Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 13741-13750 of 17771 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
214950 | Project ID: 214950 DEA: 11411334 EFIS: 1115000133 | 11-SD-8-5.9/11.5 | PLACE HMA-A, MINOR CONCRETE, MODIFY LANDSCAPE AND ELECTRICAL SYSTEM. | SAN DIEGO COUNTY IN SAN DIEGO AND LA MESA AT VARIOUS LOCATIONS FROM 0.4 MILE WEST OF FAIRMOUNT AVENUE UNDERCROSSING TO 0.2 MILE WEST OF JACKSON DRIVE UNDERCROSSING | 05/06/2022 | 1 (10/27/2020) | Details CEM-3701 Report |
214951 | Project ID: 214951 DEA: 120K0234 EFIS: 1214000100 | 12-ORA-5-17.1/18.9 | South County Improvement Project (Phase 3 - El Toro/Alicia) WIDEN FREEWAY AND BRIDGES, RECONSTRUCT BRIDGE AND WALLS. | ORANGE COUNTY IN MISSION VIEJO, LAGUNA HILLS, LAGUNA WOODS AND LAKE FOREST FROM 0.4 MILE SOUTH OF ALICIA PARKWAY OVERCROSSING TO 0.2 MILE NORTH OF EL TORO ROAD UNDERCROSSING | 1 (10/01/2020) | Details CEM-3701 Report | |
214952 | Project ID: 214952 Permit Numbers: 07206SN0627 | 07---2.24/-1 | Traffic signal modification project - upgrading three (3) traffic signal poles and one pedestrial push button post assembly and appurtenances; within State right of way, on CA-134 at Alameda Avenue; in the city of Burbank; all in accordance with current State specifications and standard plans, Encr | 3401 W. Olive Ave., Burbank | 06/17/2021 | 1 (05/06/2020) | Details CEM-3701 Report |
214953 | Project ID: 214953 DEA: 063HT024 EFIS: 0617000190 | 06-KER-VAR- | The Project consists of 21 miles of trackway for the High?Speed Rail through the counties of Tulare and Kern in the vicinity of Wasco, California. It includes several grade separated crossings, a pedestrian crossing, and a non-standard structure. | Counties of Tulare and Kern at SR43/SR46 | 2 (05/05/2020) | Details CEM-3701 Report | |
214954 | Project ID: 214954 Permit Numbers: 0419NUT1922 | 04-SM-82-8.57 | A new 12" HDPE sanitary sewer force force main will be installed within a new 20' HDPE casing pipe on the North Bound lanes of El Camino Real between North Road and middle Road. | El Camino Real, Belmont | 05/01/2023 | 1 (10/26/2020) | Details CEM-3701 Report |
214955 | Project ID: 214955 DEA: 07329104 EFIS: 0716000190 MINOR: 07A4792 | 07-LA-210- | 1 (05/05/2020) | Details CEM-3701 Report | |||
214956 | Project ID: 214956 DEA: 042K1704 EFIS: 0416000378 | 04-ALA-880,880-15.6/26.5 | CONSTRUCT PVMT, JT SEAL, BARRIER, CL RAILING AND BRIDGE REMOVAL. | ALAMEDA COUNTY AT VARIOUS LOCATIONS | 1 (05/08/2020) | Details CEM-3701 Report | |
214957 | Project ID: 214957 DEA: 081G3704 EFIS: 0815000216 | 08-RIV-74,215-27.5/28.0,23.4/24.0 | INSTALL RAMP METERING SYSTEMS. | RIVERSIDE COUNTY IN CITY OF PERRIS AT ROUTE 215/74 SEPARATION | 06/30/2021 | 1 (08/25/2020) | Details CEM-3701 Report |
214958 | Project ID: 214958 DEA: 110802U4 EFIS: 1117000085 | 11-IMP,IMP/IMP-98-32.1-32.5, 32.1/32.5 | PLACE HMA, MINOR CONCRETE, MODIFY DRAINAGE, LANDSCAPE AND ELECTRICAL. | IMPERIAL COUNTY IN CALEXICO FROM OLLIE AVENUE TO 0.1 MILE EAST OF ROCKWOOD AVENUE | 1 (11/25/2020) | Details CEM-3701 Report | |
214959 | Project ID: 214959 Permit Numbers: 03206SN0062 0320ARD0556 | 03--- | 2 (09/14/2020) | Details CEM-3701 Report |