Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 13461-13470 of 17775 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
2074 | Project ID: 2074 DEA: 04264064 EFIS: 0400000732 | 04-MRN-101-18.6/R22.3 | CONSTRUCT HOV LANES AND WIDEN BRIDGE | MARIN COUNTY IN AND NEAR NOVATO FROM ROUTE 37 TO ATHERTON AVENUE | 12/14/2012 | 1 (03/19/2012) | Details CEM-3701 Report |
4528 | Project ID: 4528 DEA: 08007174 | 08-SBD-215-7.8/10.4 | CONSTRUCT HOV LANES AND OVERPASSES | In the City of San Bernardino on Rte 215, between Inland Center Drive and I-10 | 10/28/2011 | 1 (10/28/2011) | Details CEM-3701 Report |
211260 | Project ID: 211260 DEA: 072159U4 EFIS: 0715000160 | 07-LA,ORA-5-0.0/1.5, 44.3/44.4 | CONSTRUCT HOV LANES AND MIX FLOW LANES. | LOS ANGELES AND ORANGE COUNTIES IN BUENA PARK, LA MIRADA, CERRITOS AND SANTA FE SPRINGS FROM ARTESIA BOULEVARD UNDERCROSSING TO NORTH FORK COYOTE CREEK | 08/01/2023 | 1 (03/16/2016) | Details CEM-3701 Report |
6281 | Project ID: 6281 DEA: 112T0404 EFIS: 1100000446 | 11-SD-5,805-R49.9/R51.7,42.6/46.5 | CONSTRUCT HOV LANES AND DIRECT ACCESS RAMP. | SAN DIEGO COUNTY IN SAN DIEGO ON ROUTE 805 FROM 0.3 KM SOUTH OF SOLEDAD CANYON BRIDGE AND OVERHEAD TO 0.6 KM NORTH OF ROUTE 5/805 SEPARATION AND ON ROUTE 5 FROM 0.6 KM NORTH OF ROUTE 5/805 SEPARATION TO 0.5 KM NORTH OF CARMEL MOUNTAIN ROAD UNDERCROSSING. | 07/07/2015 | 1 (12/20/2010) | Details CEM-3701 Report |
1089 | Project ID: 1089 DEA: 03367824 | 03-SAC,PLA-80-28.1/29.0 | CONSTRUCT HOV LANES | 09/13/2012 | 1 (12/07/2009) | Details CEM-3701 Report | |
1090 | Project ID: 1090 DEA: 03367834 EFIS: 0300000420 | 03-PLA-80-4.5/8.3 | CONSTRUCT HOV LANES | 06/17/2013 | 1 (12/07/2009) | Details CEM-3701 Report | |
1596 | Project ID: 1596 DEA: 040A1804 EFIS: 0400000140 COOP: 042104A6 | 04-SON-101-7.5/13.9 | Construct HOV Lanes | From Old Redwood Highway to Rohnert Park Expressway | 08/19/2019 | NOT VERIFIED | Details CEM-3701 Report |
213002 | Project ID: 213002 DEA: 042640N4 EFIS: 0412000649 | 04-MRN,SON-101-MRN27.0/27.6SON0.0/4.5 | CONSTRUCT HOV LANES | MARIN AND SONOMA COUNTIES IN AND NEAR PETALUMA FROM 0.6 MILE SOUTH OF SAN ANTONIO CREEK BRIDGE TO 0.3 MILE SOUTH OF EAST WASHINGTON STREET OVER CROSSING | 03/12/2021 | 1 (04/13/2018) | Details CEM-3701 Report |
214460 | Project ID: 214460 DEA: 050N7014 EFIS: 0518000112 | 05-SBT-101-1.4/4.8 | CONSTRUCT HOV LANES | PADARO LANE IN CARPINTERIA | 1 (02/21/2020) | Details CEM-3701 Report | |
209046 | Project ID: 209046 DEA: 120F96E4 EFIS: 1200020279 | 12-ORA-5,162-6.2/8.7 | CONSTRUCT HOV LANE. RECONSTRUCT RAMPS AND STRUCTURES WIDENING, | ORANGE COUNTY FROM 0.4 MILE NORTH OF CAMINO DE ESTRELLA OVERCROSSING TO 0.2 MILE SOUTH OF SAN JUAN CREEK ROAD UNDERCROSSING | 01/09/2020 | 1 (02/24/2014) | Details CEM-3701 Report |