Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 16551-16560 of 18128 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
993836 | Project ID: 993836 Permit Numbers: 05226DP0383 05216RT1025 0522NRD0156 05226RW0366 05226RW0656 | 05---0.08/0.13 | The work done within the state highway right-of-way will be demolition of the current pavement on Atascadero road in order to construct pavement, curb and gutter and sidewalk in its current location. Additionally, there will be improvements to the underground storm drain and water utilities, as con | 405 Atascadero Rd, Morro Bay | 1 (05/23/2022) | Details CEM-3701 Report | |
209661 | Project ID: 209661 DEA: 044H1404 EFIS: 0413000093 MINOR: 04A4471 | 04-NAP-128-18.5 | The work involves removing damaged sections of a CMP arch culvert, welding headed studs to the existing corrugation peaks, and then welding wire fabric to those studs. Finally, structural concrete is placed to create a new, smooth, invert. | Nap-128-18.5, Soda Creek, Br. No 21-0062. | 06/08/2020 | 1 (06/09/2014) | Details CEM-3701 Report |
995505 | Project ID: 995505 Permit Numbers: 06226SN0463 | 06--SR119- | The work is included as part of the development of the northeast corner of SR 119 and South H Street. The proposed development will be a Love's Truck Stop. As part of the off-site work, the northeast return in the intersection will be modified, which will trigger traffic signal modifications. As | Northeast corner of SR 119 and South H Street. | 1 (11/27/2023) | Details CEM-3701 Report | |
7750 | Project ID: 7750 EFIS: 0000001155 Permit Numbers: 0412NRW1674 04126DP1702 0411NMC1581 04116DP1861 04126DP1702 | 04-NAP--0.6/0.6 | The work on American Canyon Road consists of road rehabilitation (FDR AND HMA ),curb and gutter, median relocation, bike lanes, striping and pavement markings, traffic loops and replacement of a broken water valve. | American Canyon Rd, American Canyon | 09/14/2018 | 1 (01/11/2013) | Details CEM-3701 Report |
7745 | Project ID: 7745 EFIS: 0000001155 Permit Numbers: 0412NMC0500 | 04-NAP-121-5.5/5.5 | The work proposed under this permit involves re-striping and minor signal work associated with adding a second left turn at the intersection of Imola Avenue(SR 121)and Gasser Dr. for the eastbound Imola to northbound Gasser Movement. | Imola Ave. / Gasser Dr. Intersection, Napa | 09/14/2018 | 1 (09/17/2012) | Details CEM-3701 Report |
7885 | Project ID: 7885 Permit Numbers: 04126DP1745 | 04-NAP-121-5.5/5.5 | The work proposed under this permit involves re-striping and minor signal work associated with adding a second left turn at the intersection of Imola Avenue(SR 121)and Gasser Dr. for the eastbound Imola to northbound Gasser Movement. | Imola Ave. / Gasser Dr. Intersection, Napa | 09/14/2018 | 1 (10/23/2012) | Details CEM-3701 Report |
213146 | Project ID: 213146 Permit Numbers: 0417NUC2741 | 04-SM-82-24.3/24.3 | The work that will be performed is located on Mission Street between the two driveways that provide access to 6967 Mission Street. The contractor will construct a new pole foundation 5 ft east of the existing streetlight location, relocate the existing streetlight fixture and pole, abandon the exis | 6967 Mission Street , Daly City | 11/30/00-1 | 1 (11/08/2019) | Details CEM-3701 Report |
993465 | Project ID: 993465 DEA: 041Q8504 EFIS: 0418000346 Permit Numbers: 0421NOP3462 04216DP3618 | 04---10.365 | The work to be done consists, in general, of clearing and grubbing, tree removal, demolition, site grading, site civil improvements, landscaping and irrigation, underground utilities, site striping and signage, drainage structures and storm drain pipes, traffic control system, site lighting, misc. | 954 Golden Gate Drive, Napa | 03/18/2025 | 1 (12/16/2021) | Details CEM-3701 Report |
7475 | Project ID: 7475 DEA: 04445604 EFIS: 0400001081 COOP: 042434 Permit Numbers: 0412NMC0872 0412NDP1643 | 04-SCL-280-5.1/5.2,0.0/0.8 | The work to be performed within STATE highway right-of-way includes the following:-Modify the existing I-880/Stevens creek blvd interchange from full clover to partial clover and diamond configuration, removing existing loop ramps and re-aligning, widening | In San Jose on Rte 280 from west of Patton Ave to 0.1 mile east of Rte 280/880 Separation on Rte 880 from, Rte 280/880 Separation to Forest Ave Undercrossing | 05/07/2019 | 2 (12/11/2012) | Details CEM-3701 Report |
215565 | Project ID: 215565 Permit Numbers: 0320AOP1078 | 03-ED-50-16.4/16.8 | The WPI Phase 2.2 Project will construct the east bound on-ramp from Ray Lawyer Drive onto US 50 within the city of Placerville | N/A, Placerville | 2 (04/19/2021) | Details CEM-3701 Report |