Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 13851-13860 of 17616 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
215062 | Project ID: 215062 DEA: 030F2904 EFIS: 0314000101 | 03-BUT-99-14.9/15.7 | CONSTRUCT BRIDGE AND ROADWAY; & REMOVE BRIDGE. | BUTTE COUNTY ABOUT 10 MILES NORTH OF GRIDLEY FROM 0.3 MILE SOUTH TO 0.5 MILE NORTH OF NELSON AVENUE | 03/02/2022 | 1 (07/20/2020) | Details CEM-3701 Report |
215063 | Project ID: 215063 DEA: 032F5704 EFIS: 0300020615 | 03-PLA-80-46.3/63.5 | Replace 4 Bridges (OC) on Highway 80 from Crystal Springs to Cisco Grove (Baxter, Drum Forebay) | 08/11/2023 | 1 (11/16/2020) | Details CEM-3701 Report | |
215064 | Project ID: 215064 DEA: 032H3004 EFIS: 0317000092 | 03-NEV-80-19.3 | REPLACE LIGHT FIXTURES, OVERHEAD DOORS AND INSPECTION DESK STATIONS. | NEVADA COUNTY IN TRUCKEE AT THE DONNER PASS COMMERCIAL VEHICLE ENFORCEMENT FACILITY | 05/04/2021 | 1 (07/20/2020) | Details CEM-3701 Report |
215065 | Project ID: 215065 DEA: 040J8004 EFIS: 0414000067 | 04-SCL-152-R22.4/R28.7,R34.7 | INSTALL DOUBLE THRIE BEAM BARRIER. | SANTA CLARA COUNTY ABOUT 12 MILES EAST OF GILROY FROM 0.3 MILE WEST OF WALNUT AVENUE TO 0.4 MILE EAST OF KAISER AETNA ROAD AND AT 0.1 MILE WEST OF FIFIELD ROAD | 03/27/2023 | 1 (09/17/2020) | Details CEM-3701 Report |
215066 | Project ID: 215066 DEA: 120P0904 EFIS: 1215000034 | 12-ORA-5-10.3,23.2 | RECONSTRUCT SLOPE AND INSTALL CONCRETE BARRIER, DITCH AND PLANTING. | ORANGE COUNTY IN SAN JUAN CAPISTRANO AND IRVINE AT 0.6 MILE SOUTH OF JUNIPERO ROAD UNDERCROSSING AND AT 0.1 MILE NORTH OF ROUTE 133/5 SEPARATION | 11/18/2021 | 1 (10/23/2020) | Details CEM-3701 Report |
215068 | Project ID: 215068 DEA: 043A6414 EFIS: 0419000153 COOP: 042731 Permit Numbers: 0419NOP3024 | 04--- | 2 (09/07/2021) | Details CEM-3701 Report | |||
215069 | Project ID: 215069 DEA: 060S1404 EFIS: 0614000094 MINOR: 06A2611 | 06--- | 08/16/2023 | 1 (07/13/2020) | Details CEM-3701 Report | ||
215070 | Project ID: 215070 Permit Numbers: 0420NMC0738 04206DP1106 | 04---13.3 | This project consists of the reconstruction and expansion of an existing sidewalk facility and modification to an existing traffic signal to provide a pedestrian and bicycle crossing for a local bike-way/trail project. | Ashby AVE., Berkeley | 08/09/2021 | 1 (08/18/2020) | Details CEM-3701 Report |
215071 | Project ID: 215071 EFIS: 0000020505 Permit Numbers: 11206CD0440 | 11---15/-1 | to perform intersection improvements consisting of the demolition and replacement of the existing north east curb return, pedestrian ramp, and sidewalk associated with the widening of Carroll Canyon Road. The existing traffic signal and equipment on the north east corner of the intersection will b | INTERSTATE-15, SAN DIEGO | 08/24/2021 | 1 (07/17/2020) | Details CEM-3701 Report |
215072 | Project ID: 215072 DEA: 59000000 | 04--- | CITY OF PLEASANTON: 5 BRIDGES, 33C0454, 33C0099, 33C0453, 33C0461, AND 33C0462. BRIDGE PREVENTIVE MAINTENANCE PROJECT : Laurel Creek Dr | 0.4 mi W of Remove and replace existing Type A joint seal at both Alameda Pleasanton 33C0454 29 Laurel Creek Dr Laurel Creek Foothill Rd 97.7 abutment joints. 5,909.00 $53,000.00 $8.97 $46,920.90 $55,773.90 $6,079.10 $7,226.10 3 Install soffit access openings to provide access to box City of 400 ft | NOT VERIFIED | Details CEM-3701 Report |