Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 13801-13810 of 17447 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
209771 | Project ID: 209771 Permit Numbers: 07146MC0361 | 07-LA-60-12.88/12.88 | Construct 4th leg of existing t-intersection. Modify traffic signal. | Route 60, Industry | 07/31/2018 | 1 (12/02/2014) | Details CEM-3701 Report |
3404 | Project ID: 3404 DEA: 06342514 | 06-FRE-180-R106.3/116.4 | Construct 4-lanes Concrete Pavement Expressway. | 12/13/2012 | 1 (01/12/2011) | Details CEM-3701 Report | |
211487 | Project ID: 211487 DEA: 120L7204 EFIS: 1200020180 | 12-ORA-74-2.9/5.0 | CONSTRUCT 4-FOOT RIGHT SHOULDER, PAVE TURNOUTS, REPLACE/ADD MBGR | ORANGE COUNTY NEAR SAN JUAN CAPISTRANO FROM 0.3 MILE EAST OF ANTONIO PKWY/LA PATA AVENUE TO 0.2 MILE WEST OF CONROCK PLANT ENTRANCE AND CASPER WILDERNESS PARK | 12/31/2019 | 1 (11/14/2016) | Details CEM-3701 Report |
215315 | Project ID: 215315 DEA: 081H8304 EFIS: 0817000139 | 08-SBD,SBD-138-0/2.3 | CONSTRUCT 4' MEDIAN | SAN BERNARDINO COUNTY ALONG ROUTE 138 | 1 (06/24/2021) | Details CEM-3701 Report | |
3015 | Project ID: 3015 Permit Numbers: 0607NDP0279 0606NMC0960 0607NDP0260 | 06-FRE-180-R53.4/R55.9 | CONSTRUCT 4 LANE TO 6 LANE FACILITY | 05/24/2011 | NOT VERIFIED | Details CEM-3701 Report | |
209503 | Project ID: 209503 DEA: 11257154 EFIS: 1100020489 | 11-SD-76,15-R46.2/R46.8, R12.1/R17.7 | CONSTRUCT 4 LANE HIGHWAY. | SAN DIEGO COUNTY NEAR BONSALL AND FALLBROOK ON ROUTE 15 FROM 0.3 MILE SOUTH TO 0.3 MILE NORTH OF ROUTE 76/15 SEPARATION AND ON ROUTE 76 FROM 0.4 MILE WEST OF SOUTH MISSION ROAD TO 0.5 MILE EAST OF ROUTE 76/15 SEPARATION | 08/16/2021 | 1 (08/25/2014) | Details CEM-3701 Report |
1097 | Project ID: 1097 DEA: 033822V4 | 03-BUT-70,99,149- | CONSTRUCT 4 LANE EXPRESSWAY WITH INTERCHANGES | 03/22/2011 | 1 (03/22/2011) | Details CEM-3701 Report | |
214321 | Project ID: 214321 DEA: 012982U4 EFIS: 0118000125 | 01-LAK-29,175-28.5/31.6,8.2/8.5 | CONSTRUCT 4 LANE EXPRESSWAY WITH EARTHWORK AND PAVING. | LAKE COUNTY NEAR KELSEYVILLE ON ROUTE 29 FROM 0.6 MILE TO 3.7 MILES NORTH OF ROUTE 281 AND ON ROUTE 175 FROM SOUTH JUNCTION ROUTE 29 TO 0.3 MILE EAST OF SOUTH JUNCTION ROUTE 29 | 1 (08/19/2019) | Details CEM-3701 Report | |
902 | Project ID: 902 DEA: 031A4614 | 03-SUT-99,113-26.6/37.4,R26.6 | CONSTRUCT 4 LANE EXPRESSWAY AND ASPHALT PAVEMENT | 12/17/2012 | 1 (12/08/2009) | Details CEM-3701 Report | |
6023 | Project ID: 6023 DEA: 11167884 | 11-IMP-78,111-R19.5/R24.5,37.6/38.5 | CONSTRUCT 4 LANE DIVIDED EXPRESSWAY AND INTERCHANGE: 78/111 Brawley Bypass | Brawley, CA | 06/29/2011 | 1 (10/26/2011) | Details CEM-3701 Report |