Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 14471-14480 of 15560 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
213811 | Project ID: 213811 DEA: 112T2184 EFIS: 1116000174 | 11-SD-5-R38.4/R47.3 | (Alternative Delivery) Construct HOV lanes, soundwalls, culvert rehab, ITS, and bike trail on I-5 . NCC I-5 Highway Improvement. | IN SAN DIEGO COUNTY IN ENCINITAS AND CARLSBAD FROM SAN ELIJO LAGOON BRIDGE TO 0.3 MILE NORTH OF PALOMAR AIRPORT ROAD OVERCROSSING. | 1 (12/19/2018) | Details Personnel CEM-3701 Report | |
211848 | Project ID: 211848 DEA: 112T2174 EFIS: 1116000131 | 11-SD-5-R37.4 - R46.5 | (Alternative Delivery) CMGC, San Elijo Highway Bridge Replacement. Replace the San Elijo lagoon highway bridge, construct HOV lanes, construct bike and pedestrian trails and bridge, build multi-use facility at Manchester Ave. | IN SAN DIEGO COUNTY IN SOLANA BEACH AND ENCINITAS FROM 0.1 MILE NORTH OF LOMAS SANTA FE DRIVE OVERCROSSING TO 0.2 MILE SOUTH OF BIRMINGHAM DRIVE OVERCROSSING | 1 (01/31/2017) | Details Personnel CEM-3701 Report | |
209693 | Project ID: 209693 DEA: 112T1704 EFIS: 1100000757 | 11-SD-I-5- | (Alternative Delivery) CMGC Project. Soundwalls. Construct soundwalls on private proptery. | From Lomas Santa Fe Dr. to SR 78, | 1 (08/06/2015) | Details Personnel CEM-3701 Report | |
213789 | Project ID: 213789 DEA: 112T2114 EFIS: 1114000059 | 11-SD-5- | (Alternative Delivery) 6211(130)I-5 Batiquitos Lagoon Bridge | 1 (01/04/2019) | Details Personnel CEM-3701 Report | ||
213918 | Project ID: 213918 DEA: 063HT014 EFIS: 0615000116 | 06--- | (Alternative Delivery) | 2 (02/04/2019) | Details Personnel CEM-3701 Report | ||
993753 | Project ID: 993753 DEA: 010M0604 EFIS: 0122000082 | 01-MEN, MEN/MEN,MEN/MEN-101-55.1/64.7 | "Remove failing pavement, replace/repair damaged sections, restore roadway (striping/delineation), traffic control and other items as required" | 1 (04/19/2022) | Details Personnel CEM-3701 Report | ||
993357 | Project ID: 993357 DEA: 061C9304 EFIS: 0622000034 | 06-KER, Ker,KER-155-50/58 | "Fell/remove 2000 hazardous burned trees, repair damaged culverts, clear debris, erosion control, traffic control" | 1 (11/15/2021) | Details Personnel CEM-3701 Report | ||
993359 | Project ID: 993359 DEA: 051P0404 EFIS: 0521000160 | 05-SLO-46-9.699999999999999/9.699999999999999 | "Excavate and replace failed section of corrugated metal pipe. Line entire culvert. Repair sinkhole and restore failed highway embankment. Provide temporary traffic control." | 1 (11/01/2021) | Details Personnel CEM-3701 Report | ||
764 | Project ID: 764 DEA: 031E9304 Permit Numbers: 0307NMC0539 | 03-NEV-89-.74/.79 | 12/17/2012 | NOT VERIFIED | Details Personnel CEM-3701 Report | ||
1602 | Project ID: 1602 DEA: 040A2424 | 04-SM-35-35 | 11/04/2010 | NOT VERIFIED | Details Personnel CEM-3701 Report |