Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 13771-13780 of 17447 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
210494 | Project ID: 210494 DEA: 04014134 EFIS: 0415000182 COOP: 042561 | 04-ALA-80-2.0 | Construct a new parking lot driveway entry to improve ingress/egress and facilitate DEPARTMENT maintenance operations- Interurban Electric Railway Bridge | Yard Shop (IERBYS) | 2 (11/12/2015) | Details CEM-3701 Report | |
210616 | Project ID: 210616 DEA: 043G8304 EFIS: 0413000198 COOP: 042585 | 04-CC-239-NEW | Construct a new multimodal transportation alignment connecting State Route (SR) 4 just south of Balfour Road, in Brentwood, to the existing Interstate 580 and Interstate 205 interchange | In eastern Alameda County | 2 (11/04/2019) | Details CEM-3701 Report | |
7493 | Project ID: 7493 DEA: 03371504 EFIS: 0300000426 COOP: 030375 Permit Numbers: 0312NMC0111 | 03-SAC--34.7/25.9 | Construct a new interchange, including an eight lane wide overcrossing | At the location of Elverta Road and Highway 99 | 03/09/2020 | 1 (12/13/2012) | Details CEM-3701 Report |
994084 | Project ID: 994084 DEA: 060U8804 EFIS: 0616000074 | 06-TUL-99-26.3/27.6 | CONSTRUCT A NEW INTERCHANGE AT COMMERCIAL AVENUE NOW CALLED INTERNATIONAL AGRI-CENTER WAY | ON STATE ROUTE 99 | 1 (03/13/2023) | Details CEM-3701 Report | |
994203 | Project ID: 994203 DEA: 120Q2704 EFIS: 1216000117 | 12-ORA-57-22.0 | CONSTRUCT A NEW DETENTION BASIN. | ORANGE COUNTY NEAR BREA AT TONNER CANYON ROAD UNDERCROSSING | 1 (05/26/2023) | Details CEM-3701 Report | |
6460 | Project ID: 6460 EFIS: 0000001155 Permit Numbers: 1208NMC0418 | 12-ORA-22-9.38/9.38 | CONSTRUCT A NEW CITY STREET WHICH WOULD BE A FOURTH LEG OF AN EXISTING INTERSECTION AT WESTBOUND SR-22/METROPOLITAN DRIVE ON/OFF-RAMPS IN THE CITY OF ORANGE. CONSTRUCTION WORK INCLUDES SIDEWALK, CURB & GUTTER, CURB RAMPS AND A NEW STREET. IN ADDITION | WB SR-22 RAMPS, ORANGE | 09/08/2016 | NOT VERIFIED | Details CEM-3701 Report |
213149 | Project ID: 213149 DEA: 043K9704 EFIS: 0417000227 Permit Numbers: 0418NOP2127 | 04-SM-101-6.2 | Construct a joint-use path (Pedestrian under-crossing) under US 101 from Bair Island Road to Convention Way. The Bair Island Road US 101 Undercrossing Project (Project), will connect Bair Island Road east of US 101 | Redwood City, Bair Island Rd connect with Convention Way under 101 | 11/16/2021 | 2 (02/21/2018) | Details CEM-3701 Report |
214170 | Project ID: 214170 DEA: 101K8704 EFIS: 1019000110 MINOR: 10A2126 | 10-SJ-99-31.7/31.8 | Construct a iron fence around the river bridge soffit edges & install secured maintenance access gates. | In San Joaquin County around the Mokelumne River bridge | 01/03/2023 | 1 (06/26/2019) | Details CEM-3701 Report |
6276 | Project ID: 6276 DEA: 112T0004 | 11-SD-52,67-27.4/28.5,R1.8/R4.3 | CONSTRUCT A FREEWAY AND INTERCHANGE | 06/27/2011 | 1 (12/27/2011) | Details CEM-3701 Report | |
5929 | Project ID: 5929 DEA: 11010614 | 11-SD-52,67,125-VAR | CONSTRUCT A FOUR LANE FREEWAY | 05/10/2011 | 1 (10/26/2011) | Details CEM-3701 Report |