Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 13451-13460 of 17758 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
3771 | Project ID: 3771 DEA: 071178U4 | 07-LA-405-25.9 | CONSTRUCT HOV LANES: LA-405, Widen Freeway HOV Lanes: LA-405, Widen Freeway HOV Lanes | IN LOS ANGELES COUNTY AT VARIOUS LOCATIONS | 08/26/2010 | 1 (08/26/2010) | Details CEM-3701 Report |
209139 | Project ID: 209139 DEA: 071170U4 EFIS: 0700000085 | 07-LA-10-33.2/37.2 | CONSTRUCT HOV LANES, WIDEN BRIDGES, AND REALIGN RAMPS. | LOS ANGELES COUNTY IN BALDWIN PARK AND WEST COVINA FROM 0.1 MILE WEST OF PUENTE AVENUE UNDERCROSSING TO 0.2 MILE EAST OF HOLLENBECK STREET UNDERCROSSING | 03/01/2022 | 1 (05/06/2014) | Details CEM-3701 Report |
210735 | Project ID: 210735 DEA: 071193U4 EFIS: 0713000007 | 07-LA-10-37.2/42.4 | CONSTRUCT HOV LANES, WIDEN BRIDGES, AND REALIGN RAMPS. | IN LA COUNTY FROM CITRUS STREET IN WEST COVINA TO ROUTE 57 IN POMONA | 07/11/2022 | 1 (03/07/2016) | Details CEM-3701 Report |
3807 | Project ID: 3807 DEA: 07121844 EFIS: 0700000117 | 07-LA-5-42.8/47.3 | CONSTRUCT HOV LANES, RETAINING WALLS AND SOUND WALLS. | LOS ANGELES COUNTY IN LOS ANGELES, GLENDALE, AND BURBANK FROM ROUTE 5/134 SEPARATION TO MAGNOLIA BOULEVARD OVERCROSSING | 06/30/2021 | 1 (02/23/2012) | Details CEM-3701 Report |
3770 | Project ID: 3770 DEA: 07117074 EFIS: 0700000083 | 07-LA-10-50.2/53.4 | Construct HOV Lanes, Retaining Walls And Sound Walls | 03/16/2016 | 1 (11/27/2012) | Details CEM-3701 Report | |
3811 | Project ID: 3811 DEA: 071219U4 EFIS: 0700001829 | 07-LA-5,170-58.0/63.4,R32.3/R33.1 | Construct HOV lanes, connectors and replace slabs. | LOS ANGELES COUNTY IN LOS ANGELES ON ROUTE 5 FROM 0.1 KM NORTH OF SHELDON STREET OVERCROSSING TO ROUTE 5/118 SEPARATION AND ON ROUTE 170 FROM 0.1 KM SOUTH OF ARLETA/SHELDON UNDERCROSSING TO ROUTE 5/170 SEPARATION | 08/25/2016 | 1 (08/16/2012) | Details CEM-3701 Report |
5266 | Project ID: 5266 DEA: 08448404 EFIS: 0800000712 COOP: 081488A1 | 08-RIV-91-15.6/21.6 | CONSTRUCT HOV LANES AND WIDEN BRIDGES. | RIVERSIDE COUNTY IN RIVERSIDE FROM ADAMS STREET TO THE ROUTE 60/215 SEPARATION | 07/27/2023 | 1 (04/27/2012) | Details CEM-3701 Report |
2074 | Project ID: 2074 DEA: 04264064 EFIS: 0400000732 | 04-MRN-101-18.6/R22.3 | CONSTRUCT HOV LANES AND WIDEN BRIDGE | MARIN COUNTY IN AND NEAR NOVATO FROM ROUTE 37 TO ATHERTON AVENUE | 12/14/2012 | 1 (03/19/2012) | Details CEM-3701 Report |
4528 | Project ID: 4528 DEA: 08007174 | 08-SBD-215-7.8/10.4 | CONSTRUCT HOV LANES AND OVERPASSES | In the City of San Bernardino on Rte 215, between Inland Center Drive and I-10 | 10/28/2011 | 1 (10/28/2011) | Details CEM-3701 Report |
211260 | Project ID: 211260 DEA: 072159U4 EFIS: 0715000160 | 07-LA,ORA-5-0.0/1.5, 44.3/44.4 | CONSTRUCT HOV LANES AND MIX FLOW LANES. | LOS ANGELES AND ORANGE COUNTIES IN BUENA PARK, LA MIRADA, CERRITOS AND SANTA FE SPRINGS FROM ARTESIA BOULEVARD UNDERCROSSING TO NORTH FORK COYOTE CREEK | 08/01/2023 | 1 (03/16/2016) | Details CEM-3701 Report |