Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 15181-15190 of 17771 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
1272 | Project ID: 1272 DEA: 034C4904 | 03-YOL-16-19.2/19.9 | CASCHE CREEK CASIN0 SIGNALS AND LIGHTING | 06/18/2020 | 1 (11/21/2014) | Details CEM-3701 Report | |
215277 | Project ID: 215277 DEA: 020J0904 EFIS: 0219000056 | 02-TRI,TRI-299-40.8/41.2 | CARR FIRE LANDSLIDE REPAIR | 11/09/2020 | 1 (10/29/2020) | Details CEM-3701 Report | |
1970 | Project ID: 1970 DEA: 041G4004 EFIS: 0400020030 | 04-SOL-- | CARQUINEZ BRIDGE ABUTMENT 1 EXPANSION JOINT SEAL ASSEMBLY REPAIR. | 06/08/2020 | 1 (05/26/2010) | Details CEM-3701 Report | |
3959 | Project ID: 3959 DEA: 072159C4 EFIS: 0700000339 | 07-LA-5-001.8/003.0 | CARMENITA INTERCHANGE IMPROVEMENT | LOS ANGELES COUNTY IN SANTA FE SPRINGS AND NORWALK FROM ALONDRA BOULEVARD OVERCROSSING TO SHOEMAKER AVENUE OVERCROSSING | 08/16/2018 | 1 (05/01/2012) | Details CEM-3701 Report |
994239 | Project ID: 994239 DEA: 010H0214 EFIS: 0118000107 | 01-HUM-169-19.0/33.0 | Cappell Walls | HUMBOLDT COUNTY NEAR PECWAN FROM 3.4 MILES WEST OF CAPPELL CREEK BRIDGE TO 0.4 MILE EAST OF WEITCHPEC SCHOOL ROAD (Description of Work: Construct Soldier Pile Wall, Install Drainage, Place HMA (Type A)) | 1 (09/22/2022) | Details CEM-3701 Report | |
6598 | Project ID: 6598 DEA: 120H0304 EFIS: 1200020064 | 12-ORA-142-2.5/6.3 | CAPITAL PREVENTIVE MAINTENANCE. RESURFACING AC IN BOTH DIRECTIONS | ORANGE COUNTY IN BREA FROM BREA HILLS AVENUE TO SAN BERNARDINO COUNTY LINE | 03/21/2013 | 1 (03/07/2012) | Details CEM-3701 Report |
211903 | Project ID: 211903 DEA: 042K5504 EFIS: 0416000444 | 04-SF-35-2.0/3.2 | CAPITAL PREVENTIVE MAINTENANCE AND CROSSWALK ENHANCEMENT IMPROVEMENTS | THE CITY AND COUNTY OF SAN FRANCISCO FROM SKYLINE BOULEVARD TO 19TH AVENUE | 12/17/2019 | 1 (07/05/2017) | Details CEM-3701 Report |
214703 | Project ID: 214703 DEA: 034F1724 EFIS: 0318000216 MINOR: 03A2999 | 03-YOL-16-25.1 - 25.5 | Capay 016 Improvements | IN CAPAY FROM 0.1 MILE WEST OF CAPAY CANAL BRIDGE TO 0,3 MILE WEST OF COUNTY ROAD 85. | 08/24/2022 | 1 (03/09/2020) | Details CEM-3701 Report |
213266 | Project ID: 213266 DEA: 103A1304 EFIS: 1000000412 COOP: 100480 | 10-MER-140-38.1/38.7 | Campus Parkway/SR140 project. Significant work includes CIP P/S bridge, piles, and lighting. | In Merced County on State Route 140 and the future connector road. | 02/10/2021 | 2 (04/04/2018) | Details CEM-3701 Report |
213398 | Project ID: 213398 DEA: 034E6200 EFIS: 0314000039 | 03-ED-50-21.9-24.5 | Camino Safety Project | Near Placerville and Camino from 0.2 mile west of Still Meadows Road to 0.4 mile east of Upper Carson Road | 1 (01/08/2019) | Details CEM-3701 Report |