Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 13961-13970 of 17829 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
994203 | Project ID: 994203 DEA: 120Q2704 EFIS: 1216000117 | 12-ORA-57-22.0 | CONSTRUCT A NEW DETENTION BASIN. | ORANGE COUNTY NEAR BREA AT TONNER CANYON ROAD UNDERCROSSING | 09/17/2024 | 1 (05/26/2023) | Details CEM-3701 Report |
6460 | Project ID: 6460 EFIS: 0000001155 Permit Numbers: 1208NMC0418 | 12-ORA-22-9.38/9.38 | CONSTRUCT A NEW CITY STREET WHICH WOULD BE A FOURTH LEG OF AN EXISTING INTERSECTION AT WESTBOUND SR-22/METROPOLITAN DRIVE ON/OFF-RAMPS IN THE CITY OF ORANGE. CONSTRUCTION WORK INCLUDES SIDEWALK, CURB & GUTTER, CURB RAMPS AND A NEW STREET. IN ADDITION | WB SR-22 RAMPS, ORANGE | 09/08/2016 | NOT VERIFIED | Details CEM-3701 Report |
1000604 | Project ID: 1000604 DEA: 07355604 | 07-LA-105-R2.0 | CONSTRUCT A MAINTENANCE EQUIPMENT TRAINING CENTER. | LOS ANGELES COUNTY IN LOS ANGELES AT 0.1 MILE WEST OF ROUTE 105/405 SEPARATION | 1 (09/24/2024) | Details CEM-3701 Report | |
213149 | Project ID: 213149 DEA: 043K9704 EFIS: 0417000227 Permit Numbers: 0418NOP2127 | 04-SM-101-6.2 | Construct a joint-use path (Pedestrian under-crossing) under US 101 from Bair Island Road to Convention Way. The Bair Island Road US 101 Undercrossing Project (Project), will connect Bair Island Road east of US 101 | Redwood City, Bair Island Rd connect with Convention Way under 101 | 11/16/2021 | 2 (02/21/2018) | Details CEM-3701 Report |
214170 | Project ID: 214170 DEA: 101K8704 EFIS: 1019000110 MINOR: 10A2126 | 10-SJ-99-31.7/31.8 | Construct a iron fence around the river bridge soffit edges & install secured maintenance access gates. | In San Joaquin County around the Mokelumne River bridge | 01/03/2023 | 1 (06/26/2019) | Details CEM-3701 Report |
6276 | Project ID: 6276 DEA: 112T0004 | 11-SD-52,67-27.4/28.5,R1.8/R4.3 | CONSTRUCT A FREEWAY AND INTERCHANGE | 06/27/2011 | 1 (12/27/2011) | Details CEM-3701 Report | |
5929 | Project ID: 5929 DEA: 11010614 | 11-SD-52,67,125-VAR | CONSTRUCT A FOUR LANE FREEWAY | 05/10/2011 | 1 (10/26/2011) | Details CEM-3701 Report | |
993288 | Project ID: 993288 Permit Numbers: 05216MC0352 0521NRD0826 05216RT1104 | 05---49.01/49.03 | construct a dedicated westbound right turn lane on Union Rd at the SR 25 intersection, modify the signal to provide protected left turn phasing in the eastbound & westbound directions, reconstruct northeast corner including curb, gutter, sidewalk, curb ramp, drainage inlet and adjust existing t | Airline Highway (SR 25), Hollister | 10/24/2022 | 1 (10/25/2021) | Details CEM-3701 Report |
5991 | Project ID: 5991 Permit Numbers: 1108NMC0485 11096DP0385 | 11-SD-67-15.12 | CONSTRUCT A DECELERATION LANE AND MODIFY THE EXISTING SIGNAL | 08/01/2018 | NOT VERIFIED | Details CEM-3701 Report | |
8235 | Project ID: 8235 DEA: 050G1604 EFIS: 0500000056 Permit Numbers: 05116RC0621 | 05-SB-166-4.5/4.5 | Construct a commercial roadway connection and left turn lane to a Caltrans constructed driveway across from Black Road on Caltrans Project 05-0G160; Caltrans constructed driveway and applicant constructed connection to driveway will replace the existing a | 2165 Main Street, Santa Maria | 09/17/2018 | 1 (04/29/2013) | Details CEM-3701 Report |