Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 13361-13370 of 18115 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
993607 | Project ID: 993607 DEA: 07322604 EFIS: 0716000057 | 07-LA-210-R41.3/R44.6 | CONSTRUCT POLLUTION INFILTRATION AREAS AND AUSTIN VAULT SAND FILTER. | LOS ANGELES COUNTY IN GLENDORA AT VARIOUS LOCATIONS FROM 0.2 MILE EAST OF BARRANCA AVENUE OVERCROSSING TO 0.1 MILE WEST OF AMELIA AVENUE UNDERCROSSING | 03/13/2025 | 1 (05/11/2022) | Details CEM-3701 Report |
270 | Project ID: 270 DEA: 01482404 EFIS: 0100000396 | 01-HUM-299-0.7 | CONSTRUCT PLANTING HOLES AND INSTALL IRRIGATION SYSTEM. | HUMBOLDT COUNTY IN ARCATA ON GIUNTOLI LANE 0.2 MILE WEST OF GIUNTOLI LANE OVERCROSSING | 02/02/2012 | 1 (02/21/2012) | Details CEM-3701 Report |
1000874 | Project ID: 1000874 DEA: 041K7604 EFIS: 0416000310 | 04-SON-1-45.4 | CONSTRUCT PIPE CULVERT WINGWALL AND DRAINAGE INLET. | SONOMA COUNTY NEAR STEWARTS POINT AT 2.7 MILES SOUTH OF SKAGGS SPRINGS ROAD | 1 (12/30/2024) | Details CEM-3701 Report | |
208568 | Project ID: 208568 DEA: 03372804 EFIS: 0300000428 Permit Numbers: 0312NMC0382 | 03-ED-50-15.6/17 | Construct Phase 1A - Interchange Improvement | Ray Lawyer Dr WB on Ramp to US 50 and Fair Lane Road | 12/08/2017 | 2 (03/01/2013) | Details CEM-3701 Report |
7463 | Project ID: 7463 DEA: 042640U4 EFIS: 0412000195 | 04-SON-101-0.9/3.6 | CONSTRUCT PETALUMA BLVD SOUTH INTERCHANGE, REPLACE PETALUMA RIVER BR | SONOMA COUNTY IN AND NEAR PETALUMA FROM GUNN DRIVE TO ROUTE 101/116 SEPARATION AND OVERHEAD | 06/03/2020 | 1 (09/11/2012) | Details CEM-3701 Report |
993197 | Project ID: 993197 DEA: 11422004 EFIS: 1115000173 | 11-SD-5-R31.8/R32.2,R32.8 | CONSTRUCT PERVIOUS CONCRETE, MINOR CONCRETE, HMA AND MODIFY LANDSCAPE. | SAN DIEGO COUNTY FROM CARMEL MOUNTAIN ROAD UNDERCROSSING TO 0.4 MILE NORTH AND AT 0.1 MILE SOUTH OF CARMEL VALLEY ROAD UNDERCROSSING | 04/08/2025 | 1 (10/22/2021) | Details CEM-3701 Report |
994781 | Project ID: 994781 DEA: 07322704 EFIS: 0716000067 | 07-VEN-1-1.3/26.6 | CONSTRUCT PERVIOUS CONCRETE PAVEMENT | VENTURA COUNTY AT VARIOUS LOCATIONS | 1 (07/13/2023) | Details CEM-3701 Report | |
212444 | Project ID: 212444 DEA: 044A3803 EFIS: 0400001129 COOP: 042636 | 04-SM-101-21.9 | CONSTRUCT PEDESTRIAN UNDERPASS, SSF Caltrain Station Relocation | Construction of pedestrian underpass lies within CT ROW under hwy 101 elevated structure and 101-SB off-ramp to Grand Ave. | 12/05/2022 | 2 (05/12/2017) | Details CEM-3701 Report |
211595 | Project ID: 211595 DEA: 060H6424 EFIS: 0614000266 | 06-KER-99-49.6 | CONSTRUCT PEDESTRIAN OVERCROSSING BRIDGE. | KERN COUNTY IN MCFARLAND AT KERN AVENUE PEDESTRIAN OVERCROSSING | 08/29/2018 | 1 (10/07/2016) | Details CEM-3701 Report |
215255 | Project ID: 215255 DEA: 040A7714 EFIS: 0420000287 | 04-ALA-80-6.4-6.6 | CONSTRUCT PEDESTRIAN OVERCROSSING BRIDGE AND RETAINING WALLS. GILMAN INTERCHANGE IMPROVEMENTS | ALAMEDA COUNTY IN BERKELEY FROM 0.6 MILE NORTH OF UNIVERSITY AVENUE OVERCROSSING TO 0.1 MILE SOUTH OF GILMAN STREET UNDERCROSSING | 12/01/2023 | 1 (12/07/2020) | Details CEM-3701 Report |