Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 14131-14140 of 16644 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
209457 | Project ID: 209457 DEA: 112M6304 EFIS: 1113000094 | 11-SD-5,44-24.1/34.9 | COLD IN-PLACE RECYCLING. | SAN DIEGO COUNTY NEAR PALA AND PAUMA VALLEY FROM PALA MISSION ROAD TO 2.0 MILES WEST OF RED GATE ROAD | 06/02/2015 | NOT VERIFIED | Details CEM-3701 Report |
993651 | Project ID: 993651 DEA: 112N1144 EFIS: 1121000143 | 11-IMP-78-34.0/41.0 | COLD IN-PLACE RECYCLING, RHMA-G OVERLAY, PAVEMENT MARKINGS. | IMPERIAL COUNTY NEAR AND AT GLAMIS FROM 6.7 MILES EAST OF EAST HIGHLINE CANAL TO TED KIPF ROAD | 03/27/2023 | 1 (03/29/2022) | Details CEM-3701 Report |
214628 | Project ID: 214628 DEA: 031G6604 EFIS: 0319000116 | 03-BUT-162-12.6/15.6 | COLD IN-PLACE RECYCLING, RHMA-G OVERLAY, AND COLD PLANE AC PAVEMENT. | BUTTE COUNTY IN AND NEAR OROVILLE FROM 0.8 MILE EAST OF WILBUR ROAD TO FEATHER RIVER BRIDGE | 07/09/2021 | 1 (03/24/2020) | Details CEM-3701 Report |
214533 | Project ID: 214533 DEA: 11430524 EFIS: 1119000009 | 11-IMP-98-39.6/45.2 | COLD IN-PLACE RECYCLING, PLACE RHMA, SHOULDER BACKING & RUMBLE STRIP. | IMPERIAL COUNTY NEAR CALEXICO FROM ROUTE 7 TO 0.1 MILE WEST OF EAST HIGHLINE CANAL BRIDGE. | 10/08/2020 | 1 (02/11/2020) | Details CEM-3701 Report |
5140 | Project ID: 5140 DEA: 080P3604 | 08-SBD-62-106.0/122.0 | COLD IN-PLACE RECYCLING, OVERLAY WITH HMA (TYPE A), SHOULDER BACKING | SAN BERNARDINO COUNTY NEAR VIDAL FROM 1.2 MILES WEST OF BLYTHE ROAD TO 3.8 MILES WEST OF ROUTE 95/62 SEPARATION | 06/08/2012 | 1 (06/08/2012) | Details CEM-3701 Report |
208622 | Project ID: 208622 DEA: 060P7304 EFIS: 0612000248 | 06-KER,KIN-58,269-15.4/21.7,0.0/5.6 | COLD IN-PLACE RECYCLING, COLD PLANE AND OVERLAY WITH HOT MIX ASPHALT. | KERN AND KINGS COUNTIES NEAR MCKITTRICK ON ROUTE 58 FROM 0.1 MILE EAST OF ROUTE 33 TO 6.5 MILES EAST OF ROUTE 33 AND NEAR AVENAL ON ROUTE 269 FROM ROUTE 33 TO FRESNO COUNTY LINE | 10/08/2014 | NOT VERIFIED | Details CEM-3701 Report |
210219 | Project ID: 210219 DEA: 060T1704 EFIS: 0615000408 | 06-KER-58-28.2/31.5 | COLD IN-PLACE RECYCLING, COLD PLANE AND HMA (TYPE A) OVERLAY. | KERN COUNTY IN BUTTONWILLOW FROM 0.4 MILE EAST OF MAIN DRAIN CANAL BRIDGE TO 0.2 MILE WEST OF ROUTE 5/58 SEPARATION | 04/05/2021 | 1 (03/23/2015) | Details CEM-3701 Report |
211710 | Project ID: 211710 DEA: 051G1504 EFIS: 0514000113 | 05-SLO-41-19.7/R42.2 | COLD IN-PLACE RECYCLING, COLD PLANE AC PAVEMENT AND RHMA-G. | SAN LUIS OBISPO COUNTY NEAR ATASCADERO FROM 0.3 MILE WEST OF HOMESTEAD ROAD TO ROUTE 46 | 02/09/2018 | 1 (10/26/2016) | Details CEM-3701 Report |
209448 | Project ID: 209448 DEA: 033M9204 EFIS: 0300020533 | 03-ED-193-R6.0/12.7 | COLD IN-PLACE RECYCLING WITH HOT MIX ASPHALT OVERLAY | EL DORADO COUNTY NEAR GEORGETOWN FROM 0.2 MILE WEST OF SLIGER MINE ROAD TO MAIN STREET | 02/06/2015 | 1 (05/20/2014) | Details CEM-3701 Report |
208720 | Project ID: 208720 DEA: 034M1604 EFIS: 0300020056 | 03-BUT-32-11.3/R15.5 | COLD IN-PLACE RECYCLING WITH HMA OVERLAY, REPLACE AC SURFACING, | BUTTE COUNTY IN AND NEAR CHICO FROM EL MONTE AVENUE TO 0.3 MILE EAST OF HUMBOLDT ROAD | 10/08/2014 | 1 (01/15/2014) | Details CEM-3701 Report |