Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 13761-13770 of 17447 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
1557 | Project ID: 1557 DEA: 042A9804 EFIS: 0400000848 Permit Numbers: 0408NMC0672 0408NDP0783 | 04-SCL-85-23.4/23.6 | CONSTRUCT A PEDESTRIAN AND BICYCLE OVERCROSSING OVER MOFFET BLVD AND THE NB OFF-RAMP AND CONSTRUCT APPROACH RAMPS TO THE OVERCROSSING W/ RETAINING WALLS | 10/13/2015 | NOT VERIFIED | Details CEM-3701 Report | |
210327 | Project ID: 210327 DEA: 044H3304 EFIS: 0413000209 COOP: 042569 | 04-SM-101-11.0/11.2 | Construct a pedestrian and bicycle overcrossing on the south side of the US 101/Hillsdale Boulevard interchanges, with intergraded bicycle and pedestrian network connections to Hillsdale Boulevard intersections on both sides of the interchange | On south side of the US 101/Hillsdale Boulevard interchanges | 2 (11/04/2019) | Details CEM-3701 Report | |
147 | Project ID: 147 DEA: 01461104 EFIS: 0100000247 MINOR: 01A0980 | 01-LAK-29-8.9 | CONSTRUCT A PARK AND RIDE FACILITY IN MIDDLETOWN | 01/24/2013 | 1 (01/24/2013) | Details CEM-3701 Report | |
6446 | Project ID: 6446 Permit Numbers: 1207NMC0638 | 12-ORA-22-6.81 | CONSTRUCT A NORHTBOUND RIGHT LANE ON EUCLID STREET AND INCLUDE TRAFFIC SIGNAL MODIFICATION | 09/08/2016 | NOT VERIFIED | Details CEM-3701 Report | |
214869 | Project ID: 214869 DEA: 044H1304 EFIS: 0413000094 | 04-SCL-101-50.7 | Construct a new, year-round bicycle and pedestrian overcrossing over Highway 101 | Adobe Creek in the City of Palo Alto. | 11/02/2021 | 2 (03/23/2020) | Details CEM-3701 Report |
210084 | Project ID: 210084 Permit Numbers: 10136SN0657 10146DP0695 | 10-STA-132-16.624/16.624 | Construct a new traffic signal, signs, crosswalk, striping and related work according to the approved plans. New signal is at the Yosemite Blvd. (State Highway 132)/South Morton Blvd. intersection and the curb gutter pan improvements at the Yosemite Blvd./South Santa Rosa Ave. intersection, in the | SR 132, Modesto | 12/18/2018 | 1 (12/19/2014) | Details CEM-3701 Report |
373 | Project ID: 373 EFIS: 0000001155 Permit Numbers: 0208NSN0208 | 02-SHA-273--1/-1 | Construct a new traffic signal and intersection improvements, including new ADA ramps, new RABA stop, turn lanes, interconnection with existing traffic signals, upgrade of the existing Alexander Avenue railroad crossing and removal of existing flashing be | Highway 273, Anderson | 02/06/2015 | 2 (06/20/2014) | Details CEM-3701 Report |
5479 | Project ID: 5479 DEA: 10036RP0686 EFIS: 0000001155 Permit Numbers: 10036RP0686 10056DP0374 1005NRD0351 | 10-AMA-88-16.59/17.15 | Construct a new road approach Dalton Road to State Highway 88. Work will involve widening of the northerly side of the highway to accommodate eastbound left turn lane, westbound acceleration and deceleration lanes, and eight foot (2.4m) shoulders. Install | No data (Data from archives), No data (Data from archives) | 02/20/2014 | NOT VERIFIED | Details CEM-3701 Report |
1555 | Project ID: 1555 EFIS: 0000001155 Permit Numbers: 0408NMC0446 | 04-CC-680-6.76/6.76 | Construct a new right turn travel lane. | Sycamore Valley Rd., Danville | 08/31/2018 | NOT VERIFIED | Details CEM-3701 Report |
214199 | Project ID: 214199 DEA: 024F4204 EFIS: 0212000111 COOP: 020155 Permit Numbers: 0219NRP0130 | 02-LAS-36-26.79 | Construct a new public road connection and signal on SR 36. Project includes on intersection of signal and light poles. | SR-36 at connection of new Skyline Road extension (PM 26.79) in Susanville, Lassen County. | 04/15/2020 | 2 (06/03/2019) | Details CEM-3701 Report |