Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
6858 | Project ID: 6858 DEA: 043A7734 Permit Numbers: 0412NRT0901 0412NRT0913 0411NDP1529 0410NMC0139 | 04-CC--0/5 | The purpose of the I-80 Integrated Corridor Mobility (ICM) Traffic Signal Light Synchronization project (TLSP) is to assist in monitoring, and managing the traffic flow along the I-80 and State Route 123 corridor. | I-80 AND SR 123, Var | 08/16/2013 | 1 (12/21/2012) | Details CEM-3701 Report |
214924 | Project ID: 214924 DEA: 080M9004 EFIS: 0812000248 COOP: 081695 | 08-RIV-111-18.0/19.0 | The purpose of the project is to provide a grade separated crossing over the existing UPRR, SR-111 and Hammond Road in the Mecca Community that will provide the following benefits: provide a secondary access point to the Community of Mecca. | The project is in Riverside County from 0.47 miles east of State Route 86 to 0.45 miles west of Johnson Street. | 2 (04/22/2020) | Details CEM-3701 Report | |
210469 | Project ID: 210469 DEA: 042J1504 EFIS: 0414000432 | 04-CC-4,80,580,680-Var | THE REPLACEMENT OF OVERHEAD SIGNS WITH HIGH-PERFORMANCE REFLECTIVE SIGNS, REMOVAL OF EXISTING SIGNAGE LIGHTING, AND REMOVAL OF GANTRY CATWALKS ON SIGN-GANTRY STRUCTURES, WITHIN VARIOUS COUNTIES | IN CONTRA COSTA COUNTY AT VARIOUS LOCATIONS | 12/21/2017 | 1 (03/20/2017) | Details CEM-3701 Report |
209466 | Project ID: 209466 DEA: 041J6504 EFIS: 0414000313 | 04-SOL-84-12.09 | The required temporary repairs include replacing deteriorated timber planks and stringers, placing corrugated metal over the existing timber deck system, and replacing asphalt concrete surfacing. | Near Rio Vista at the Miner Slough Bridge | 05/26/2016 | 1 (03/31/2014) | Details CEM-3701 Report |
8159 | Project ID: 8159 Permit Numbers: 0412NMC0383 04136DP0013 0413NRW0185 | 04-ALA-123-4.4/4.43 | The San Pablo and Marin Avenue intersection consists of the following improvements:1. ADA compliant curb ramps.2. High visibility crosswalk in all four reaches of the intersection.3. Modified signal timing and equipment for eastbound bike/ped phase.4. Add | San Pablo Avenue , Albany | 10/21/2014 | 1 (11/28/2012) | Details CEM-3701 Report |
214677 | Project ID: 214677 DEA: 081F2604 EFIS: 0814000194 COOP: 081696 | 08-SBD-60-R7.83/R7.91 | The scope features right turn pockets, additional left turn pockets onto ramps from Archibald Avenue , widen ramps to accommodate additional lane and the enhancements of sidewalks,crosswalks amd curb ramps | SR-60 and Archibald Avenue between East Oak Hill and Monticello Place | 08/19/2021 | 2 (01/30/2020) | Details CEM-3701 Report |
210489 | Project ID: 210489 DEA: 080F6314 EFIS: 0813000220 | 08-SBD-395-11.2/16.6 | The scope of project is widening approximately 5 miles of US 395 from two lanes to four lanes, repave existing lanes, modify five signals, upgrade ADA access, add turn lanes, add sound walls, and extend bridge | Project Limits are PM 11.2 from 16.6 and US 395. | 08/19/2021 | 2 (01/03/2019) | Details CEM-3701 Report |
1000589 | Project ID: 1000589 DEA: 031N1504 EFIS: 0324000309 | 03-SAC-50-2.1 | The scope of work includes mobilization, mold removal, repair areas of building damaged by water intrusion, other damaged areas requiring repair, and incidental work. | Sacramento Translab located at 5900 Folsom Blvd, Sacramento, CA 95819 | 1 (11/15/2024) | Details CEM-3701 Report | |
994430 | Project ID: 994430 DEA: 061F1304 EFIS: 0623000086 | 06-KER-58-73.9/74.9 | The scope of work is to install, remove, and replace the damaged concrete barrier with a Type 50 barrier with a glared screen. A temporary K-Rail will be installed during construction and traffic control during the night. | 05/16/2024 | 1 (01/09/2023) | Details CEM-3701 Report | |
993919 | Project ID: 993919 DEA: 071XW704 EFIS: 0722000254 | 07-LA-103-1.59/1.59, 8.29/8.29 | The scope of work will be to repair damages to bridge structures, repair da maged slopes, construct hardscape to deter repeated damage to the State Highway System and to repair other damages to State assets | 08/25/2022 | 1 (08/25/2022) | Details CEM-3701 Report |