Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 13951-13960 of 17845 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
1481 | Project ID: 1481 EFIS: 0000001155 Permit Numbers: 0406NMC1370 | 04-SCL-82-13.7 | CONSTRUCT A REINFORCED CONCRETE FLOW CHANNEL ALONG THE CALABAZAS CREEK | 05/04/2011 | NOT VERIFIED | Details CEM-3701 Report | |
2945 | Project ID: 2945 DEA: 05300164 | 05-SLO-1-na | CONSTRUCT A REINFORCED CONCRETE BR OVER LEFFINGWELL CREEK MOONSTONE BEACH DR | Cambria, CA | 09/06/2019 | NOT VERIFIED | Details CEM-3701 Report |
213241 | Project ID: 213241 DEA: 042K5904 EFIS: 0416000455 Permit Numbers: 0418NOP0565 04186DP0589 | 04-SM-SR-84-26.4 / 27.6 | Construct a Pedestrian Overcrossing Bridge that is part of the Facebook Campus Expansion Project Bayfront Expressway Improvements project located in the City of Menlo Park. This bridge will crossover the Bayfront Expressway (State Route 84) and will link | City of Menlo Park | 12/15/2022 | 2 (01/04/2019) | Details CEM-3701 Report |
1557 | Project ID: 1557 DEA: 042A9804 EFIS: 0400000848 Permit Numbers: 0408NMC0672 0408NDP0783 | 04-SCL-85-23.4/23.6 | CONSTRUCT A PEDESTRIAN AND BICYCLE OVERCROSSING OVER MOFFET BLVD AND THE NB OFF-RAMP AND CONSTRUCT APPROACH RAMPS TO THE OVERCROSSING W/ RETAINING WALLS | 10/13/2015 | NOT VERIFIED | Details CEM-3701 Report | |
210327 | Project ID: 210327 DEA: 044H3304 EFIS: 0413000209 COOP: 042569 | 04-SM-101-11.0/11.2 | Construct a pedestrian and bicycle overcrossing on the south side of the US 101/Hillsdale Boulevard interchanges, with intergraded bicycle and pedestrian network connections to Hillsdale Boulevard intersections on both sides of the interchange | On south side of the US 101/Hillsdale Boulevard interchanges | 2 (11/04/2019) | Details CEM-3701 Report | |
147 | Project ID: 147 DEA: 01461104 EFIS: 0100000247 MINOR: 01A0980 | 01-LAK-29-8.9 | CONSTRUCT A PARK AND RIDE FACILITY IN MIDDLETOWN | 01/24/2013 | 1 (01/24/2013) | Details CEM-3701 Report | |
6446 | Project ID: 6446 Permit Numbers: 1207NMC0638 | 12-ORA-22-6.81 | CONSTRUCT A NORHTBOUND RIGHT LANE ON EUCLID STREET AND INCLUDE TRAFFIC SIGNAL MODIFICATION | 09/08/2016 | NOT VERIFIED | Details CEM-3701 Report | |
214869 | Project ID: 214869 DEA: 044H1304 EFIS: 0413000094 | 04-SCL-101-50.7 | Construct a new, year-round bicycle and pedestrian overcrossing over Highway 101 | Adobe Creek in the City of Palo Alto. | 11/02/2021 | 2 (03/23/2020) | Details CEM-3701 Report |
210084 | Project ID: 210084 Permit Numbers: 10136SN0657 10146DP0695 | 10-STA-132-16.624/16.624 | Construct a new traffic signal, signs, crosswalk, striping and related work according to the approved plans. New signal is at the Yosemite Blvd. (State Highway 132)/South Morton Blvd. intersection and the curb gutter pan improvements at the Yosemite Blvd./South Santa Rosa Ave. intersection, in the | SR 132, Modesto | 12/18/2018 | 1 (12/19/2014) | Details CEM-3701 Report |
373 | Project ID: 373 EFIS: 0000001155 Permit Numbers: 0208NSN0208 | 02-SHA-273--1/-1 | Construct a new traffic signal and intersection improvements, including new ADA ramps, new RABA stop, turn lanes, interconnection with existing traffic signals, upgrade of the existing Alexander Avenue railroad crossing and removal of existing flashing be | Highway 273, Anderson | 02/06/2015 | 2 (06/20/2014) | Details CEM-3701 Report |