Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 14171-14180 of 17829 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
215590 | Project ID: 215590 DEA: 112N0414 EFIS: 1118000184 | 11-IMP-115-R8.8/L11.4 | COLD PLANE, PAVE WITH HMA, PLACE MICROSURFACING AND SHOULDER BACKING. | IMPERIAL COUNTY IN AND NEAR HOLTVILLE FROM TOWLAND ROAD TO WEST JUNCTION EVAN HEWES HIGHWAY. | 05/10/2022 | 1 (07/23/2021) | Details CEM-3701 Report |
8222 | Project ID: 8222 DEA: 080P3804 EFIS: 0800001024 | 08-SBD-83,210-R0.0/7.2,R30.2/R33.2 | COLD PLANE, OVERLAY, REPLACE AC SUFACING AND PLACE MICRO-SURFACE | SAN BERNARDINO COUNTY IN CHINO, ONTARIO, HIGHLAND AND REDLANDS ON ROUTE 83 FROM ROUTE 71/83 SEPARATION TO ROUTE 60/83 SEPARATION AND ON ROUTE 210 FROM FIFTH STREET OVERCROSSING TO ROUTE 10/210 SEPARATION. | 11/27/2013 | 1 (07/24/2013) | Details CEM-3701 Report |
1000602 | Project ID: 1000602 DEA: 040K6404 EFIS: 0416000112 | 04-SOL-80-15.9/30.2 | COLD PLANE, OVERLAY, MGS, RAMP METERING, LIGHTING AND SIGNAL. | SOLANO COUNTY ON ROUTE 80 IN AND NEAR FAIRFIELD AND VACAVILLE AT VARIOUS LOCATIONS FROM 1.5 MILES EAST OF SUISUN VALLEY ROAD OVERCROSSING TO 0.8 MILE EAST OF LEISURE TOWN ROAD OVERCROSSING. | 1 (10/07/2024) | Details CEM-3701 Report | |
209252 | Project ID: 209252 DEA: 080G6204 EFIS: 0800000218 | 08-SBD-38-15.0/49.5 | COLD PLANE, OVERLAY, CENTERLINE RUMBLE STRIPS AND MIDWEST GUARDRAIL | SAN BERNARDINO COUNTY NEAR ANGELUS OAKS FROM VALLEY OF THE FALLS DRIVE TO NORTH JUNCTION OF ROUTE 18 NEAR BIG BEAR LAKE | 05/16/2016 | 1 (04/16/2014) | Details CEM-3701 Report |
995232 | Project ID: 995232 DEA: 120U1704 EFIS: 1223000051 | 12-ORA-133,261-9.8/12.6,0.0/3.5 | COLD PLANE, OVERLAY, AND REFRESH PAVEMENT DELINEATION. | ORANGE COUNTY IN IRVINE ON ROUTE 133 FROM TECHNOLOGY DRIVE UNDERCROSSING TO PORTOLA PARKWAY UNDERCROSSING AND ON ROUTE 261 FROM WALNUT AVENUE OVERCROSSING TO 0.6 MILE NORTH OF PORTOLA PARKWAY OVERCROSSING | 09/20/2024 | 1 (10/16/2023) | Details CEM-3701 Report |
212911 | Project ID: 212911 DEA: 081F9404 EFIS: 0815000067 | 08-RIV-79-R4.7/R10.6 | COLD PLANE, OVERLAY WITH RUBBERIZED HOT MIX ASPHALT (TYPE G) | RIVERSIDE COUNTY FROM 0.1 MILE SOUTH OF MURRIETA HOT SPRINGS ROAD TO 0.1MILE NORTH OF ABELIA ROAD | 06/23/2021 | 1 (12/28/2018) | Details CEM-3701 Report |
209364 | Project ID: 209364 DEA: 112M4904 EFIS: 1100020424 | 11-SD-79-35.1/53.0 | COLD PLANE, OVERLAY WITH RUBBERIZED HMA, PLACE RUMBLE STRIPS. | SAN DIEGO COUNTY AT WARNER SPRINGS, SUNSHINE SUMMIT AND OAK GROVE FROM CAMINO SAN IGNACIO TO RIVERSIDE COUNTY LINE | 11/25/2014 | NOT VERIFIED | Details CEM-3701 Report |
209454 | Project ID: 209454 DEA: 081C1304 EFIS: 0812000261 | 08-RIV-111-47.2/T50.0 | COLD PLANE, OVERLAY WITH RHMA-TYPE G, AND REPLACE AC SURFACING | PALM SPRINGS FROM 0.1 MILE SOUTH OF GOLF CLUB DRIVE TO 0.6 MILE NORTH OF RAMON ROAD | 11/26/2014 | 1 (04/16/2014) | Details CEM-3701 Report |
208730 | Project ID: 208730 DEA: 081C3604 EFIS: 0812000301 | 08-RIV-74-42.6/47.9 | COLD PLANE, OVERLAY WITH RHMA-G, REPLACE ASPHALT CONCRETE DIGOUTS | RIVERSIDE COUNTY IN AND NEAR HEMET FROM DARTMOUTH STREET TO 0.7 MILE EAST OF WILLOWBROOK ROAD | 12/09/2013 | 1 (10/08/2013) | Details CEM-3701 Report |
5002 | Project ID: 5002 DEA: 080K6104 | 08-SBd-259-0.0/1.5 | COLD PLANE, OVERLAY WITH HMA(TYPE A) AND REPLACE AC SURFACING | 07/29/2010 | 1 (07/29/2010) | Details CEM-3701 Report |