Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 321-330 of 17895 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
5893 | Project ID: 5893 DEA: 103A1204 | 10-SJ-5-13.9 | WIDEN ROADWAY AND BRIDGES | IN SAN JOAQUIN COUNTY IN LATHROPFROM 0.1 KM NORTH OF PARADISE CUT OVERFLOW BRIDGE TO 0.7 KM NORTH OFROUTE 5 AND 120 SEPERATION OVERHEAD | 05/16/2011 | 1 (05/16/2011) | Details CEM-3701 Report |
1597 | Project ID: 1597 DEA: 040A1844 EFIS: 0400020004 COOP: 042337 | 04-SON-101-7.1/8.9 | WIDEN ROADWAY AND BRIDGE. | SONOMA COUNTY IN AND NEAR PETALUMA FROM 0.5 MILE SOUTH OF OLD REDWOOD HIGHWAY OVERCROSSING TO 0.1 MILE NORTH OF PEPPER ROAD | 10/14/2013 | 1 (06/28/2011) | Details CEM-3701 Report |
6914 | Project ID: 6914 DEA: 120F0604 EFIS: 1200000110 | 12-ORA-5-5.6/6.6 | WIDEN ROADWAY AND BRIDGE, REPLACE CONCRETE PAVEMENT AND PLACE HMA. | ORANGE COUNTY IN SAN CLEMENTE AND DANA POINT FROM 01. MILE SOUTH OF CAMINO DE ESTRELLA OVERCROSSING TO 0.2 MILE SOUTH OF VIA CALIFORNIA OVERCROSSING AT CAMINO DE ESTRELLA | 01/29/2015 | 1 (12/10/2012) | Details CEM-3701 Report |
2316 | Project ID: 2316 DEA: 044396U4 | 04-SCL-87- | WIDEN ROADWAY AND BRIDGE REPAIR | IN SANTA CLARA COUNTY IN SAN JOSE FROM 0.4 KM NORTH OF BRAHNAM LANE OVERCROSSING TO 0.4 KM NORTH OF VIRGINIA STREET OVERCROSSING | 04/20/2011 | 1 (04/20/2011) | Details CEM-3701 Report |
3773 | Project ID: 3773 DEA: 071189C4 | 07-VEN-150-150 | WIDEN ROADWAY AND BRIDGE RAILS | IN VENTURA COUNTY NEAR LIVE OAK ACRES AT SANTA ANA CREEK BRIDGE | 08/10/2010 | 1 (08/10/2010) | Details CEM-3701 Report |
2035 | Project ID: 2035 DEA: 04235634 EFIS: 0400000679 | 04-SM-101-0.9/3.6 | WIDEN ROADWAY AND BRIDGE AND REPLACE PEDESTRIAN OVERCROSSING. | SAN MATEO COUNTY IN MENLO PARK AND EAST PALO ALTO FROM UNIVERSITY AVENUE OVERCROSSING TO ROUTE 84/101 SEPARATION | 10/18/2013 | 1 (12/06/2011) | Details CEM-3701 Report |
5303 | Project ID: 5303 DEA: 08476104 | 08-SBD-15-185.15,191.5 | WIDEN ROADWAY AND BRIDGE | IN SAN BERNARDINO COUNTY NEAR BAKER FROM 5.9 KM NORTH OF AFTON ROAD OVERCROSSING TO 2.3 KM SOUTH OF BASIN ROAD OVERCROSSING | 07/29/2010 | 1 (07/29/2010) | Details CEM-3701 Report |
3084 | Project ID: 3084 DEA: 060C5204 | 06-MAD-99-R12.0 | WIDEN ROADWAY , REPLACE BARRIER ON BRIDGES, AND INSTALL TRAFFIC SIGNALS | 04/21/2011 | 1 (06/24/2008) | Details CEM-3701 Report | |
215744 | Project ID: 215744 DEA: 033H93U4 EFIS: 0321000091 | 03-YUB,BUT-70-25.5/25.8,0.0/3.8 | WIDEN ROADWAY & SHOULDER, ADD TURN LANES & CONSTRUCT BRIDGE. | YUBA AND BUTTE COUNTIES ABOUT 11 MILES NORTH OF MARYSVILLE FROM 0.8 MILE NORTH OF CHANDLER ROAD TO 0.2 MILE SOUTH OF EAST GRIDLEY ROAD | 1 (05/20/2021) | Details CEM-3701 Report | |
801 | Project ID: 801 DEA: 030A4104 | 03-PLA-49-3.2 | WIDEN ROADWAY | IN PLACER COUNTY IN AUBURN FROM FULWEILER AVENUE TO WILLOW CREEKAVENUE | 12/17/2012 | 1 (01/09/2007) | Details CEM-3701 Report |