BRIDGE | MADERA COUNTY NEAR MADERA FROM 0.1 MILE NORTH OF AVENUE 15 TO 2.2 MILES NORTH OF FRIANT MADERA CANAL BRIDGE | 1 (01/06/2021) | Details CEM-3701 Report | |
215421 | Project ID: 215421 DEA: 042K9504 EFIS: 0417000057 | 04-ALA-580-14.4/14.4 | CONSTRUCT MATERIAL TESTING LABORATORY BUILDING. | ALAMEDA COUNTY IN LIVERMORE AT 2201 KITTY HAWK ROAD | 1 (01/06/2021) | Details CEM-3701 Report | |
215422 | Project ID: 215422 Permit Numbers: 0820NMC0665 0821NRT0731 | 08---26.68/26.931 | Enter onto State Route 210 (SR-210) right of way at Highland Avenue and SR-210 WB off-ramp, to do street and storm drain improvements in the southeast corner of the south side of Highland Avenue, to construct 10" asphalt concrete over 8" aggregate base, and 2" AC overlay on the norths | SR-210 at Highland Avenue, San Bernardino | 1 (06/23/2021) | Details CEM-3701 Report | |
215423 | Project ID: 215423 MINOR: 09A0798 | 09-INY-395-0.00/102.9 | 01/03/2022 | 1 (06/23/2021) | Details CEM-3701 Report | ||
215424 | Project ID: 215424 DEA: 024G4404 EFIS: 0214000013 | 02-SIS-3-38.0/38.6 | BRIDGE REPLACEMENT | SISKIYOU COUNTY ABOUT 6 MILES NORTH OF FORT JONES FROM 0.3 MILE SOUTH TO 0.3 MILE NORTH OF LOWER MOFFETT CREEK ROAD | 08/14/2023 | 1 (01/19/2021) | Details CEM-3701 Report |
215425 | Project ID: 215425 DEA: 06360244 EFIS: 0613000005 | 06-TUL-99-30.6/35.2 | Widen Freeway & Bridge Construction (Concrete Bridge) | 1 (11/01/2021) | Details CEM-3701 Report | ||
215426 | Project ID: 215426 DEA: 101C3704 EFIS: 1017000043 | 10-MER-152-26.4/R40.7 | CONSTRUCT MIDWEST GUARDRAIL, CONCRETE BARRIER AND VEGETATION CONTROL. | MERCED COUNTY AT VARIOUS LOCATIONS FROM 0.4 MILE EAST OF MIDWAY ROAD TO 0.2 MILE WEST OF ROUTE 59. | 11/09/2021 | 1 (02/01/2021) | Details CEM-3701 Report |
215427 | Project ID: 215427 DEA: 101J5204 EFIS: 1019000086 | 10-STA-5,99-Var | CONCRETE BRIDGE DECK OVERLAY AND HMA PAVING. | STANISLAUS COUNTY AT VARIOUS LOCATIONS | 10/05/2022 | 1 (02/01/2021) | Details CEM-3701 Report |
215428 | Project ID: 215428 DEA: 120S2204 EFIS: 1219000107 | 12-ORA-133-M4.2/13.4 | PLACE METHACRYLATE, REPLACE JOINT SEALS AND RESURFACE BRIDGE DECK. | ORANGE COUNTY IN LAGUNA BEACH AND IRVINE AT VARIOUS LOCATIONS FROM LAGUNA CANYON CREEK TO SANTIAGO AQUEDUCT UNDERCROSSING | 05/05/2022 | 1 (02/22/2021) | Details CEM-3701 Report |
215429 | Project ID: 215429 DEA: 120S2304 EFIS: 1219000108 | 12-ORA-73-10.3/19.5 | METHACRYLATE DECK SEAL TREATMENT AND POLYESTER CONCRETE OVERLAY | ORANGE COUNTY AT VARIOUS LOCATIONS FROM S73-S5 CONNECTOR VIADUCT IN LAGUNA NIGUEL TO SAND CANYON AVENUE UNDERCROSSING IN IRVINE | 01/18/2022 | 1 (02/22/2021) | Details CEM-3701 Report |