Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 13711-13720 of 17331 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
2945Project ID: 2945
DEA: 05300164
05-SLO-1-naCONSTRUCT A REINFORCED CONCRETE BR OVER LEFFINGWELL CREEK MOONSTONE BEACH DRCambria, CA09/06/2019NOT VERIFIEDDetails CEM-3701 Report
213241Project ID: 213241
DEA: 042K5904
EFIS: 0416000455
Permit Numbers: 0418NOP0565 04186DP0589
04-SM-SR-84-26.4 / 27.6Construct a Pedestrian Overcrossing Bridge that is part of the Facebook Campus Expansion Project Bayfront Expressway Improvements project located in the City of Menlo Park. This bridge will crossover the Bayfront Expressway (State Route 84) and will linkCity of Menlo Park12/15/20222 (01/04/2019)Details CEM-3701 Report
1557Project ID: 1557
DEA: 042A9804
EFIS: 0400000848
Permit Numbers: 0408NMC0672 0408NDP0783
04-SCL-85-23.4/23.6CONSTRUCT A PEDESTRIAN AND BICYCLE OVERCROSSING OVER MOFFET BLVD AND THE NB OFF-RAMP AND CONSTRUCT APPROACH RAMPS TO THE OVERCROSSING W/ RETAINING WALLS 10/13/2015NOT VERIFIEDDetails CEM-3701 Report
210327Project ID: 210327
DEA: 044H3304
EFIS: 0413000209
COOP: 042569
04-SM-101-11.0/11.2Construct a pedestrian and bicycle overcrossing on the south side of the US 101/Hillsdale Boulevard interchanges, with intergraded bicycle and pedestrian network connections to Hillsdale Boulevard intersections on both sides of the interchangeOn south side of the US 101/Hillsdale Boulevard interchanges 2 (11/04/2019)Details CEM-3701 Report
147Project ID: 147
DEA: 01461104
EFIS: 0100000247
MINOR: 01A0980
01-LAK-29-8.9CONSTRUCT A PARK AND RIDE FACILITY IN MIDDLETOWN 01/24/20131 (01/24/2013)Details CEM-3701 Report
6446Project ID: 6446
Permit Numbers: 1207NMC0638
12-ORA-22-6.81CONSTRUCT A NORHTBOUND RIGHT LANE ON EUCLID STREET AND INCLUDE TRAFFIC SIGNAL MODIFICATION 09/08/2016NOT VERIFIEDDetails CEM-3701 Report
214869Project ID: 214869
DEA: 044H1304
EFIS: 0413000094
04-SCL-101-50.7Construct a new, year-round bicycle and pedestrian overcrossing over Highway 101Adobe Creek in the City of Palo Alto.11/02/20212 (03/23/2020)Details CEM-3701 Report
210084Project ID: 210084
Permit Numbers: 10136SN0657 10146DP0695
10-STA-132-16.624/16.624Construct a new traffic signal, signs, crosswalk, striping and related work according to the approved plans. New signal is at the Yosemite Blvd. (State Highway 132)/South Morton Blvd. intersection and the curb gutter pan improvements at the Yosemite Blvd./South Santa Rosa Ave. intersection, in theSR 132, Modesto12/18/20181 (12/19/2014)Details CEM-3701 Report
373Project ID: 373
EFIS: 0000001155
Permit Numbers: 0208NSN0208
02-SHA-273--1/-1Construct a new traffic signal and intersection improvements, including new ADA ramps, new RABA stop, turn lanes, interconnection with existing traffic signals, upgrade of the existing Alexander Avenue railroad crossing and removal of existing flashing beHighway 273, Anderson02/06/20152 (06/20/2014)Details CEM-3701 Report
5479Project ID: 5479
DEA: 10036RP0686
EFIS: 0000001155
Permit Numbers: 10036RP0686 10056DP0374 1005NRD0351
10-AMA-88-16.59/17.15Construct a new road approach Dalton Road to State Highway 88. Work will involve widening of the northerly side of the highway to accommodate eastbound left turn lane, westbound acceleration and deceleration lanes, and eight foot (2.4m) shoulders. InstallNo data (Data from archives), No data (Data from archives)02/20/2014NOT VERIFIEDDetails CEM-3701 Report