Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 13491-13500 of 17277 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
214695Project ID: 214695
DEA: 120R8604
EFIS: 1219000048
12-ORA-5-28.3/31.8COLD PLANE AC PVMT AND PLACE RHMA.ORANGE COUNTY IN TUSTIN AND SANTA ANA FROM TUSTIN RANCH ROAD UNDERCROSSING TO GRAND AVENUE UNDERCROSSING01/04/20211 (12/10/2020)Details CEM-3701 Report
214696Project ID: 214696
Permit Numbers: 09196SN0290
09---8.988/-1Relocation of two tendons on pole A at the intersection of Tucker Rd (SR 202) and Red Apple Plaza in the City of Tehachapi CATucker Road (SR 202), Tehachapi06/23/20211 (02/20/2020)Details CEM-3701 Report
214697Project ID: 214697
DEA: 07307104
EFIS: 0714000213
07-LA-101-32.8CONSTRUCT BRIDGE.LOS ANGELES COUNTY IN AND NEAR AGOURA HILLS FROM 0.1 MILE WEST OF LIBERTY CANYON ROAD UNDERCROSSING TO 0.6 MILE EAST OF PALO COMADO OVERCROSSING 1 (07/12/2021)Details CEM-3701 Report
214698Project ID: 214698
DEA: 120N8904
EFIS: 1214000130
12-ORA-133-8.3/M9.3CONSTRUCT AUXILIARY LANE.ORANGE COUNTY IN IRVINE FROM ROUTE 133/405 SEPARATION TO IRVINE CENTER DRIVE OVERCROSSING 1 (02/22/2021)Details CEM-3701 Report
214699Project ID: 214699
Permit Numbers: 0718NMC1840 0719NRT2839 0720NRT0484
07---23.043/-11. Grind and resurface roadway pavement on Verdugo Blvd., repair broken curb, gutter, sidewalk, upgrade the wheelchair ramps to make them ADA compliant; install pavement stripping.2. Traffic signal modification at Verdugo Blvd. and 2 freeway off-ramp.3. Traffic ControlPlease see attached plansVerdugo Boulevard, Glendale06/17/20211 (02/10/2020)Details CEM-3701 Report
214700Project ID: 214700
DEA: 030F2804
EFIS: 0312000069
03-SAC-99-7.1/9.4Dillard Overcrossing and McConnel OverheadHwy 99, Elk Grove, CA08/21/20231 (04/20/2020)Details CEM-3701 Report
214701Project ID: 214701
DEA: 030F2844
EFIS: 0319000204
03-SAC-99-7.1/9.4Construct new PCC precast girder bridge over UPRR at McConnell OH between existing SB and NB alignments 11/27/20231 (04/20/2020)Details CEM-3701 Report
214702Project ID: 214702
DEA: 030F2864
EFIS: 0320000123
03-SAC-99-7.92 / 8.4Remove and replace Consumnes River and Consumnes River Overflow bridgeSacramento County11/28/20231 (04/20/2020)Details CEM-3701 Report
214703Project ID: 214703
DEA: 034F1724
EFIS: 0318000216
MINOR: 03A2999
03-YOL-16-25.1 - 25.5Capay 016 ImprovementsIN CAPAY FROM 0.1 MILE WEST OF CAPAY CANAL BRIDGE TO 0,3 MILE WEST OF COUNTY ROAD 85.08/24/20221 (03/09/2020)Details CEM-3701 Report
214704Project ID: 214704
DEA: 04013594
EFIS: 0420000122
04-SF-80-7.8/8.3BATA Rehab  1 (02/12/2020)Details CEM-3701 Report