Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 17081-17090 of 18718 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 215462 | Project ID: 215462 DEA: 080C8704 EFIS: 0800000064 COOP: 081687 | 08-SBD-SR 60-R2.08/2.80 | The project scope of work is widening approximately .7 miles of SR-60 at Central Avenue to accommodate three through-lanes with provisions for a future lane, two left-turn lanes, standard shoulders, bike path, and sidewalk in both the northbound and southbound directions | Project Limits are SR-60 from 0.3 miles west to 0.4 miles east of Central Ave. PM 2.08/2.80 in Chino. | 2 (01/18/2021) | Details CEM-3701 Report | |
| 993179 | Project ID: 993179 Permit Numbers: 0421NOP1472 | 04-SCL--48.6 | The project will construct improvements along Shoreline Boulevard (Blvd) within the limits of the US 101 Interchange. The project improvements include conversion of the existing median to a reversible bus lane, elimination of access from northbound Shoreline Blvd to State Route 85 (SR85), construct | Shoreline Blvd. , Mountain View | 09/13/2022 | 1 (09/02/2021) | Details CEM-3701 Report |
| 1560 | Project ID: 1560 EFIS: 0000001155 Permit Numbers: 0408NMC0877 04096DP1102 04096RW1543 | 04-SCL-237-9.9/9.9 | The project will convert the on-ramp from Carlo St. to eastbound 237 to an off-ramp from eastbound Calaveras Blvd. to Carlo St. The off-ramp conversion will allow vehicles traveling eastbound on Calaveras Blvd to exit directly to the Milpitas Midtown Dist | Carlo St., Milpitas Main St. adjacent to the site on 237 ramp @ Carlo St. | 04/29/2011 | NOT VERIFIED | Details CEM-3701 Report |
| 994175 | Project ID: 994175 DEA: 044W4504 EFIS: 0422000152 COOP: 042860 Permit Numbers: 0422NOP4809 | 04-ALA-185-6.58/10.47 | The project will install pedestrian scale lighting to brighten the pedestrian experience and to help enliven the space for the community. Route 185 (International Boulevard is an active pedestrian and bicycle corridor | City of Oakland | 2 (09/20/2022) | Details CEM-3701 Report | |
| 212652 | Project ID: 212652 DEA: 042G2504 EFIS: 0400020638 | 04-CC-80- | The project will redirect I?80 westbound on?ramp traffic using multiple electronic variable message signs, including foundations and modifications to the existing electrical system. | 05/01/2019 | 2 (08/22/2017) | Details CEM-3701 Report | |
| 210432 | Project ID: 210432 Permit Numbers: 04156DP0639 0412NSN2041 | 04-CC-24-2.31/2.31 | The project will upgrade traffic signals to provide enhanced signal head placement for improved visibility,install/update signage for enhanced route guidance,and install bike route with shared lane arrows. | Camino Pablo (between Snata Maria Way & Brookwood Road), Orinda | 09/14/2018 | 1 (05/12/2015) | Details CEM-3701 Report |
| 210846 | Project ID: 210846 DEA: 044H1504 EFIS: 0413000105 Permit Numbers: 0414NMC2543 04156DP1531 | 04-SM-82-6.1/6.1 | The project will upgrades sidewalk,crosswalk,median,landscaping,lighting and pedestrian signal along El Camino Real (Route 82)from 500' north of and 200' south of Arroyo Ave in the Cityt of San Carlos. | SR 82 (El Camino Real), San Carlos | 08/22/2018 | 1 (10/01/2015) | Details CEM-3701 Report |
| 215328 | Project ID: 215328 DEA: 07217204 EFIS: 0713000315 COOP: 075178 | 07-LA-1-15.9 to 16.2 | The project will widen the intersection of PCH and Hawthorne Blvd to provide three through lanes, dual left-turn lanes and a right-turn lane on all approaches. intersection improvements including construction of jointed plain concrete, new appurtenances including curb, gutter, sidewalk, curb ramps, | City of Torrance in Los Angeles County (Caltrans district 7). On Route 1 (Pacific Coast Highway) from Post Mile (PM) 15.9 to PM 16.2 which corresponds to approximately 220' west of Neece Ave. to 242nd Street | 2 (01/04/2021) | Details CEM-3701 Report | |
| 212502 | Project ID: 212502 Permit Numbers: 0414NMC2455 04176DP1189 0418NRT0270 | 04-ALA-580-29.4/29.4 | The project,in general,consists of the installation of marked crosswalks,curb ramps;and modification of the existing traffic signal system,strom drain system,and pavement markings. | Redwood Road, Castro Valley | 01/18/2019 | 1 (06/07/2017) | Details CEM-3701 Report |
| 213464 | Project ID: 213464 Permit Numbers: 04156MC1658 0417NRD1957 | 04-ALA-238-2.5/2.5 | The proposed improvements include rough grading,installation of curb,gutter,5' sidewalk,underground electrical/gas/telecom utilities,potable waterline crossing,sanitary sewer pipeline crossing,street trees,two street lights,and landscaping. | 38861 Mission Boulevard, Fremont | 08/22/2018 | 1 (06/28/2018) | Details CEM-3701 Report |
