Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 141-150 of 16960 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
1801 | Project ID: 1801 DEA: 04129564 | 04-SON-101-22.4/25.0 | WIDEN TO 6 LANES AND RECONSTRUCT WILFRED AVE INTERCHANGE | 06/08/2020 | 1 (10/20/2008) | Details CEM-3701 Report | |
2934 | Project ID: 2934 DEA: 05129104 | 05-SCR-1-15.8 | WIDEN TO 6 LANES | IN SANTA CRUZ COUNTY IN AND NEARSANTA CRUZ AT VARIOUS LOCATIONS | 04/20/2011 | 1 (04/20/2011) | Details CEM-3701 Report |
4322 | Project ID: 4322 DEA: 07472504 | 07-LA-105-R4.7/R15.4 | WIDEN TO 6 LANE FREEWAY | 09/09/2009 | NOT VERIFIED | Details CEM-3701 Report | |
1104 | Project ID: 1104 DEA: 033A2704 EFIS: 0300000447 COOP: 032450 Permit Numbers: 0309NMC0202 | 03-BUT-99-004.1/004.7 | WIDEN TO 5 LNS, INST SIGNAL, CURB SIDEWALK, GUTTER, STORM DRAIN SYSTEM IN GRIDLEY | 12/21/2017 | 2 (11/21/2014) | Details CEM-3701 Report | |
208682 | Project ID: 208682 DEA: 083401U4 EFIS: 0800000609 | 08-SBD-138,138-6.2/6.4,2.3/R15.2 | WIDEN TO 4 LNS FR BEEKLEY RD TO JCT 15, ADD 1 LN EB FR PHELAN RD TO | SAN BERNARDINO COUNTY ON ROUTE 138 NEAR PHELAN FROM 0.6 MILE WEST OF PHELAN ROAD TO THE JUNCTION OF ROUTE 15 AND ON ROUTE 2 FROM 0.1 MILE NORTH OF WILD HORSE CANYON ROAD TO ROUTE 138 | 06/23/2021 | 1 (03/11/2013) | Details CEM-3701 Report |
5348 | Project ID: 5348 DEA: 09214614 | 09-INY-395-124.0/147.4 | WIDEN TO 4 LANE EXPRESSWAY | 07/29/2010 | 1 (07/29/2010) | Details CEM-3701 Report | |
6815 | Project ID: 6815 EFIS: 0000001155 Permit Numbers: 12106MC0496 | 12-ORA-1-4.91/4.91 | widen the Vista del Sol entrance at PCH. Work will include removal and replacement of the eastern curb return; removal and replacement concrete curb, pavement, & cross-gutter; removal and replacement of asphalt pavement; relocation of 2 traffic signal | 09/08/2016 | NOT VERIFIED | Details CEM-3701 Report | |
3019 | Project ID: 3019 Permit Numbers: 06086CD0326 0610NRW0005 | 06-FRE-180-42.639/42.639 | Widen the southeast corner of intersection of State Routes 145 and 180. Remove and replace existing curb, ramps, gutter and sidewalk. Restripe crosswalks in intersection. Modify signal system. Replace signal pole in southeast corner. Replace control | SR 180 and SR 145, Kerman | 04/27/2018 | 2 (11/21/2014) | Details CEM-3701 Report |
213990 | Project ID: 213990 Permit Numbers: 0418NMC1977 04196DP0569 | 04---6.18/6.18 | Widen the sidewalk along Lafayette Street for approximately 500-feet under the SR-237 undercrossing. | Lafayette Street @ 237, San Jose /Santa Clara | 1 (03/08/2019) | Details CEM-3701 Report | |
994294 | Project ID: 994294 DEA: 07204904 EFIS: 0717000022 | 07-LA-405-39.1 | WIDEN THE ON-RAMP AND MODIFY ELECTRICAL SYSTEM. | THE CITY AND COUNTY OF LOS ANGELES AT VENTURA BOULEVARD ON RAMP | 1 (10/06/2022) | Details CEM-3701 Report |