Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 15871-15880 of 17549 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
994101 | Project ID: 994101 Permit Numbers: 1121NUJ0319 11226DP0462 | 11---12.17/12.74 | 1. POSTMILE: SD 12.17INTERSECTION OF CAMINO DEL REY AND SR-76OPEN CUT PIT AT BEND NEAR THOROUGHBRED ROAD AND CIPP THE EXISTING 12-INCH VITRIFIED CLAY PIPE A TOTAL940 FT DOWNSTREAM WITHIN CALTRANS ROW AND INSTALL 12-INCH PRIMUS LINE INSIDE OF CIPP LINED PIPE.2. POSTMILE: SD 12.36SR-76/OLD MISSION RO | ROUTE 76, BONSALL | 1 (09/14/2022) | Details CEM-3701 Report | |
214699 | Project ID: 214699 Permit Numbers: 0718NMC1840 0719NRT2839 0720NRT0484 | 07---23.043/-1 | 1. Grind and resurface roadway pavement on Verdugo Blvd., repair broken curb, gutter, sidewalk, upgrade the wheelchair ramps to make them ADA compliant; install pavement stripping.2. Traffic signal modification at Verdugo Blvd. and 2 freeway off-ramp.3. Traffic ControlPlease see attached plans | Verdugo Boulevard, Glendale | 06/17/2021 | 1 (02/10/2020) | Details CEM-3701 Report |
209606 | Project ID: 209606 Permit Numbers: 0312NSN0282 | 03-YOL-113-1.1/1.1 | 1. EV, Bike, and Ped surface improvements with a bike circle2. relocation/replacement of path lighting within footprint3. traffic signal modification - limited to resetting the bike push button and det. loop on south leg and addition of EV preemption devices | Russell Blvd, Davis | 04/27/2018 | 1 (05/20/2014) | Details CEM-3701 Report |
3527 | Project ID: 3527 EFIS: 0000001155 Permit Numbers: 07026CM1610 | 07-LA-405-.107 | 1-405 FREWAY SB RAMPS AT 190TH STREET | 03/21/2013 | 1 (03/21/2013) | Details CEM-3701 Report | |
3039 | Project ID: 3039 Permit Numbers: 0609NSN0903 | 06-FRE-145-34.62/34.62 | 1) increase radii of curb returns on SE and SW corners of the Kearney Blvd intersection with SR-145, and 2) add a right turn lane to westbound Kearney Blvd approaching SR 145, and 3) Install 2 drain inlets and 36 feet of 10-inch concrete pipe, and 4) repleace | Madera Avenue, Kerman | 04/27/2018 | 2 (11/25/2014) | Details CEM-3701 Report |
2019 | Project ID: 2019 DEA: 04219934 EFIS: 0400000636 | 04-SON-101-31.2/31.5 | 0406-6DP-1216 (Contractor's permit number); 0406-NMC-0350 (original permit issued to the town of Windsor) 0406-NRD-1253 (a rider reflecting some District directed change) | WINDSOR-ARATA LANE INTERCHANGE PROJECT PHASE 2A | 06/08/2020 | 1 (05/11/2007) | Details CEM-3701 Report |
7187 | Project ID: 7187 DEA: 04014044 EFIS: 0400000038 | 04-ALA-80- | 04-014041 SFOBB Maintenance Complex "" Paint Shop, Vehicle Maintenance, Electrical Maintenance "ยข Building project near the SFOBB toll plaza in Oakland. Project consists of three phases. Currently in PS&E phase with 50% plans in. | 05/18/2021 | 1 (02/21/2012) | Details CEM-3701 Report | |
213349 | Project ID: 213349 DEA: 010J0904 EFIS: 0118000167 | 01-MEN-1-37.00/38.50, 37.0/38.5 | 01-0J0904 | 01/11/2021 | 1 (08/24/2018) | Details CEM-3701 Report | |
212183 | Project ID: 212183 DEA: 112T1754 EFIS: 1112000004 Permit Numbers: 1116NMC0643 | 11-SD-5-1580 | 0.3 Mile north of La Jolla Village Dr. Overcrossing | 0.3 Mile north of La Jolla Village Dr. Overcrossing | 2 (09/21/2017) | Details CEM-3701 Report | |
5998 | Project ID: 5998 DEA: 11091894 | 11-SD-125-14.8 | 0.1KM WEST OF RTE 5 TO 0.1KM SOUTH OF BONITA MEADOWS LANE | 08/02/2010 | NOT VERIFIED | Details CEM-3701 Report |