Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 17121-17130 of 17622 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
2038Project ID: 2038
DEA: 042409U4
04-SOL-80-12.9/20.8WIDEN FREEWAY AND BRIDGES, REHAB PAVEMENT AND UPGRADE MEDIAN BARRIER 07/29/20111 (07/29/2011)Details CEM-3701 Report
6428Project ID: 6428
DEA: 12071624
EFIS: 1200000036
12-ORA-22,405-R0.7/R2.9,20.4/22.3Widen freeway and construct bridges, retaining walls, and sound walls.ORANGE COUNTY IN GARDEN GROVE, WESTMINSTER AND SEAL BEACH ON ROUTE 405 FROM 0.2 MILE SOUTH OF BOLSA CHICA ROAD OVERCROSSING TO 0.4 MILE SOUTH OF SEAL BEACH BOULEVARD OVERCROSSING AND ON ROUTE 22 FROM 2.0 MILES EAST OF BOLSA CHICA ROAD OVERCROSSING TO ROUT05/11/20151 (09/11/2012)Details CEM-3701 Report
209019Project ID: 209019
DEA: 071952U4
EFIS: 0700000201
07-VEN-23,101-3.3/3.8,R0.1/R4.5WIDEN FREEWAY AND RAMPS AND RECONSTRUCT MEDIAN.VENTURA COUNTY IN THOUSAND OAKS ON ROUTE 101 FROM 0.6 MILE SOUTH OF WESTLAKE BOULEVARD OVERCROSSING TO 0.4 MILE NORTH OF MOORPARK ROAD UNDERCROSSING AND ON ROUTE 23 FROM ROUTE 101 TO 0.1 MILE NORTH OF HILLCREST DRIVE UNDERCROSSING06/25/20191 (08/13/2013)Details CEM-3701 Report
3812Project ID: 3812
DEA: 07122004
07-LA-5-39.4WIDEN FREEWAY AND STRUCTURESIN LOS ANGELES COUNTY INLOS ANGELES FROM ROUTE 118 AND 5SEPARATION TO 0.7 KM SOUTH OF ROUTE 14 AND 5 CONNECTOR OVERHEAD07/29/20101 (07/29/2010)Details CEM-3701 Report
209520Project ID: 209520
DEA: 06470904
EFIS: 0600000973
COOP: 061529
06-MAD-99-R7.5/15.1WIDEN FREEWAY FROM 4 LANES TO 6 LANES.MADERA COUNTY IN AND NEAR MADERA FROM AVENUE 12 OVERCROSSING TO 0.9 MILE NORTH OF AVENUE 17 OVERCROSSING05/11/20231 (03/16/2016)Details CEM-3701 Report
7610Project ID: 7610
DEA: 060G8304
EFIS: 0600020165
06-KER-99-17.0/22.1WIDEN FREEWAY FROM 6 LANES TO 8 LANES WITH PCC AND HMAKERN COUNTY IN BAKERSFIELD FROM 0.5 MILE SOUTH OF ROUTE 119 TO WILSON ROAD01/23/20151 (10/15/2012)Details CEM-3701 Report
3141Project ID: 3141
DEA: 060F3804
06-KER-58-52.5WIDEN FREEWAY LANE AND SHOULDERIN KERN COUNTY IN BAKERSFIELD FROM0.1 KM EAST OF ROUTE 58 AND 99SEPARATION TO 0.1 KM EAST OF SOUTHCHESTER AVENUE OVERCROSSING04/21/20111 (03/06/2007)Details CEM-3701 Report
2040Project ID: 2040
DEA: 04245414
04-SON-101-19.5WIDEN FREEWAY TO 6 LANESIN SONOMA COUNTY IN SANTA ROSA AT VARIOUS LOCATIONS07/29/20111 (07/29/2011)Details CEM-3701 Report
7115Project ID: 7115
DEA: 041G9404
EFIS: 0400021080
04-CC-4-27.3/R29.0WIDEN FREEWAY TO 8 LANES, RECONSTRUCT A ST. UC, RET. AND SOUND WALLSCONTRA COSTA COUNTY IN ANTIOCH FROM THE G STREET OVERCROSSING TO 0.1 MILE EAST OF HILLCREST AVENUE OVERCROSSING04/14/20211 (08/02/2012)Details CEM-3701 Report
1254Project ID: 1254
DEA: 03441614
EFIS: 0300000622
Permit Numbers: 0310NCS0001
03-SAC-50-R5.3/12.8WIDEN FREEWAY W/ HMA OVER CL2 AB AND STRUCTURES 02/06/20151 (03/07/2012)Details CEM-3701 Report