Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 14431-14440 of 16001 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
213821 | Project ID: 213821 Permit Numbers: 03186TN1303 | 03--70-1.2/1.2 | AsBuilts Install approximately 330 feet of 48" drain pipe and 60" steel casing east to west from the River Oaks Detention Basin, under SR 70, and terminating in the Algodon Slough/Canal. | State Route 70, Plumas Lake | 1 (10/05/2020) | Details Personnel CEM-3701 Report | |
215752 | Project ID: 215752 Permit Numbers: 0319NCS1389 | 03-SAC-99-20.85 | ASB Restripe 47th avenue, slurry seal, rebuild raised medians. Install ADA sidewalks,curb, gutter and traffic signal modifications. | 47th Avenue, Sacramento | 08/22/2022 | 1 (05/26/2021) | Details Personnel CEM-3701 Report |
213820 | Project ID: 213820 Permit Numbers: 0318NUJ1318 | 03--80-14.96/14.96 | ASB Jack and bore under I-80 and install 20" steel pipe | Interstate-80, Newcastle | 05/14/2020 | NOT VERIFIED | Details Personnel CEM-3701 Report |
214754 | Project ID: 214754 Permit Numbers: 0319NSN0166 | 03---33.36 | ASB Install signal, widen Elkhorn, hand holes, conduits, modify existing striping & signage, relocate street light, and install new interconnect with new signal to serve future Greenbriar project signals.This work started under cancelled permit 0318-NSN0534. It was cancelled because the scope o | Elkhorn Boulevard, Sacramento | 04/07/2021 | 1 (03/16/2020) | Details Personnel CEM-3701 Report |
212016 | Project ID: 212016 Permit Numbers: 04166DP2697 0415NMC1245 | 04-ALA-238-7.9/7.9 | As part of the HWY safety improvement project,this federally funded project will improve the safety of the intersection at Mission Blvd (Route 238) and Blanche St. currently,the pedestrian crosswalk is unprotected and is a route to an existing school on the east side of Mission Blvd. | Mission Blvd, Hayward | 11/30/00-1 | NOT VERIFIED | Details Personnel CEM-3701 Report |
211422 | Project ID: 211422 Permit Numbers: 04166DP0370 0415NSN1457 04176RT0232 0417NRT0118 | 04----1/-1 | As part of the El Camino Real crosswalk improvements project (City project. | El Camino Real, Santa Clara | 01/18/2019 | 1 (04/19/2016) | Details Personnel CEM-3701 Report |
993449 | Project ID: 993449 EFIS: 0000001157 Permit Numbers: 0421NMC0745 0421NRT3817 | 04-SCL--22.665 | As part of a larger complete streets and green infrastructure project, the work within the STATE Highway right-of-way will:Perform clearing and grubbing. Remove concrete. Grind 2" AC repave with 2" RHMA. Rebuild PCC sidewalks and curb ramps on 3 of 4 comers. Shorten the curb radius on 2 co | ECR, Palo Alto | 1 (12/17/2021) | Details Personnel CEM-3701 Report | |
215006 | Project ID: 215006 DEA: 010J5104 EFIS: 0119000046 | 01-HUM-101-87.8/R90.1 | Arcata Overlay | 06/27/2022 | 1 (06/18/2020) | Details Personnel CEM-3701 Report | |
215189 | Project ID: 215189 COOP: CML5131(020) | CM--20- | ARCADIA GOLD LINE STATION PEDESTRIAN LINKAGE PROJECT | AROUND THE GOLD LINE ARCADIA STATION | NOT VERIFIED | Details Personnel CEM-3701 Report | |
6872 | Project ID: 6872 DEA: 023E9004 | 02-SIS-97-34.5/40.0 | AR CHIP SEAL | SISKIYOU COUNTY NEAR MACDOEL FROM 1.6 MILES SOUTH OF BALL MOUNTAIN ROAD TO 0.1 MILE SOUTH OF JUNIPER KNOLL ROAD | 07/24/2012 | 1 (12/12/2011) | Details Personnel CEM-3701 Report |